GALVESTON SH 275 (3595-01-022)

Items: 109

County: GALVESTON
Length: 5.1360 MILES
Highway: SH 275
District: HOUSTON
Control Number: 3595-01-022
DBE Goal: 6.0%
Project: STP 2025(829)MM
Guaranty: $100,000.00
Time: 180 WORKING DAYS
Engineer's Estimate: $12,707,852.20
Date: 06/04/2025 (1 year ago)
Contract Number: 6253012
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00130760
Contract Type: Federal
Project Description: BASE REPAIR, MILLING, 1.5 INCH LEVEL-UP, 1.5 INCH TYPE D SAC-A 76-22 SURF, STRIPING, INLET REPAIRS, FULL DEPTH REPAIR, CONCRETE REPAIR & DIAMOND GRINDING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DAVID LAZARO
JOEL CLARKE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$12,707,852.20
$9,764,258.62
Over/Under Est: -23.16% -$2,943,593.58
$10,770,222.48
Over/Under Est: -15.25% -$1,937,629.72
Amt Left: 10.3% $1,005,963.86
$11,793,455.42
Over/Under Est: -7.2% -$914,396.78
Amt Left: 20.78% $2,029,196.80
Delta: -9.50% -$1,023,232.94
Over/Under Est: -3.59% -$456,047.65
Amt Left: 25.48% $2,487,545.93
Delta: -3.89% -$458,349.13
$12,330,788.50
Over/Under Est: -2.97% -$377,063.70
Amt Left: 26.28% $2,566,529.88
Delta: -0.64% -$78,983.95
Subcontractor Percentage Amount
TRAFFIC SIGNS & LINES, LLC 8.33% $813,362.74
A-CORE CONCRETE CUTTING OF TEXAS, INC. 6.09% $594,643.35
TEXAS BRO'S SAWING AND SEALING LLC 1.79% $174,780.23
SCOTT DERR PAINTING CO, LLC 1.55% $151,346.01
PERFORMANCE EQUIPMENT SERVICE 1.23% $120,100.38
EAST TEXAS R & D SERVICES, INC. 1.16% $113,265.40
DORAN STEEL, INC. 0.94% $91,784.03
CHERRY MOVING COMPANY, INC. 0.37% $36,127.76
CURB PLANET INC. 0.04% $3,905.70
Total: 21.50% $2,099,315.60

Bid Items & Bid Tabulations

109 Total 0 of 109
GALVESTON  |  SH 275  |  HOUSTON  |  3595-01-022  |  06/04/2025  |  $12,707,852.20  |  STP 2025(829)MM  |  SURF/ROADWAY RESTOR  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
POSILLICO CIVIL, INC.
ISI CONTRACTING, INC.
MC2 CIVIL, LLC
RAGLE CONSTRUCTION, INC.
MBN ENTERPRISES LLC
REMOV CONC (RIPRAP)
SY 2,157.000 $44.990 $6.000 $20.000 $15.000 $14.000 $10.000
REMOV CONC (DRIVEWAYS)
SY 281.000 $29.490 $8.000 $28.000 $20.000 $18.000 $25.000
REMOV CONC (CURB & GUTTER)
LF 1,557.000 $27.650 $2.350 $6.000 $10.000 $7.000 $9.000
RMV (7"-11") TRT/UNTRT BASE & ASPH PAV
SY 6,154.000 $21.080 $5.000 $3.900 $15.000 $6.500 $12.500
EXCAV (ROADWAY)
CY 1,000.000 $50.650 $25.000 $45.000 $40.000 $250.000 $20.000
EMBANK (FNL)(OC)(TY A)
CY 500.000 $250.090 $25.000 $75.000 $40.000 $40.000 $30.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 131.000 $403.080 $360.000 $271.000 $320.000 $318.000 $350.000
LIME TRT (EXIST MATL)(8")
SY 7,273.000 $17.800 $5.000 $3.000 $10.000 $6.250 $5.500
ASPHALT TRT BASE (GR 2)(PG 64)
TON 1,601.000 $165.000 $128.000 $200.000 $170.000 $160.000 $160.000
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 8,510.000 $200.000 $148.000 $138.000 $146.000 $180.000 $170.000
D-GR HMA TY-D SAC-A PG76-22
TON 6,907.000 $175.290 $195.000 $169.000 $165.000 $200.000 $185.000
TACK COAT
GAL 5,025.000 $5.090 $5.000 $4.900 $4.250 $4.750 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(21")
