PREPARING ROW
|
STA
|
271.770
|
$4,500.000
|
$17,778.000
|
$44,160.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
7,658.000
|
$3.100
|
$4.650
|
$10.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,685.000
|
$3.100
|
$3.350
|
$30.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
1,001.000
|
$3.100
|
$6.610
|
$30.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,141.000
|
$3.100
|
$5.710
|
$30.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
531.000
|
$9.700
|
$8.000
|
$30.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
5,532.760
|
$3.000
|
$8.480
|
$2.600
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
122,758.000
|
$3.000
|
$5.080
|
$3.750
|
|
|
REMOV STAB BASE & ASPH PAV (4"-14")
|
SY
|
20,965.000
|
$2.000
|
$5.180
|
$6.800
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
78,463.000
|
$5.150
|
$5.710
|
$10.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
119,942.000
|
$5.500
|
$8.410
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
153,255.000
|
$7.500
|
$11.110
|
$10.000
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
5,746.000
|
$45.000
|
$57.630
|
$80.000
|
|
|
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
|
CY
|
3,918.000
|
$50.000
|
$53.240
|
$80.000
|
|
|
EMB(FINAL)(DC)(TYE)(CSBE)(EMB FND IMPR)
|
CY
|
5,600.000
|
$50.000
|
$56.400
|
$80.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
26,057.000
|
$1.000
|
$1.050
|
$1.050
|
|
|
BLOCK SODDING
|
SY
|
231,433.000
|
$5.000
|
$3.550
|
$3.550
|
|
|
STRAW OR HAY MULCH
|
SY
|
291,850.000
|
$0.200
|
$0.150
|
$0.150
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
265,793.000
|
$0.130
|
$0.200
|
$0.200
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
26,057.000
|
$0.180
|
$0.250
|
$0.250
|
|
|
FERTILIZER
|
AC
|
108.450
|
$700.000
|
$650.000
|
$650.000
|
|
|
VEGETATIVE WATERING
|
MG
|
12,994.300
|
$12.000
|
$29.000
|
$37.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
279,176.000
|
$1.500
|
$3.570
|
$3.400
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
4,564.400
|
$165.000
|
$343.210
|
$332.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
274,531.000
|
$7.000
|
$10.290
|
$12.900
|
|
|
ASPHALT STAB BASE (GR 2)(PG 70)
|
TON
|
18,657.700
|
$88.000
|
$127.240
|
$129.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
15,000.800
|
$77.000
|
$139.000
|
$129.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (0 TO 6")
|
SY
|
5,532.760
|
$4.500
|
$5.330
|
$2.350
|
|
|
SALV, HAUL STKPL RCL ASPH PAV(0"TO 24")
|
SY
|
109,887.000
|
$4.500
|
$10.650
|
$2.600
|
|
|
SALV, HAUL & STKPL RCL ASH PV (12")
|
SY
|
29,276.000
|
$4.500
|
$13.660
|
$4.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (0-12")
|
SY
|
25,555.000
|
$3.650
|
$6.380
|
$2.600
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
249,490.000
|
$50.000
|
$69.430
|
$70.000
|
|
|
CURB (TYPE II)
|
LF
|
56,241.000
|
$4.800
|
$3.480
|
$5.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(12")
|
SY
|
24,309.000
|
$88.000
|
$106.130
|
$127.000
|
|
|
STRUCT EXCAV
|
CY
|
33,462.000
|
$7.500
|
$14.630
|
$5.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
656.000
|
$10.800
|
$22.280
|
$5.000
|
|
|
CEM STABIL BKFL
|
CY
|
21,772.000
|
$45.000
|
$56.330
|
$60.000
|
|
|
CUT & RESTORING PAV
|
SY
|
352.000
|
$40.000
|
$116.950
|
$175.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
1,706.000
|
$45.000
|
$56.330
|
$60.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
30,288.000
|
$1.470
|
$1.070
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
69,315.000
|
$18.000
|
$13.650
|
$1.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
2,822.000
|
$131.000
|
$121.260
|
$92.750
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
2,782.000
|
$172.000
|
$157.830
|
$146.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
29,148.000
|
$208.000
|
$187.160
|
$202.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
1,536.000
|
$425.000
|
$332.190
|
$359.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
14.000
|
$73.000
|
$95.000
|
$118.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
540.000
|
$200.000
