Show Job Controls
Bid Cobra

GALVESTON FM 270 (3312-02-014)

Items: 155

County: GALVESTON
Length: N/A
Highway: FM 270
District: HOUSTON
Control Number: 3312-02-014
DBE Goal: N/A
Project: C 3312-2-14
Guaranty: N/A
Time: 122 WORKING DAYS
Engineer's Estimate: $1,840,443.90
Date: 01/05/2017 (9 years ago)
Contract Number: N/A
Type: REALIGN ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$1,840,443.90
$2,299,180.80
Over/Under Est: 24.93% $458,736.90
Over/Under Est: 31.23% $574,693.40
Amt Left: 5.04% $115,956.50

Bid Items & Bid Tabulations

155 Total 0 of 155
GALVESTON  |  FM 270  |  HOUSTON  |  3312-02-014  |  01/05/2017  |  $1,840,443.90  |  C 3312-2-14  |  REALIGN ROADWAY  |  122 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MAIN LANE INDUSTRIES LTD.
ARANDA BROTHERS CONSTRUCTION CO., INC.
PREPARING ROW
STA 8.000 $1,500.000 $10,000.000 $2,500.000
REMOVING CONC (MEDIANS)
SY 409.000 $75.200 $3.000 $10.000
REMOVING CONC (DRIVEWAYS)
SY 397.000 $4.500 $3.000 $10.000
REMOVING CONC (CURB AND GUTTER)
LF 1,095.000 $3.000 $2.000 $3.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 218.000 $8.000 $2.000 $10.000
REMOVING CONCRETE(MOW STRIP)
LF 198.000 $10.000 $2.000 $10.000
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 4,198.000 $4.200 $5.000 $5.000
EXCAVATION (ROADWAY)
CY 3,068.000 $8.200 $15.000 $8.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 250.000 $20.000 $20.000 $12.000
EROSION CONTROL COMPOST
CY 12.000 $31.000 $75.000 $4.000
GENERAL USE COMPOST
CY 6.000 $37.100 $50.000 $10.000
BLOCK SODDING
SY 4,096.000 $2.700 $4.000 $5.000
FERTILIZER
AC 0.800 $750.000 $1,000.000 $1,250.000
VEGETATIVE WATERING
MG 171.550 $18.000 $10.000 $35.000
PLANT MATERIAL (30 GAL) (TREE)
EA 28.000 $170.000 $500.000 $350.000
PLANT BED PREP (TYPE II)
SY 112.000 $3.000 $20.000 $3.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 100.000 $110.000 $100.000 $75.000
LIME TRT (EXST MATL) (6")
SY 5,337.000 $3.600 $6.000 $4.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 72.000 $158.000 $150.000 $180.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 5,337.000 $6.500 $15.000 $20.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 294.000 $65.000 $120.000 $120.000
D-GR HMA(SQ) TY-C SAC-B PG70-22
TON 1,104.000 $130.000 $90.000 $150.000
PLANE ASPH CONC PAV (2")
SY 10,032.000 $4.400 $2.000 $4.750
CONC PVMT (CONT REINF - CRCP) (10")
SY 4,879.000 $45.000 $50.000 $53.000
CEM STABIL BKFL
CY 207.000 $80.000 $45.000 $70.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 86.000 $256.000 $220.000 $380.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 88.000 $365.000 $400.000 $500.000
RIPRAP (CONC)(5 IN)
CY 1.000 $450.000 $900.000 $400.000
RIPRAP (MOW STRIP)(4 IN)
CY 15.300 $660.000 $700.000 $390.000
RC PIPE (CL III)(18 IN)
LF 269.000 $64.000 $90.000 $50.000
RC PIPE (CL III)(24 IN)
LF 92.000 $98.000 $100.000 $75.000
MANH (COMPL)(PRM)(48IN)
EA 2.000 $3,500.000 $3,000.000 $2,185.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 3.000 $3,200.000 $3,500.000 $2,785.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 2.000 $3,200.000 $3,200.000 $2,850.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 1.000 $3,200.000 $3,500.000 $2,875.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 1.000 $850.000 $1,700.000 $850.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 1.000 $850.000 $1,700.000 $950.000
REMOV STR (INLET)
EA 6.000 $540.000 $400.000 $500.000
REMOV STR (SET)
EA 2.000 $800.000 $400.000 $400.000
REMOV STR (PIPE)
LF 229.000 $25.000 $10.000 $20.000
MOBILIZATION