SY 1,020.000 $97.000 $190.000 $193.000 $240.000 $155.000 $150.000
PLANE ASPH CONC PAV(3")
SY 83,723.000 $7.520 $1.800 $1.600 $4.750 $2.700 $5.000
CONC PVMT(TRANSITION SLAB) (10")
SY 409.000 $282.430 $200.000 $179.000 $160.000 $120.000 $150.000
CONC PVMT (CRCP)(HES) (10")
SY 6,856.000 $188.382 $125.000 $135.000 $120.000 $110.000 $130.000
FULL-DEPTH REPAIR CRCP (16")
SY 9,523.000 $230.000 $200.000 $245.000 $270.000 $195.000 $350.000
CEM STABIL BKFL
CY 109.000 $248.870 $70.000 $350.000 $70.000 $143.000 $100.000
CL C CONC (COLLAR)
EA 15.000 $1,085.760 $944.440 $4,005.000 $1,600.000 $2,250.000 $1,200.000
RIPRAP (CONC)(4 IN)
CY 242.000 $420.000 $560.000 $464.000 $750.000 $560.000 $700.000
CLEAN & PAINT EXIST STR (SYSTEM III-A)
LS 1.000 $105,800.000 $160,000.000 $250,000.000 $1,500,000.000 $1,597,000.000 $200,000.000
RC PIPE (CL V)(18 IN)
LF 60.000 $259.130 $300.000 $220.000 $400.000 $360.000 $100.000
INLET (COMPL)(CURB)(TY C1)(NONE)(HOU)
EA 8.000 $8,790.230 $8,500.000 $7,196.000 $10,000.000 $8,000.000 $8,000.000
INLET (COMPL)(CURB)(TY C1)(LEFT)(HOU)
EA 3.000 $10,230.230 $8,500.000 $7,299.000 $10,000.000 $8,250.000 $8,000.000
INLET (COMPL)(CURB)(TY C1)(RIGHT)(HOU)
EA 2.000 $9,325.300 $8,500.000 $7,322.000 $10,000.000 $8,250.000 $8,000.000
INLET (COMPL)(CURB)(TY C1)(BOTH)(HOU)
EA 2.000 $8,695.600 $9,500.000 $7,619.000 $10,000.000 $8,750.000 $8,000.000
ADJUSTING MANHOLES
EA 79.000 $1,808.190 $550.000 $1,500.000 $400.000 $1,175.000 $1,400.000
REMOV STR (INLET)
EA 15.000 $1,913.330 $300.000 $2,500.000 $750.000 $620.000 $800.000
REMOV STR (PIPE)
LF 60.000 $33.180 $100.000 $150.000 $100.000 $18.000 $50.000
MOBILIZATION
LS 1.000 $1,304,434.570 $850,000.000 $1,000,000.000 $1,100,000.000 $1,200,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $12,049.220 $16,000.000 $30,000.000 $20,000.000 $36,500.000 $13,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 240.000 $195.280 $75.000 $211.000 $75.000 $100.000 $150.000
TMA (STATIONARY)
DAY 240.000 $506.130 $450.000 $1,000.000 $250.000 $400.000 $230.000
TMA (MOBILE OPERATION)
DAY 15.000 $42.780 $700.000 $694.000 $600.000 $600.000 $300.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,360.000 $3.750 $7.000 $8.500 $8.000 $8.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,360.000 $0.410 $2.000 $2.800 $2.000 $1.000 $1.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 60.000 $60.000 $129.770 $85.000 $75.000 $150.000 $100.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $77.710 $119.000 $94.000 $75.000 $150.000 $100.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 840.000 $22.870 $7.930 $1.800 $25.000 $15.000 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 560.000 $34.070 $11.900 $1.800 $25.000 $20.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 60.000 $25.630 $42.050 $15.000 $25.000 $20.000 $50.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $27.250 $47.380 $6.900 $25.000 $25.000 $50.000
CONC CURB (TY II)
LF 4,307.000 $63.480 $7.890 $12.400 $20.000 $9.000 $10.000
INTERSECTIONS (ACP)
SY 173.000 $35.000 $150.000 $185.000 $79.000 $125.000 $100.000
DRIVEWAYS (CONC) (HES)