|
$165.000
|
$197.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
86.000
|
$339.000
|
$300.000
|
$287.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
460.000
|
$486.000
|
$485.000
|
$401.000
|
|
|
CL A CONC (DITCH INTERCEPTOR STRUCTURE)
|
CY
|
38.000
|
$650.000
|
$1,282.710
|
$525.000
|
|
|
CL C CONC (ABUT)
|
CY
|
230.600
|
$1,000.000
|
$1,475.370
|
$1,500.000
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
17.400
|
$905.000
|
$3,753.440
|
$7,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
105.200
|
$1,100.000
|
$1,608.640
|
$1,500.000
|
|
|
CL C CONC (CAP)(EXTEND)
|
CY
|
10.800
|
$915.000
|
$5,678.190
|
$7,500.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
1,761.700
|
$835.000
|
$1,632.360
|
$1,500.000
|
|
|
CL C CONC (FOOTING)
|
CY
|
1,948.400
|
$645.000
|
$728.390
|
$1,500.000
|
|
|
CL F CONC (CAP)
|
CY
|
2,663.400
|
$600.000
|
$885.590
|
$1,500.000
|
|
|
REINF CONC SLAB
|
SF
|
280,835.000
|
$17.000
|
$19.270
|
$18.500
|
|
|
BRIDGE MEDIAN
|
SF
|
2,516.000
|
$6.600
|
$50.000
|
$25.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
1,776.000
|
$6.600
|
$30.000
|
$25.000
|
|
|
REINF CONC SLAB (SLAB BEAM)(EXT SLAB)
|
SF
|
2,628.000
|
$11.700
|
$39.940
|
$75.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
2,611.000
|
$61.500
|
$74.670
|
$77.000
|
|
|
RETAINING WALL (MSE) (WAVE SCHEME)
|
SF
|
26,922.000
|
$33.000
|
$40.240
|
$66.000
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
1,392.720
|
$150.000
|
$172.880
|
$165.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
1,418.940
|
$180.000
|
$177.050
|
$165.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
1,827.000
|
$190.000
|
$167.310
|
$165.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
1,305.000
|
$210.000
|
$170.710
|
$165.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
28,603.490
|
$160.000
|
$191.100
|
$165.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,184.000
|
$380.000
|
$420.250
|
$314.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
8.000
|
$425.000
|
$632.440
|
$494.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
1,024.000
|
$380.000
|
$332.470
|
$334.000
|
|
|
RIPRAP CONC (8 IN)
|
CY
|
96.000
|
$380.000
|
$644.280
|
$358.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
13.000
|
$650.000
|
$999.760
|
$606.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
198.000
|
$410.000
|
$467.900
|
$534.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
20.000
|
$380.000
|
$1,014.230
|
$662.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
246.000
|
$70.000
|
$267.640
|
$162.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
238.000
|
$114.000
|
$218.680
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
88.000
|
$380.000
|
$686.740
|
$118.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
1,046.300
|
$8.000
|
$14.620
|
$26.000
|
|
|
RAIL (TY T223)
|
LF
|
845.000
|
$51.000
|
$75.410
|
$69.500
|
|
|
RAIL (TY SSTR)
|
LF
|
8,425.000
|
$43.000
|
$51.680
|
$59.500
|
|
|
RAIL (TY C223)
|
LF
|
438.300
|
$60.000
|
$123.820
|
$218.000
|
|
|
RAIL (HANDRAIL)(TY C)
|
LF
|
138.000
|
$95.000
|
$174.220
|
$230.000
|
|
|
RAIL (TY PR11)
|
LF
|
709.000
|
$50.000
|
$132.650
|
$121.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
426.000
|
$160.000
|
$89.320
|
$200.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
873.000
|
$105.500
|
$174.430
|
$225.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
313.000
|
$40.000
|
$69.380
|
$187.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
2,490.000
|
$210.000
|
$241.780
|
$252.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
340.000
|
$255.000
|
$249.430
|
$262.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
5,086.000
|
$246.000
|
$254.860
|
$265.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
512.000
|
$247.000
|
$298.900
|
$290.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
510.000
|
$290.000
|
$314.580
|
$459.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
3,126.000
|
$290.000
|
$347.720
|
$343.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
2,865.000
|
$280.000
|
$360.660
|
