Show Job Controls
Bid Cobra

GALVESTON SH0146 (6319-75-001)

Items: 43

County: GALVESTON
Length: N/A
Highway: SH0146
District: HOUSTON
Control Number: 6319-75-001
DBE Goal: N/A
Project: RMC - 631975001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $326,637.00
Date: 10/03/2017 (8 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$326,637.00
$322,162.00
Over/Under Est: -1.37% -$4,475.00
Over/Under Est: 7.15% $23,354.00
Amt Left: 8.64% $27,829.00

Bid Items & Bid Tabulations

43 Total 0 of 43
GALVESTON  |  SH0146  |  HOUSTON  |  6319-75-001  |  10/03/2017  |  $326,637.00  |  RMC - 631975001  |  GUARDRAIL REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
ROY JORGENSEN ASSOCIATES, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 43.000 $500.000 $475.000 $500.000
MOBILIZATION (CALLOUT)
EA 24.000 $300.000 $275.000 $425.000
MOBILIZATION (EMERGENCY)
EA 5.000 $750.000 $500.000 $500.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,000.000 $22.000 $22.000 $23.000
TERMINAL ANCHOR SECTION
EA 5.000 $50.000 $50.000 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $2,000.000 $2,000.000 $1,700.000
REMOVE METAL BEAM GUARD FENCE
LF 1,000.000 $1.000 $1.000 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $1.000 $1.000 $100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,900.000 $2,900.000 $3,500.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 3.000 $600.000 $500.000 $550.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $200.000 $175.000 $500.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $14.000 $14.000 $15.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 5.000 $15.000 $15.000 $30.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 12.600 $15.000 $15.000 $35.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 500.000 $18.000 $18.000 $18.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 150.000 $41.000 $38.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 100.000 $44.000 $45.000 $45.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $70.000 $70.000 $90.000
REALIGN POSTS
EA 275.000 $10.000 $10.000 $10.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,000.000 $18.000 $17.500 $25.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 150.000 $35.000 $35.000 $50.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 2.000 $5.000 $5.000 $50.000
REPLACE TERMINAL ANCHOR POSTS
EA 2.000 $5.000 $5.000 $50.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 45.000 $2,900.000 $2,900.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,000.000 $1,000.000 $850.000
REM & RESET SGT IMPACT HEAD
EA 25.000 $120.000 $120.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $90.000 $90.000 $85.000
REPLACE SGT STRUT
EA 10.000 $75.000 $75.000 $70.000
REPAIR (TRACC)
LF 25.000 $75.000 $75.000 $70.000
REPAIR REACT (N) (MISC HARDWARE)
EA 1.000 $1,000.000 $1,000.000 $900.000
REPAIR REACT (N) (REAR SEC "S")
EA 1.000 $100.000 $100.000 $150.000
REPAIR REACT (N) (REAR SEC "B")
EA 1.000 $100.000 $100.000 $200.000
REPAIR REACT (N) (FRONT SECTION)
EA 1.000 $1,000.000 $1,000.000 $500.000
REPAIR REACT (N) (CYLINDERS)
EA 2.000 $2,800.000 $2,800.000 $3,000.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 50.000 $5.000 $5.000 $10.000
REP (CONC PARAPETW/STL POST/RAIL-T4(S))
LF 10.000 $5.000 $5.000 $10.000
REP (CONC PARAPETW/ALUMPOST/RAIL-T4(A))
LF 10.000 $5.000 $5.000 $10.000
REPAIR (T203 W/ STEEL PIPE RAIL - C203)
LF 10.000 $5.000 $5.000 $10.000
REP METAL POST W/ BASE PLATE(T4(S)RAIL)
EA 5.000 $5.000 $5.000 $10.000
REP METAL POST W/ BASE PLATE(T4(A)RAIL
EA 5.000 $5.000 $5.000 $10.000
REP METAL POST W/ BASE PLATE(C203 RAIL)
EA 5.000 $5.000 $5.000 $10.000
REPAIR (ALUMINUM RAIL)
LF 50.000 $25.000 $18.000 $18.000
REPAIR TY (T4 (S) RAIL)
LF 50.000 $5.000 $5.000 $15.000
Totals: $326,637.000 $322,162.000 $349,991.000