GILLESPIE CR (0914-19-033)

Items: 48

County: GILLESPIE
Length: N/A
Highway: CR
District: AUSTIN
Control Number: 0914-19-033
DBE Goal: N/A
Project: BR 2B20(089)
Guaranty: N/A
Time: 110 WORKING DAYS
Engineer's Estimate: $847,359.42
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$847,359.42
$1,025,365.00
Over/Under Est: 21.01% $178,005.58
Over/Under Est: 26.73% $226,499.08
Amt Left: 4.73% $48,493.50
Over/Under Est: 28.17% $238,738.58
Amt Left: 5.92% $60,733.00
Delta: -1.14% -$12,239.50
Over/Under Est: 28.63% $242,562.13
Amt Left: 6.3% $64,556.55
Delta: -0.35% -$3,823.55
$1,141,671.71
Over/Under Est: 34.73% $294,312.29
Amt Left: 11.34% $116,306.71
Delta: -4.75% -$51,750.16
$1,297,601.50
Over/Under Est: 53.13% $450,242.08
Amt Left: 26.55% $272,236.50
Delta: -13.66% -$155,929.79
Subcontractor Percentage Amount
HOUSTON SAWING & DRILLING 0.47% $4,838.52
BARRICADES UNLIMITED 0.00% $0.00
GK CONSTRUCTION, LLC 0.00% $0.00
J. R. (JOE) RAMON & SONS, INC. 0.00% $0.00
KING GEORGE TRAFFIC SOLUTIONS LLC 0.00% $0.00
RDZ PAVING, LLC 0.00% $0.00
TEXAS SHAFTS, INC. 0.00% $0.00
A K FUQUAY CONSTRUCTION 0.00% $0.00
WYLIE DRILLING & DRAINAGE, INC. 0.00% $0.00
Total: 0.47% $4,838.52