$374.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
1,242.000
|
$296.000
|
$383.830
|
$386.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
1,645.000
|
$366.000
|
$443.300
|
$567.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
1,416.000
|
$415.000
|
$500.550
|
$477.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
1,303.000
|
$397.000
|
$537.080
|
$548.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
295.000
|
$420.000
|
$618.260
|
$632.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
45.000
|
$530.000
|
$724.600
|
$716.000
|
|
|
CONC BOX CULV (8 FT X 6 FT)
|
LF
|
50.000
|
$532.000
|
$801.840
|
$791.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,201.000
|
$72.000
|
$94.640
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
5,936.000
|
$75.000
|
$101.740
|
$92.500
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,898.000
|
$87.000
|
$103.920
|
$113.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
2,996.000
|
$115.000
|
$127.230
|
$131.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
56.000
|
$135.000
|
$159.040
|
$244.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
10.000
|
$3,008.000
|
$9,025.830
|
$8,820.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
2.000
|
$6,300.000
|
$4,806.190
|
$5,920.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
2.000
|
$6,400.000
|
$7,757.450
|
$7,440.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX5FT)
|
EA
|
1.000
|
$6,300.000
|
$5,954.740
|
$7,240.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
3.000
|
$6,485.000
|
$8,727.510
|
$9,280.000
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
15.000
|
$12,000.000
|
$13,011.480
|
$13,780.000
|
|
|
INLET (COMPL)(PSL)(SL)(4FTX4FT)
|
EA
|
2.000
|
$2,980.000
|
$8,078.210
|
$7,500.000
|
|
|
INLET (COMPL)(PSL)(SL)(3FTX5FT)
|
EA
|
12.000
|
$3,800.000
|
$6,902.070
|
$6,400.000
|
|
|
INLET (COMPL)(PSL)(SL)(6FTX6FT)
|
EA
|
10.000
|
$7,000.000
|
$6,426.940
|
$7,500.000
|
|
|
INLET (COMPL)(PSL)(SL)(8FTX8FT)
|
EA
|
3.000
|
$7,000.000
|
$11,645.570
|
$12,400.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
10.000
|
$3,600.000
|
$5,971.140
|
$8,100.000
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX5FT)
|
EA
|
2.000
|
$3,800.000
|
$4,901.940
|
$7,100.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX5FT)
|
EA
|
3.000
|
$5,000.000
|
$6,085.710
|
$7,200.000
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX5FT)
|
EA
|
1.000
|
$4,800.000
|
$6,192.640
|
$7,300.000
|
|
|
INLET (COMPL)(PSL)(RC)(6FTX6FT)
|
EA
|
6.000
|
$7,000.000
|
$8,010.280
|
$9,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(8FTX8FT)
|
EA
|
6.000
|
$5,000.000
|
$12,394.010
|
$13,100.000
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
9.000
|
$5,000.000
|
$6,033.220
|
$6,300.000
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
16.000
|
$3,300.000
|
$4,001.670
|
$4,400.000
|
|
|
INLET (COMPL)(TY A)
|
EA
|
2.000
|
$2,670.000
|
$7,196.360
|
$6,600.000
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
10.000
|
$3,500.000
|
$5,415.150
|
$9,530.000
|
|
|
INLET (COMPL)(TY AZR)
|
EA
|
8.000
|
$4,000.000
|
$5,819.500
|
$14,080.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
17.000
|
$4,500.000
|
$5,329.620
|
$6,010.000
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
28.000
|
$3,800.000
|
$5,391.640
|
$7,130.000
|
|
|
INLET (COMPL)(CURB)(TY C1)
|
EA
|
49.000
|
$4,300.000
|
$6,184.980
|
$8,050.000
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
10.000
|
$8,000.000
|
$17,647.940
|
$17,640.000
|
|
|
JCT BOX (COMPL)(SPL1)
|
EA
|
1.000
|
$9,000.000
|
$64,460.360
|
$64,400.000
|
|
|
JCT BOX (COMPL)(SPL2)
|
EA
|
1.000
|
$8,000.000
|
$63,957.840
|
$67,500.000
|
|
|
INLET (COMPL) (TY AD) (MOD)
|
EA
|
30.000
|
$3,000.000
|
$8,242.510
|
$4,400.000
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
34.000
|
$1,000.000
|
$1,647.390
|
$1,640.000
|
|
|
MANH (COMPL)(RISER ONLY)
|
EA
|
2.000
|
$1,300.000
|
$2,769.530
|
$4,330.000
|
|
|
INLET (COMPL) (EXT) (TY CI)
|
EA
|
12.000
|
$1,265.000
|
$2,037.340
|
$1,580.000
|
|
|
INLET EXT
|
EA
|
12.000
|
$1,300.000
|
$1,514.510
