Show Job Controls
Bid Cobra

GALVESTON SH0146 (6472-86-001)

Items: 39

County: GALVESTON
Length: 0.0100 MILES
Highway: SH0146
District: HOUSTON
Control Number: 6472-86-001
DBE Goal: N/A
Project: RMC - A00212070
Guaranty: $11,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $536,620.36
Date: 05/13/2025 (1 year ago) Changed
Contract Number: 5251201
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00212070
Project Description: GUARDRAIL REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
7600 WASHINGTON AVE, HOUSTON, TX 77007
DAVID LAZARO
JOEL CLARKE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$536,620.36
$421,850.00
Over/Under Est: -21.39% -$114,770.36
Over/Under Est: -13.04% -$69,970.36
Amt Left: 10.62% $44,800.00
Over/Under Est: 8.63% $46,299.64
Amt Left: 38.18% $161,070.00
Delta: -24.92% -$116,270.00
Over/Under Est: 15.83% $84,969.39
Amt Left: 47.35% $199,739.75
Delta: -6.63% -$38,669.75
$676,602.00
Over/Under Est: 26.09% $139,981.64
Amt Left: 60.39% $254,752.00
Delta: -8.85% -$55,012.25

Bid Items & Bid Tabulations

39 Total 0 of 39
GALVESTON  |  SH0146  |  HOUSTON  |  6472-86-001  |  05/13/2025  |  $536,620.36  |  RMC - A00212070  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
ROSS SA ENTERPRISE LLC
ISI CONTRACTING, INC.
ELITE KINGS CONSTRUCTION, LLC
RHINO EQUITY, LLC
REMOV CONC (MOWSTRIP)
LF 100.000 $25.080 $150.000 $10.000 $8.000 $30.250 $10.000
CONC STR REPAIR (STANDARD)
SF 250.000 $100.000 $80.000 $40.000 $52.000 $136.950 $80.000
RIPRAP (CONC)(4 IN)
CY 100.000 $200.000 $500.000 $100.000 $295.000 $467.500 $425.000
MOBILIZATION (CALLOUT)
EA 15.000 $1,143.480 $10.000 $2,500.000 $500.000 $825.000 $200.000
MOBILIZATION (EMERGENCY)
EA 5.000 $1,676.470 $1,500.000 $1,000.000 $1,000.000 $2,200.000 $3,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 7.000 $125.000 $200.000 $250.000 $175.000 $192.500 $1.000
TMA (STATIONARY)
DAY 120.000 $250.390 $10.000 $1.000 $100.000 $192.500 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $21.770 $25.000 $28.000 $30.000 $41.250 $22.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 15.000 $1,694.390 $750.000 $500.000 $1,700.000 $1,375.000 $1,800.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 10.000 $718.750 $100.000 $500.000 $1,125.000 $1,650.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 25.000 $1,465.300 $500.000 $100.000 $1,750.000 $1,265.000 $1,400.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 200.000 $32.500 $10.000 $30.000 $150.000 $52.250 $30.000
CONNECTOR PLATE FOR THRIE BEAM
EA 6.000 $500.000 $600.000 $300.000 $600.000 $385.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $2.030 $25.000 $10.000 $8.500 $6.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $107.140 $2,000.000 $200.000 $450.000 $150.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,721.530 $250.000 $2,500.000 $3,350.000 $2,500.000 $4,500.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 5.000 $514.160 $250.000 $500.000 $750.000 $300.000 $250.000
CHAIN LINK FENCE (REPAIR) (6')
LF 50.000 $23.670 $50.000 $25.000 $50.000 $27.500 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF1
EA 50.000 $328.000 $5.000 $10.000 $10.000 $35.750 $3.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 50.000 $410.000 $75.000 $10.000 $25.000 $35.750 $20.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 2,500.000 $20.000 $40.000 $30.000 $21.000 $19.250 $30.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 18.000 $45.000 $100.000 $50.000 $35.000 $33.000 $1,800.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 24.500 $45.000 $200.000 $50.000 $850.000 $275.000 $50.000
REPLACE TIMBER POST W/O CONC FND
EA 150.000 $48.100 $25.000 $1.000 $75.000 $110.000 $50.000
REPLACE STEEL POST W/O CONC FND
EA 250.000 $35.000 $5.000 $1.000 $105.000 $60.500 $80.000
REPLACE TIMBER POST W/ CONC FND
EA 250.000 $47.800 $25.000 $50.000 $110.000 $154.000 $100.000
REPLACE STEEL POST W/ CONC FND
EA 100.000 $50.000 $10.000 $50.000 $150.000 $88.000 $50.000
REALIGN POSTS
EA 150.000 $15.000 $50.000 $50.000 $15.000 $33.000 $10.000
REM OBSOLETE GET & REPL W/ SGT
EA 25.000 $2,747.710 $10.000 $1,500.000 $2,900.000 $3,575.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $900.000 $150.000 $1,000.000 $1,150.000 $1,045.000 $1,300.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,600.000 $40.000 $50.000 $60.000 $25.000 $30.250 $60.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 250.000 $32.500 $10.000 $100.000 $55.000 $53.900 $80.000
REPLACE BLOCKOUT
EA 60.000 $79.440 $300.000 $600.000 $50.000 $27.500 $200.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $283.100 $600.000 $100.000 $512.000 $192.500 $100.000
RESET SGT IMPACT HEAD
EA 40.000 $100.000 $20.000 $1.000 $110.000 $319.000 $150.000
REPLACE SGT OBJECT MARKER
EA 20.000 $38.110 $300.000 $1.000 $50.000 $82.500 $25.000
REPLACE SGT CABLE ASSEMBLY
EA 30.000 $12.500 $300.000 $1.000 $185.000 $103.400 $100.000
REPLACE SGT STRUT
EA 15.000 $52.200 $100.000 $1.000 $123.000 $101.750 $100.000
RAISE RAIL
LF 250.000 $16.710 $30.000 $8.000 $13.000 $27.500 $10.000
Totals: $536,620.360 $421,850.000 $466,650.000 $582,920.000 $621,589.750 $676,602.000