Bid Items & Bid Tabulations

48 Total 0 of 48
GILLESPIE  |  CR  |  AUSTIN  |  0914-19-033  |  08/03/2023  |  $847,359.42  |  BR 2B20(089)  |  BRIDGE REPL  |  110 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DELGADO'S CONTRACTORS, LLC
E-Z BEL CONSTRUCTION, LLC
A GREATER AUSTIN DEVELOPMENT COMPANY, LTD.
ACME BRIDGE COMPANY, INC.
3LW CIVIL LLC
ALLEN KELLER COMPANY
PREPARING ROW
STA 5.000 $2,246.000 $2,000.000 $4,000.000 $7,865.000 $2,800.000 $20,000.000 $16,500.000
REMOVING CONC (RIPRAP)
SY 70.000 $10.000 $30.000 $20.000 $25.000 $42.000 $33.800 $160.000
EXCAVATION (ROADWAY)
CY 310.000 $10.700 $50.000 $30.000 $88.900 $47.500 $28.000 $50.000
EXCAVATION (CHANNEL)
CY 50.000 $25.000 $50.000 $30.000 $119.000 $90.000 $20.000 $37.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 10.000 $15.120 $50.000 $50.000 $65.000 $118.000 $25.000 $60.000
BACKFILL (TY A)
STA 3.000 $180.000 $400.000 $1,000.000 $895.000 $200.000 $203.080 $1,400.000
FURNISHING AND PLACING TOPSOIL (4")
SY 850.000 $1.400 $5.000 $6.000 $6.450 $9.200 $3.500 $5.750
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 850.000 $0.250 $2.500 $0.670 $1.350 $0.710 $0.100 $0.700
VEGETATIVE WATERING
MG 45.000 $15.900 $60.000 $50.000 $110.000 $72.500 $0.100 $70.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 850.000 $1.500 $5.000 $3.000 $1.750 $3.200 $1.450 $2.750
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 135.000 $62.520 $175.000 $85.000 $192.600 $187.000 $175.000 $130.000
PRIME COAT (MULTI OPTION)
GAL 125.000 $3.960 $11.000 $10.000 $10.500 $4.250 $8.000 $14.000
CEM STABIL BKFL
CY 35.000 $150.000 $300.000 $350.000 $315.000 $247.000 $250.000 $300.000
DRILL SHAFT (24 IN)
LF 282.000 $242.000 $550.000 $290.000 $375.000 $300.000 $314.890 $300.000
CL C CONC (ABUT)
CY 16.000 $1,458.330 $1,800.000 $2,900.000 $1,500.000 $2,000.000 $1,530.000 $1,900.000
CL C CONC (BENT)
CY 16.000 $1,450.000 $1,850.000 $3,100.000 $2,000.000 $2,000.000 $1,530.000 $2,800.000
CL C CONC (COLUMN)
CY 5.000 $1,650.000 $1,800.000 $3,900.000 $3,000.000 $2,000.000 $1,530.000 $7,400.000
REINF CONC SLAB
SF 4,060.000 $25.000 $27.000 $22.000 $27.000 $28.500 $23.650 $38.000
APPROACH SLAB
CY 45.000 $623.660 $900.000 $1,100.000 $725.000 $900.000 $550.000 $1,600.000
PRESTR CONC SLAB BEAM (5SB15)
LF 805.000 $231.000 $235.000 $368.000 $254.500 $350.000 $277.130 $275.000
RIPRAP (CONC)(5 IN)
CY 25.000 $600.000 $650.000 $1,000.000 $1,000.000 $900.000 $525.000 $1,100.000
RIPRAP (MOW STRIP)(4 IN)
CY 12.000 $597.000 $650.000 $1,000.000 $1,000.000 $1,100.000 $550.000 $1,600.000
RAIL (TY T223)
LF 318.000 $160.000 $150.000 $290.000 $155.000 $150.000 $132.880 $275.000
ARMOR JOINT (SEALED)
LF 120.000 $68.480 $145.000 $110.000 $125.000 $191.000 $116.500 $220.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $45,000.000 $30,000.000 $28,500.000 $45,000.000 $40,000.000 $20,000.000 $34,500.000
REMOV STR (SMALL FENCE)
LF 650.000 $5.000 $4.000 $4.000 $2.000 $2.000 $2.000 $14.000
MOBILIZATION
LS 1.000 $83,717.340 $75,000.000 $46,890.000 $108,000.000 $86,000.000 $120,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,000.000 $2,500.000 $1,400.000 $4,000.000 $5,000.000 $26,575.000 $4,200.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 55.000 $34.000 $40.000 $28.000 $55.000 $48.800 $45.000 $48.000
ROCK FILTER DAMS (REMOVE)
LF 55.000 $12.000 $10.000 $8.000 $31.100 $16.200 $20.000 $16.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 250.000 $25.000 $33.000 $16.800 $52.000 $17.900 $48.000 $18.000
CONSTRUCTION EXITS (REMOVE)
SY 250.000 $12.620 $10.000 $8.000 $30.000 $5.800 $12.000 $5.750
TEMP SEDMT CONT FENCE (INSTALL)
LF 720.000 $4.370 $7.000 $3.000 $5.200 $4.250 $2.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 720.000 $1.110 $2.000 $1.000 $1.150 $1.050 $0.750 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $25.560 $30.000 $31.000 $28.350 $33.100 $27.000 $33.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,600.250 $1,300.000 $1,100.000 $1,103.000 $1,240.000 $1,850.000 $1,200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,250.000 $3,600.000 $3,700.000 $3,100.000 $4,010.000 $2,850.000 $4,000.000
WIRE FENCE (TY C)
LF 650.000 $20.000 $24.000 $35.000 $21.000 $6.400 $12.000 $21.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $709.950 $1,000.000 $250.000 $900.000 $826.000 $625.000 $500.000
REMOVE SM RD SN SUP&AM
EA 11.000 $135.000 $150.000 $150.000 $50.000 $133.000 $135.000 $110.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 1.000 $95.000 $100.000 $65.000 $75.000 $101.000 $250.000 $70.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 36.000 $40.000 $70.000 $27.000 $25.000 $69.300 $22.000 $29.000
REFL PAV MRKR TY II-A-A
EA 11.000 $4.100 $20.000 $7.000 $100.000 $355.000 $55.000 $400.000
D-GR HMA TY-D PG 76-22 SAC-B (EXEMPT)
TON 195.000 $129.300 $350.000 $250.000 $307.000 $309.000 $155.000 $200.000
INSTALL FTB
LF 95.000 $80.000 $125.000 $20.000 $32.000 $80.700 $0.100 $365.000
REMOVE FTB
LF 95.000 $15.000 $20.000 $2.000 $11.000 $20.800 $0.100 $26.000
LEAD CONTAINING COATING MANAGEMENT
SF 100.000 $25.000 $100.000 $118.500 $0.010 $10.000 $50.000 $130.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 120.000 $85.000 $75.000 $125.000 $125.000 $103.000 $50.000 $100.000
Totals: $847,359.420 $1,025,365.000 $1,073,858.500 $1,086,098.000 $1,089,921.550 $1,141,671.710 $1,297,601.500