|
$1,580.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
4.000
|
$5,700.000
|
$18,991.200
|
$21,590.000
|
|
|
WINGWALL (SW - 0) (HW=5 FT)
|
EA
|
3.000
|
$6,700.000
|
$11,529.180
|
$30,020.000
|
|
|
WINGWALL (SW - 0) (HW=6 FT)
|
EA
|
1.000
|
$7,200.000
|
$11,280.270
|
$34,370.000
|
|
|
WINGWALL (SW - 0) (HW=7 FT)
|
EA
|
1.000
|
$7,500.000
|
$16,254.750
|
$37,200.000
|
|
|
SET (TY I) (30 IN) (4: 1) (C)
|
EA
|
16.000
|
$3,500.000
|
$5,073.050
|
$8,540.000
|
|
|
SET (TY I)(S=3 FT)(HW=2FT)(3:1)(C)
|
EA
|
2.000
|
$2,350.000
|
$6,088.810
|
$4,880.000
|
|
|
SET (TY I)(S=3 FT)(HW=2FT)(3:1)(P)
|
EA
|
2.000
|
$2,350.000
|
$6,302.660
|
$5,080.000
|
|
|
SET (TY I)(S=3 FT)(HW=2FT)(6:1)(P)
|
EA
|
13.000
|
$2,370.000
|
$7,478.760
|
$6,180.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
3.000
|
$5,500.000
|
$6,088.790
|
$4,880.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
31.000
|
$4,400.000
|
$7,624.030
|
$6,180.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1) (P)
|
EA
|
14.000
|
$5,100.000
|
$8,942.770
|
$7,380.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
2.000
|
$6,500.000
|
$6,697.460
|
$5,280.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
4.000
|
$4,870.000
|
$8,761.810
|
$7,380.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
1.000
|
$15,100.000
|
$7,303.280
|
$5,880.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
1.000
|
$15,150.000
|
$8,265.560
|
$6,780.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
1.000
|
$4,980.000
|
$11,774.230
|
$9,880.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
3.000
|
$5,100.000
|
$8,887.370
|
$7,180.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
2.000
|
$6,800.000
|
$11,597.740
|
$9,780.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$5,100.000
|
$11,514.610
|
$10,170.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$6,500.000
|
$14,220.220
|
$12,570.000
|
|
|
SET (TY II) (18 IN) (RCP) (2: 1) (C)
|
EA
|
2.000
|
$1,000.000
|
$1,192.460
|
$1,620.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$1,200.000
|
$1,192.950
|
$1,620.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$1,200.220
|
$1,620.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
9.000
|
$1,120.000
|
$1,310.870
|
$1,680.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,500.000
|
$1,317.250
|
$1,770.000
|
|
|
SET (TY II) (24 IN) (HDPE) (3: 1) (C)
|
EA
|
1.000
|
$1,000.000
|
$1,483.060
|
$1,840.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
16.000
|
$1,500.000
|
$1,482.010
|
$1,340.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
3.000
|
$1,000.000
|
$1,433.520
|
$1,340.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
15.000
|
$1,200.000
|
$1,588.860
|
$1,940.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,250.000
|
$1,743.520
|
$2,130.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,200.000
|
$2,102.840
|
$1,910.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,200.000
|
$2,453.470
|
$2,800.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,200.000
|
$2,637.430
|
$3,040.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,300.000
|
$3,150.660
|
$3,520.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,550.000
|
$2,665.010
|
$2,980.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$4,000.000
|
$3,674.570
|
$4,010.000
|
|
|
SET (TY II) (42 IN) (RCP) (3: 1) (P)
|
EA
|
1.000
|
$2,650.000
|
$7,704.230
|
$6,530.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$3,700.000
|
$7,324.660
|
$6,170.000
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
22.000
|
$1,800.000
|
$3,892.460
|
$3,840.000
|
|
|
PIPE (PVC) (SCH 40) (8 IN)
|
LF
|
1,198.000
|
$200.000
|
$37.960
|
$62.250
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$525.000
|
$983.720
|
$5,000.000
|
|
|
REMOV STR (SET)
|
EA
|
84.000
|
$380.000
|
$491.850
|
$1,550.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
5.000
|
$1,500.000
|
$3,934.830
|
$5,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
15,173.000
|
$3.000
|
$24.140
|
$20.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
324.000
|
$5.000
|
$64.400
|