SY 495.000 $395.000 $120.000 $292.000 $120.000 $125.000 $110.000
DRIVEWAYS (ACP)
SY 131.000 $86.300 $128.000 $223.000 $97.000 $125.000 $100.000
ALUMINUM SIGNS (TY A)
SF 1,001.000 $44.450 $22.100 $28.000 $25.000 $24.250 $26.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 93.000 $746.790 $823.660 $1,066.000 $1,050.000 $1,010.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 14.000 $1,200.000 $935.460 $1,287.000 $1,150.000 $1,130.000 $1,300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $878.960 $918.630 $1,179.000 $1,200.000 $1,175.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $868.760 $976.500 $1,287.000 $1,350.000 $1,335.000 $1,800.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $1,650.000 $1,255.350 $1,644.000 $1,550.000 $1,500.000 $1,800.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,705.000 $1,338.480 $1,839.000 $1,800.000 $1,750.000 $5,000.000
REMOVE SM RD SN SUP&AM
EA 123.000 $139.570 $78.920 $130.000 $100.000 $95.000 $120.000
IN SRSS & AM (RAIL)(130 MPH)(P MOUNT)
EA 2.000 $4,450.000 $6,393.560 $7,243.000 $3,700.000 $3,675.000 $5,000.000
IN SRSS & AM (RAIL)(130 MPH)(T MOUNT)
EA 1.000 $4,600.000 $6,692.400 $7,676.000 $4,000.000 $3,975.000 $5,000.000
IN SRSS & AM (RAIL)(130 MPH)(U MOUNT)
EA 1.000 $520.000 $6,750.270 $7,827.000 $4,050.000 $4,015.000 $6,000.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 761.000 $6.360 $3.550 $5.700 $5.250 $6.000 $7.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 2,207.000 $5.130 $3.550 $5.700 $5.250 $6.000 $7.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 24,460.000 $1.360 $1.420 $0.400 $0.350 $1.150 $1.300
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 21,156.000 $1.530 $0.760 $0.400 $0.350 $1.050 $1.250
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 12,762.000 $1.430 $1.420 $0.700 $0.600 $1.850 $2.200
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 4,992.000 $19.680 $6.090 $4.300 $4.000 $9.000 $11.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 114.000 $210.000 $157.340 $92.000 $85.000 $190.000 $210.000
WK ZN PAV MRK REMOV (W)(RR XING)
EA 24.000 $466.700 $456.790 $216.000 $200.000 $550.000 $600.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 48.000 $377.500 $187.790 $92.000 $85.000 $250.000 $300.000
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 16,440.000 $1.350 $1.420 $0.400 $0.350 $1.150 $1.300
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 124,644.000 $1.630 $0.760 $0.400 $0.350 $1.050 $1.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,188.000 $1.570 $1.370 $1.200 $1.100 $1.500 $1.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 425.000 $4.000 $7.970 $6.500 $6.000 $8.500 $11.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 8.000 $219.860 $157.340 $151.000 $140.000 $165.000 $220.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $255.400 $167.490 $184.000 $170.000 $220.000 $260.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 5,520.000 $3.950 $1.270 $1.000 $0.900 $0.980 $1.200
RE PM TY I(W)(RR XING)(100MIL)(CALLOUT)
EA 12.000 $7.000 $761.310 $676.000 $625.000 $700.000 $900.000
RE PM TY III (W)(6")(SLD)
