Show Job Controls
Bid Cobra

GALVESTON SH0146 (6392-97-001)

Items: 28

County: GALVESTON
Length: N/A
Highway: SH0146
District: HOUSTON
Control Number: 6392-97-001
DBE Goal: N/A
Project: RMC - 639297001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $421,874.49
Date: 02/03/2022 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$421,874.49
$415,170.00
Over/Under Est: -1.59% -$6,704.49
$420,309.00
Over/Under Est: -0.37% -$1,565.49
Amt Left: 1.24% $5,139.00
Over/Under Est: 11.19% $47,228.11
Amt Left: 12.99% $53,932.60
Delta: -11.61% -$48,793.60
Over/Under Est: 23.2% $97,892.51
Amt Left: 25.19% $104,597.00
Delta: -10.80% -$50,664.40
Over/Under Est: 30.54% $128,859.51
Amt Left: 32.65% $135,564.00
Delta: -5.96% -$30,967.00

Bid Items & Bid Tabulations

28 Total 0 of 28
GALVESTON  |  SH0146  |  HOUSTON  |  6392-97-001  |  02/03/2022  |  $421,874.49  |  RMC - 639297001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
S6 INTERSTATE SERVICES
RHINO EQUITY, LLC
VACA UNDERGROUND UTILITIES INC
ROY JORGENSEN ASSOCIATES, INC.
ISI CONTRACTING, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 150.000 $552.410 $405.000 $500.000 $450.000 $425.000 $700.000
MOBILIZATION (CALLOUT)
EA 15.000 $708.730 $100.000 $1.000 $1,000.000 $750.000 $500.000
MOBILIZATION (EMERGENCY)
EA 5.000 $461.600 $200.000 $200.000 $750.000 $1,000.000 $1,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,000.000 $20.250 $18.000 $20.000 $25.000 $20.000 $22.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,107.110 $1,300.000 $2,200.000 $1,500.000 $1,750.000 $2,400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 25.000 $1,118.560 $900.000 $1,200.000 $1,250.000 $1,600.000 $1,500.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 200.000 $42.880 $34.000 $65.000 $25.000 $65.000 $65.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $2.330 $4.000 $1.000 $8.500 $3.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $139.960 $160.000 $1.000 $600.000 $1.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,758.520 $2,900.000 $2,500.000 $3,200.000 $3,250.000 $3,650.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 10.000 $514.160 $200.000 $250.000 $350.000 $250.000 $500.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 50.000 $44.840 $16.000 $16.000 $9.000 $6.000 $16.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 50.000 $22.190 $6.000 $16.000 $16.000 $20.000 $16.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $16.420 $22.000 $22.500 $26.000 $20.000 $21.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 12.600 $24.210 $25.000 $10.000 $26.000 $40.000 $60.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 500.000 $15.890 $25.000 $18.000 $26.000 $30.000 $45.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 250.000 $48.810 $39.000 $38.000 $88.000 $50.000 $40.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 100.000 $47.480 $50.000 $42.000 $88.000 $60.000 $45.000
REALIGN POSTS
EA 80.000 $14.990 $20.000 $8.000 $75.000 $7.000 $5.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,000.000 $19.830 $30.000 $26.000 $32.000 $32.000 $26.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 150.000 $64.970 $68.000 $39.000 $50.000 $65.000 $50.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 45.000 $2,747.710 $2,600.000 $3,000.000 $2,800.000 $3,400.000 $3,550.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $914.020 $1,000.000 $900.000 $1,000.000 $1,250.000 $1,300.000
REM & RESET SGT IMPACT HEAD
EA 25.000 $94.610 $125.000 $100.000 $60.000 $150.000 $50.000
REPLACE SGT CABLE ASSEMBLY
EA 15.000 $78.600 $50.000 $75.000 $88.000 $80.000 $125.000
REPLACE SGT STRUT
EA 10.000 $52.200 $100.000 $75.000 $80.000 $75.000 $115.000
REPAIR (TRACC)
LF 10.000 $91.960 $950.000 $75.000 $43.000 $400.000 $100.000
TMA (STATIONARY)
DAY 100.000 $104.820 $205.000 $1.000 $50.000 $400.000 $225.000
Totals: $421,874.486 $415,170.000 $420,309.000 $469,102.600 $519,767.000 $550,734.000