$100.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$30,000.000
|
$40,570.000
|
$75,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$40,000.000
|
$48,270.000
|
$100,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
1,349.000
|
$6.750
|
$12.530
|
$5.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$7,900,000.000
|
$11,000,000.000
|
$12,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
51.000
|
$6,100.000
|
$19,526.870
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
422.000
|
$50.000
|
$40.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
422.000
|
$8.000
|
$15.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
6,002.000
|
$27.000
|
$30.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
6,002.000
|
$7.400
|
$15.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
14,103.000
|
$2.400
|
$3.250
|
$3.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
14,103.000
|
$0.700
|
$1.250
|
$1.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
6,175.000
|
$3.700
|
$6.500
|
$6.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
6,175.000
|
$0.800
|
$2.000
|
$2.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
2,820.000
|
$15.000
|
$35.260
|
$108.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
480.000
|
$8.500
|
$21.430
|
$27.400
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
28,030.000
|
$10.000
|
$13.940
|
$14.800
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
480.000
|
$6.000
|
$18.390
|
$7.650
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
37,140.000
|
$8.500
|
$9.540
|
$5.100
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
4,580.000
|
$8.500
|
$9.570
|
$20.300
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
480.000
|
$6.000
|
$19.470
|
$16.100
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
28,030.000
|
$8.000
|
$12.410
|
$17.100
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
2,920.000
|
$8.000
|
$12.440
|
$22.800
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
1,726.000
|
$55.000
|
$90.880
|
$109.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
6,241.000
|
$55.000
|
$96.230
|
$72.250
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
13,948.000
|
$5.500
|
$4.060
|
$5.850
|
|
|
DRIVEWAYS (CONC)
|
SY
|
13,876.000
|
$45.000
|
$70.890
|
$73.750
|
|
|
DRIVEWAYS (ACP)
|
SY
|
149.000
|
$45.000
|
$254.020
|
$185.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
16,790.000
|
$48.000
|
$58.950
|
$70.750
|
|
|
CURB RAMPS (TY 1)
|
EA
|
10.000
|
$1,660.000
|
$2,247.790
|
$2,690.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$1,660.000
|
$2,247.800
|
$3,150.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
9.000
|
$1,970.000
|
$4,586.040
|
$3,250.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
32.000
|
$1,500.000
|
$2,247.780
|
$3,030.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
41.000
|
$1,200.000
|
$2,247.780
|
$3,440.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
4.000
|
$1,740.000
|
$2,461.630
|
$4,160.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,575.000
|
$18.400
|
$25.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$1,750.000
|
$2,100.000
|
$2,100.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
6.000
|
$1,250.000
|
$1,565.000
|
$1,570.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
50.000
|
$18.400
|
$95.000
|
$95.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,291.000
|
$2.000
|
$4.000
|
$4.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
$2,800.000
|
$3,100.000
|
$3,100.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$245.000
|
$500.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
5.000
|
$23,500.000
|
$26,500.000
|
$26,500.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
20.000
|
$280.000
|
$450.000
|
$450.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
1.000
|
$300.000
|
$495.000
|
$495.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$310.000
|
$685.000
|
$685.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
27.000
|
$1,500.000
|
$975.000
|
$1,020.000
|
|
|
IN RD IL (TY SA) 30B-8 (250W EQ) LED
|
EA
|
50.000
|
$4,200.000