LS 1.000 $160,500.000 $230,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $8,500.000 $22,500.000 $2,750.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 30.000 $27.000 $40.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $10.000 $12.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 228.000 $35.000 $25.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 228.000 $12.400 $6.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,608.000 $2.600 $2.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,608.000 $0.700 $0.500 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 95.000 $4.200 $7.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 95.000 $0.900 $1.000 $2.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 750.000 $5.700 $15.000 $45.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 40.000 $12.500 $15.000 $45.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 750.000 $3.800 $7.000 $40.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $6.800 $7.000 $40.000
PORT CTB CONNECT HARDWARE
EA 40.000 $22.500 $25.000 $5.000
CONC CURB (MONO) (TY II)
LF 3,219.000 $3.800 $4.000 $7.000
CONC CURB & GUTTER (TY II)
LF 375.000 $25.600 $30.000 $10.000
DRIVEWAYS (CONC)
SY 683.000 $72.000 $80.000 $65.000
CONC SIDEWALKS (5")
SY 801.000 $64.000 $70.000 $45.000
CURB RAMPS (TY 1)
EA 7.000 $2,680.000 $2,000.000 $1,250.000
CURB RAMPS (TY 7)
EA 15.000 $1,370.000 $2,200.000 $1,300.000
CURB RAMPS (TY 21)
EA 2.000 $3,450.000 $2,300.000 $1,450.000
CONC MEDIAN
LF 232.000 $32.000 $70.000 $20.000
CONC MEDIAN
SY 1,095.000 $62.000 $70.000 $40.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $1,998.000 $3,000.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 138.000 $5.300 $3.000 $5.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $206.700 $300.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $2,400.000 $3,000.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $400.300 $300.000 $450.000
CONDT (PVC) (SCH 80) (2")
LF 840.000 $5.600 $10.000 $6.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,010.000 $12.600 $12.000 $13.500
CONDT (PVC) (SCH 80) (3")
LF 600.000 $7.600 $13.000 $7.250
CONDT (PVC) (SCH 80) (3") (BORE)
LF 570.000 $18.800 $14.000 $14.500
CONDT (PVC) (SCH 80) (4")
LF 30.000 $10.000 $20.000 $9.250
ELEC CONDR (NO.6) BARE
LF 2,860.000 $1.200 $1.100 $2.000
ELEC CONDR (NO.4) BARE
LF 280.000 $1.600 $2.000 $2.000
ELEC CONDR (NO.4) INSULATED
LF 560.000 $1.800 $2.000 $2.500
TRAY CABLE (4 CONDR) (12 AWG)
LF 3,430.000 $1.800 $2.000 $2.750
GROUND BOX TY D (162922)
EA 9.000 $840.000 $700.000 $950.000
GROUND BOX TY D (162922)W/APRON
EA 6.000 $720.000 $800.000 $1,150.000
GROUND BOX TY 2 (243636)
EA 2.000 $1,500.000 $2,000.000 $1,450.000
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
EA 2.000 $4,600.000 $4,900.000 $4,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $360.000 $450.000 $500.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 5.000 $600.000 $700.000 $400.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $610.000 $760.000 $425.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $750.000 $960.000 $550.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $360.000 $600.000 $250.000
REMOVE SM RD SN SUP&AM
EA 4.000 $106.700 $100.000 $200.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 984.000 $1.000 $1.000 $0.800
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 25.000 $1.500 $5.000 $2.000
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 3,928.000 $1.500 $1.500 $1.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 134.000 $4.300 $16.000 $5.500
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 499.000 $1.800 $2.000 $1.900
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,074.000 $0.900 $22.000 $1.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,076.000 $2.500 $3.000 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 442.000 $5.300 $6.500 $7.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 17.000 $107.200 $100.000 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 15.000 $129.600 $100.000 $150.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 32.000 $52.000 $25.000 $30.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,076.000 $2.300 $3.000 $5.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 577.000 $0.200 $1.000 $0.500
REFL PAV MRK TY II (W) 4" (SLD)
