Show Job Controls
Bid Cobra

GARZA US0084 (6335-20-001)

Items: 38

County: GARZA
Length: N/A
Highway: US0084
District: LUBBOCK
Control Number: 6335-20-001
DBE Goal: N/A
Project: BPM - 633520001
Guaranty: N/A
Time: 80 W
Engineer's Estimate: $1,328,083.00
Date: 04/02/2019 (7 years ago)
Contract Number: N/A
Type: BRIDGE PREVENTATIVE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,328,083.00
$1,523,850.00
Over/Under Est: 14.74% $195,767.00
Over/Under Est: 43.72% $580,583.73
Amt Left: 25.25% $384,816.73
Over/Under Est: 58.35% $774,986.00
Amt Left: 38.01% $579,219.00
Delta: -10.19% -$194,402.27
$2,523,200.50
Over/Under Est: 89.99% $1,195,117.50
Amt Left: 65.58% $999,350.50
Delta: -19.98% -$420,131.50

Bid Items & Bid Tabulations

38 Total 0 of 38
GARZA  |  US0084  |  LUBBOCK  |  6335-20-001  |  04/02/2019  |  $1,328,083.00  |  BPM - 633520001  |  BRIDGE PREVENT MAINT  |  80 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
EARTH BUILDERS, L.P.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
SCR CIVIL CONSTRUCTION, LLC
GILVIN-TERRILL, LTD.
REMOVING CONC (PAV)
SY 410.000 $5.600 $10.000 $34.630 $40.000 $60.000
REMOVING CONC (MISC)
SY 154.000 $50.000 $10.000 $22.970 $450.000 $120.000
CONC PVMT (CONT REINF - CRCP) (11")
SY 410.000 $57.000 $100.000 $137.120 $225.000 $600.000
FLOWABLE BACKFILL
CY 372.000 $128.000 $250.000 $145.670 $469.000 $245.000
CL B CONC (FLUME)
CY 105.000 $417.000 $750.000 $773.720 $1,590.000 $900.000
CL C CONC (MISC)
CY 9.000 $580.000 $1,000.000 $2,157.270 $1,100.000 $4,000.000
CL C CONC (RAC-R)(HPC)
CY 42.000 $1,200.000 $1,250.000 $935.080 $2,300.000 $2,000.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 388.000 $150.000 $200.000 $83.740 $150.000 $210.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 2,550.000 $125.000 $100.000 $119.880 $120.000 $200.000
CONC STR REPAIR (STANDARD)
SF 114.000 $100.000 $100.000 $121.380 $145.000 $170.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 212.000 $600.000 $700.000 $660.370 $750.000 $1,250.000
RIPRAP (MOW STRIP)(4 IN)
CY 64.000 $428.000 $600.000 $605.980 $1,400.000 $790.000
CLEANING AND SEALING EXISTING JOINTS
LF 168.000 $12.000 $100.000 $126.860 $60.000 $90.000
CLEANING EXISTING JOINTS
LF 560.000 $11.000 $80.000 $175.640 $20.000 $40.000
RETROFIT RAIL (TY T631)
LF 203.000 $150.000 $200.000 $281.400 $200.000 $85.000
HEADER TYPE EXPANSION JOINT
LF 307.000 $94.000 $100.000 $586.120 $85.000 $400.000
REMOVE STR (RAIL)
LF 203.000 $20.000 $20.000 $25.880 $50.000 $200.000
MOBILIZATION
LS 1.000 $80,000.000 $150,000.000 $218,370.370 $158,000.000 $215,000.000
BARR, SIGNS, TRAFFIC HANDLING ADD ALT1X
MO 4.000 $7,500.000 $5,000.000 $7,445.920 $21,000.000 $10,000.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 360.000 $125.000 $100.000 $38.250 $60.000 $105.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 360.000 $20.000 $20.000 $12.130 $25.000 $20.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 360.000 $20.000 $20.000 $20.340 $40.000 $20.000
MTL W-BEAM GD FEN (STEEL POST)
LF 4,675.000 $40.000 $30.000 $31.380 $32.000 $28.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,000.000 $1,000.000 $1,448.490 $1,455.000 $1,300.000
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 16.000 $2,500.000 $2,000.000 $2,704.250 $2,850.000 $2,450.000
REMOVE METAL BEAM GUARD FENCE
LF 4,270.000 $5.000 $5.000 $3.330 $4.000 $3.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 30.000 $50.000 $100.000 $334.930 $335.000 $300.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 24.000 $2,000.000 $2,400.000 $3,306.160 $3,400.000 $3,000.000
CRASH CUSH ATTEN (INSTL)
EA 4.000 $5,000.000 $5,000.000 $11,036.990 $10,500.000 $10,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,000.000 $2,000.000 $2,511.990 $1,500.000 $2,250.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $2,000.000 $1,500.000 $1,411.990 $2,000.000 $1,250.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 28.000 $50.000 $50.000 $159.280 $160.000 $140.000
INSTL OM ASSM (OM-3L)(FLX)GND
EA 72.000 $50.000 $150.000 $469.550 $475.000 $429.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 24.000 $50.000 $35.000 $50.160 $45.000 $40.000
PAVEMENT SEALER 4"
LF 1,880.000 $0.500 $5.000 $4.480 $4.500 $4.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 940.000 $4.000 $12.000 $11.160 $11.200 $10.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 940.000 $4.000 $12.000 $11.160 $11.200 $10.000
TMA (STATIONARY)
DAY 73.000 $100.000 $200.000 $552.030 $300.000 $1,150.000
Totals: $1,328,083.000 $1,523,850.000 $1,908,666.730 $2,103,069.000 $2,523,200.500