|
$3,375.000
|
$4,360.000
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
54.000
|
$5,700.000
|
$4,375.000
|
$4,180.000
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
39,543.000
|
$7.530
|
$15.500
|
$14.800
|
|
|
CONDT (PVC) (SCH 80) (3/4")
|
LF
|
980.000
|
$7.530
|
$10.000
|
$7.300
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
28,610.000
|
$27.530
|
$10.850
|
$13.700
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
5,105.000
|
$18.650
|
$11.500
|
$26.500
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
1,440.000
|
$21.900
|
$18.750
|
$21.300
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
11,588.000
|
$25.350
|
$33.550
|
$28.200
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
150.000
|
$23.000
|
$26.850
|
$25.700
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
185.000
|
$23.000
|
$27.000
|
$31.000
|
|
|
CONDT (RM) (2")
|
LF
|
11,492.000
|
$26.000
|
$37.500
|
$33.250
|
|
|
CONDT (RM) (3")
|
LF
|
4,490.000
|
$39.500
|
$83.150
|
$64.750
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
25,560.000
|
$1.100
|
$1.300
|
$0.900
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
29,743.000
|
$1.100
|
$1.850
|
$1.750
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
49,396.000
|
$1.200
|
$1.950
|
$1.850
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,445.000
|
$0.760
|
$1.850
|
$1.750
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
360.000
|
$1.750
|
$2.600
|
$2.300
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
955.000
|
$2.900
|
$2.750
|
$2.900
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
5,415.000
|
$2.300
|
$2.650
|
$2.750
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
3,820.000
|
$2.650
|
$3.600
|
$4.200
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
50.000
|
$1,295.000
|
$1,175.000
|
$1,040.000
|
|
|
REMOVE GROUND BOX
|
EA
|
9.000
|
$281.000
|
$375.000
|
$285.000
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
|
EA
|
4.000
|
$5,900.000
|
$7,995.000
|
$11,300.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
7.000
|
$6,245.000
|
$7,005.000
|
$5,630.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
60.000
|
$31.000
|
$52.060
|
$28.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
127.000
|
$512.000
|
$400.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
53.000
|
$690.000
|
$510.000
|
$510.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
16.000
|
$630.000
|
$615.000
|
$615.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
5.000
|
$600.000
|
$385.000
|
$385.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
3.000
|
$600.000
|
$520.000
|
$520.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
3.000
|
$1,400.000
|
$435.000
|
$435.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
1.000
|
$600.000
|
$585.000
|
$585.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$885.000
|
$675.000
|
$675.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
4.000
|
$1,400.000
|
$755.000
|
$755.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
9.000
|
$1,052.000
|
$715.000
|
$715.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$1,026.000
|
$815.000
|
$815.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
2.000
|
$1,200.000
|
$950.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
5.000
|
$2,000.000
|
$2,800.000
|
$1,740.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
5.000
|
$1,800.000
|
$2,000.000
|
$2,800.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$390.000
|
$370.000
|
$370.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$145.000
|
$100.000
|
$100.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
390.000
|
$5.000
|
$24.300
|
$5.850
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
124.000
|
$21.000
|
$25.500
|
$25.500
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
60.000
|
$25.000
|
$26.500
|
$26.500
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
4.000
|
$234.000
|
$215.000
|
$215.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
23.000
|
$31.400
|
$35.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
5.000
|
$65.000
|
$85.000