LF 86.000 $0.200 $1.000 $0.500
REFL PAV MRK TY II (W) 8" (DOT)
LF 44.000 $0.500 $2.000 $1.000
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,258.000 $0.500 $2.000 $0.750
REFL PAV MRK TY II (W) 12" (SLD)
LF 365.000 $1.600 $1.000 $1.500
REFL PAV MRK TY II (W) 24" (SLD)
LF 250.000 $3.200 $2.000 $2.500
REFL PAV MRK TY II (W) (ARROW)
EA 9.000 $59.700 $75.000 $70.000
REFL PAV MRK TY II (W) (WORD)
EA 8.000 $64.000 $75.000 $70.000
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 22.000 $18.000 $12.000 $25.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 1,442.000 $0.200 $1.000 $0.500
REFL PAV MRK TY II (Y) 12" (SLD)
LF 365.000 $2.200 $1.000 $1.500
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,083.000 $0.400 $2.000 $0.750
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 366.000 $0.300 $2.000 $0.750
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,442.000 $1.000 $2.000 $0.750
REFL PAV MRKR TY I-C
EA 168.000 $3.800 $5.000 $7.000
REFL PAV MRKR TY II-A-A
EA 72.000 $3.400 $10.000 $7.000
ELIM EXT PAV MRK & MRKS (4")
LF 3,539.000 $0.300 $0.700 $0.500
INSTALL HWY TRF SIG (SYSTEM)
EA 3.000 $23,000.000 $40,000.000 $155,000.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $2,000.000 $3,500.000 $4,650.000
TEMP TRAF SIGNALS
EA 2.000 $26,000.000 $40,000.000 $20,500.000
VEH SIG SEC (12")LED(GRN)
EA 21.000 $160.000 $220.000 $200.000
VEH SIG SEC (12")LED(GRN ARW)
EA 10.000 $160.000 $220.000 $200.000
VEH SIG SEC (12")LED(YEL)
EA 21.000 $160.000 $220.000 $200.000
VEH SIG SEC (12")LED(YEL ARW)
EA 10.000 $160.000 $220.000 $200.000
VEH SIG SEC (12")LED(RED)
EA 21.000 $160.000 $220.000 $200.000
VEH SIG SEC (12")LED(RED ARW)
EA 20.000 $160.000 $220.000 $200.000
PED SIG SEC (LED)(COUNTDOWN)
EA 14.000 $360.000 $500.000 $375.000
BACK PLATE (12")(3 SEC)
EA 21.000 $68.900 $120.000 $75.000
BACK PLATE (12")(4 SEC)
EA 10.000 $86.400 $135.000 $95.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 3,220.000 $1.200 $1.000 $1.550
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 3,300.000 $1.400 $1.300 $1.800
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 6,150.000 $1.800 $1.800 $2.500
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 1.000 $5,600.000 $7,000.000 $6,000.000
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $6,400.000 $7,000.000 $6,750.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 3.000 $7,400.000 $8,000.000 $7,850.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 1.000 $8,200.000 $8,000.000 $7,850.000
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 3.000 $14,500.000 $20,000.000 $14,500.000
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 1.000 $19,756.300 $20,000.000 $14,500.000
PED POLE ASSEMBLY
EA 7.000 $1,280.000 $2,000.000 $1,550.000
PED DETECT PUSH BUTTON (APS)
EA 14.000 $1,200.000 $650.000 $1,150.000
PED DETECTOR CONTROLLER UNIT
EA 10.000 $4,062.000 $3,200.000 $1,950.000
REMOVAL OF GROUND BOXES
EA 10.000 $320.000 $500.000 $500.000
FULL - WIDTH MOWING
CYC 3.000 $2,200.000 $1,000.000 $1,500.000
LITTER REMOVAL
CYC 3.000 $1,700.000 $1,000.000 $1,250.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 0.500 $1,500.000 $500.000 $1,250.000
CLEANING / SWEEPING (SPOT)
MI 0.500 $500.000 $500.000 $1,250.000
LANDSCAPE SOIL AMENDMENT (TYPE I)
SY 112.000 $1.000 $2.000 $18.000
LANDSCAPE SOIL AMENDMENT (TYPE II)
SY 112.000 $1.000 $2.000 $18.000
LANDSCAPE SOIL AMENDMENT (TYPE III)
SY 28.000 $6.000 $5.000 $18.000
LANDSCAPE SOIL AMENDMENT (TYPE IV)
SY 84.000 $6.000 $2.000 $18.000
LANDSCAPE SOIL AMENDMENT (TYPE V)
SY 112.000 $1.000 $4.000 $18.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 1,350.000 $50.000 $25.000 $25.000
FIBER OPTIC CBL (SNGLE-MODE)(24 FIBER)
LF 390.000 $30.000 $6.000 $8.000
FIBER OPTIC SPLICE ENCLOSURE
EA 2.000 $1,200.000 $3,000.000 $1,500.000
FIBER OPTIC PATCH PANEL (48 POSITION)
EA 2.000 $350.000 $1,700.000 $2,950.000
Totals: $1,840,443.900 $2,299,180.800 $2,415,137.300