LF 6,753.000 $3.750 $1.220 $0.900 $0.800 $0.980 $1.200
RE PM TY III (W)(6")(BRK)
LF 6,710.000 $0.760 $1.370 $0.900 $0.800 $1.020 $1.200
RE PM TY III (W)(8")(SLD)
LF 3,193.000 $2.490 $1.370 $1.300 $1.200 $1.600 $2.000
RE PM TY III (W)(24")(SLD)
LF 2,071.000 $11.370 $11.170 $8.700 $8.000 $9.000 $11.000
RE PM TY III (Y)(6")(SLD)
LF 31,574.000 $1.570 $1.220 $0.900 $0.800 $1.000 $1.200
RE PM TY III (Y)(6")(BRK)
LF 3,180.000 $2.120 $1.370 $0.900 $0.800 $1.020 $1.200
RE PM TY III (W)(ARROW)
EA 49.000 $313.000 $203.020 $330.000 $305.000 $195.000 $225.000
RE PM TY III (W)(WORD)
EA 22.000 $319.780 $203.020 $463.000 $430.000 $230.000 $265.000
RE PM TY III (BLK)(6")(SHADOW)
LF 6,740.000 $1.550 $1.420 $0.900 $0.800 $0.990 $1.200
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 5,520.000 $1.600 $1.220 $0.900 $0.800 $1.050 $1.250
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 3,825.000 $1.530 $1.320 $0.900 $0.800 $1.000 $1.200
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 5,040.000 $0.980 $1.220 $0.900 $0.800 $1.050 $1.250
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 30,748.000 $1.470 $0.420 $0.870 $0.800 $1.020 $1.200
PAVEMENT SLER 6"
LF 54,957.000 $0.770 $0.420 $0.100 $0.100 $0.250 $0.400
PAVEMENT SLER 8"
LF 3,193.000 $1.310 $0.760 $0.200 $0.200 $0.400 $0.500
PAVEMENT SLER 24"
LF 2,071.000 $4.100 $3.050 $1.100 $1.000 $1.200 $1.500
PAVEMENT SLER (ARROW)
EA 49.000 $49.210 $25.380 $13.000 $12.000 $50.000 $70.000
PAVEMENT SLER (WORD)
EA 22.000 $55.920 $25.380 $13.000 $12.000 $60.000 $80.000
REFL PAV MRKR TY I-C
EA 761.000 $6.700 $5.330 $6.500 $6.000 $6.500 $9.000
REFL PAV MRKR TY II-A-A
EA 2,207.000 $3.034 $5.330 $6.500 $6.000 $6.500 $9.000
ELIM EXT PM & MRKS (6")
LF 54,957.000 $1.570 $0.560 $0.400 $0.400 $0.400 $0.500
ELIM EXT PM & MRKS (8")
LF 3,193.000 $1.570 $1.020 $1.100 $1.000 $0.650 $0.900
ELIM EXT PM & MRKS (24")
LF 2,071.000 $5.040 $3.550 $2.200 $2.000 $2.000 $3.000
ELIM EXT PM & MRKS (ARROW)
EA 49.000 $98.310 $55.830 $81.000 $75.000 $65.000 $100.000
ELIM EXT PM & MRKS (WORD)
EA 22.000 $98.460 $55.830 $92.000 $85.000 $80.000 $100.000
ELIM EXT PM & MRKS (RR XING)
EA 12.000 $212.560 $55.830 $270.000 $250.000 $150.000 $180.000
PAV SURF PREP FOR MRK (6")
LF 54,957.000 $0.080 $0.080 $0.020 $0.010 $0.050 $0.100
PAV SURF PREP FOR MRK (8")
LF 3,193.000 $0.520 $0.160 $0.060 $0.050 $0.100 $0.200
PAV SURF PREP FOR MRK (24")
LF 2,071.000 $3.140 $0.320 $0.540 $0.500 $0.500 $0.600
PAV SURF PREP FOR MRK (ARROW)
EA 49.000 $13.460 $7.110 $10.800 $10.000 $15.000 $25.000
PAV SURF PREP FOR MRK (WORD)
EA 22.000 $15.120 $7.110 $10.800 $10.000 $23.000 $30.000
PAV SURF PREP FOR MRK (RPM)
EA 2,968.000 $4.260 $0.080 $0.270 $0.250 $0.500 $0.700
BRIDGE JOINT REPAIR (ARMOR)
LF 156.000 $85.000 $240.000 $600.000 $150.000 $400.000 $140.000
MEMBRANE UNDERSEAL
GAL 18,421.000 $10.000 $5.500 $5.000 $4.500 $4.500 $13.000
CONTINUOUS GRINDING-CONCRETE PAVEMENT
SY 64,669.000 $7.680 $13.000 $11.000 $7.000 $10.250 $13.300
Totals: $12,707,852.200 $9,764,258.620 $10,770,222.480 $11,793,455.420 $12,251,804.550 $12,330,788.500
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
Total: $70,000.00