|
$85.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
43,620.000
|
$0.230
|
$0.580
|
$0.450
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,600.000
|
$0.440
|
$1.240
|
$0.850
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
61.000
|
$1.950
|
$6.000
|
$8.150
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
7.000
|
$125.000
|
$125.000
|
$153.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
|
EA
|
1.000
|
$130.000
|
$250.000
|
$216.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
4.000
|
$110.000
|
$250.000
|
$186.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
39,894.000
|
$0.230
|
$0.580
|
$0.450
|
|
|
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
|
LF
|
1,899.000
|
$2.470
|
$6.000
|
$5.200
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
1,285.000
|
$0.850
|
$1.150
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
536.000
|
$1.500
|
$3.000
|
$2.700
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
96,538.000
|
$0.850
|
$1.200
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
7,236.000
|
$1.400
|
$2.160
|
$2.200
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
1,141.000
|
$1.500
|
$14.000
|
$6.900
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
19.000
|
$150.000
|
$215.000
|
$358.000
|
|
|
WK ZN PAV MRK REMOV (W)(DBL ARROW)
|
EA
|
8.000
|
$112.000
|
$377.000
|
$556.000
|
|
|
WK ZN PAV MRK REMOV (W)(RR XING)
|
EA
|
2.000
|
$150.000
|
$600.000
|
$1,000.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
7.000
|
$290.000
|
$290.000
|
$534.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
430.000
|
$120.000
|
$1.150
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(DOT)
|
LF
|
75.000
|
$1.500
|
$3.000
|
$2.250
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
93,355.000
|
$0.640
|
$1.200
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (Y)24"(SLD)
|
LF
|
981.000
|
$1.500
|
$14.000
|
$6.900
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
216.000
|
$2.300
|
$1.050
|
$1.550
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
41,699.000
|
$0.950
|
$1.050
|
$2.200
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
23.000
|
$18.000
|
$40.000
|
$30.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
30.000
|
$18.000
|
$50.000
|
$37.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
1.000
|
$35.000
|
$50.000
|
$43.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
7.000
|
$45.000
|
$55.000
|
$45.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
166.000
|
$228.000
|
$215.000
|
$302.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
20.000
|
$405.000
|
$377.000
|
$502.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
23.000
|
$355.000
|
$377.000
|
$521.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
184.000
|
$260.000
|
$290.000
|
$404.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
2.000
|
$600.000
|
$650.000
|
$1,000.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
32.000
|
$60.000
|
$70.000
|
$74.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
48.000
|
$4.500
|
$6.070
|
$4.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
70.000
|
$5.500
|
$6.070
|
$4.750
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,751.000
|
$4.200
|
$6.070
|
$4.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
275,733.000
|
$0.700
|
$0.400
|
$0.450
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
8,836.000
|
$0.700
|
$0.750
|
$0.800
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
4,082.000
|
$0.700
|
$2.150
|
$3.650
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
26.000
|
$32.000
|
$75.000
|
$44.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
9.000
|
$70.000
|
$100.000
|
$61.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
11.000
|
$85.000
|
$100.000
|
$51.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
259,740.000
|
$0.020
|
$0.100
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
114,951.000
|
$0.030
|
$0.150
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
32,134.000
|
$0.070
|
$0.200
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
41,951.000
|
$0.190
|
$0.250
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
6,956.000
|
$0.280
|
$2.000
|
$0.550
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
184.000
|
$8.700
|
$13.000
|
$13.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
25.000
|
$12.800
|
$23.000
|
$18.300
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
23.000
|
$10.200
|
$23.000
|
$18.300
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
190.000
|
$10.400
|
$18.000
|
$15.300
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
2.000
|
$33.000
|
$60.000
|
$57.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
32.000
|
$16.000
|
$10.000
|
$6.150
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
7.000
|
$41,610.000
|
$32,512.600
|
$30,700.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
7.000
|
$3,365.000
|
$3,000.000
|
$3,950.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
6.000
|
$53,545.000
|
$47,450.000
|
$58,200.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
66.000
|
$258.000
|
$285.000
|
$208.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
21.000
|
$255.000
|
$285.000
|
$221.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
66.000
|
$301.000
|
$285.000
|
$213.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
21.000
|
$254.000
|
$285.000
|
$213.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
66.000
|
$258.000
|
$285.000
|
$208.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
36.000
|
$252.000
|
$285.000
|
$213.000
|
|
|
VEH SIG SEC (12")LED(GRN U-TURN ARW)
|
EA
|
1.000
|
$255.000
|
$285.000
|
$213.000
|
|
|
VEH SIG SEC (12")LED(YEL U-TURN ARW)
|
EA
|
1.000
|
$255.000
|
$280.000
|
$213.000
|
|
|
VEH SIG SEC (12")LED(RED U-TURN ARW)
|
EA
|
2.000
|
$255.000
|
$285.000
|
$213.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
50.000
|
$773.000
|
$705.000
|
$558.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
16.000
|
$154.000
|
$195.000
|
$166.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
21.000
|
$100.000
|
$195.000
|
$168.000
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
6.000
|
$120.000
|
$255.000
|
$228.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
43.000
|
$134.000
|
$185.000
|
$155.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
8,160.000
|
$1.850
|
$1.650
|
$1.600
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
8,810.000
|
$2.250
|
$2.050
|
$2.200
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
12,435.000
|
$3.100
|
$2.900
|
$3.150
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')ILSN
|
EA
|
1.000
|
$7,000.000
|
$14,095.000
|
$14,390.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM&ILSN
|
EA
|
1.000
|
$18,000.000
|
$15,885.000
|
$14,830.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM&ILSN
|
EA
|
1.000
|
$20,000.000
|
$16,215.000
|
$15,640.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM&ILSN
|
EA
|
1.000
|
$13,000.000
|
$16,925.000
|
$16,700.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')ILSN
|
EA
|
1.000
|
$15,040.000
|
$15,925.000
|
$16,620.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM&ILSN
|
EA
|
1.000
|
$17,910.000
|
$17,265.000
|
$17,540.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')ILSN
|
EA
|
3.000
|
$21,000.000
|
$33,775.000
|
$34,740.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM&ILSN
|
EA
|
1.000
|
$30,000.000
|
$36,735.000
|
$37,600.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')ILSN
|
EA
|
2.000
|
$20,500.000
|
$35,375.000
|
$35,950.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM&ILSN
|
EA
|
9.000
|
$39,865.000
|
$38,325.000
|
$39,200.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')ILSN
|
EA
|
1.000
|
$36,000.000
|
$36,185.000
|
$37,540.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM&ILSN
|
EA
|
1.000
|
$43,850.000
|
$38,975.000
|
$40,330.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM&ILSN
|
EA
|
1.000
|
$45,780.000
|
$39,435.000
|
$41,310.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
32.000
|
$2,638.000
|
$1,825.000
|
$3,300.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
46.000
|
$1,121.000
|
$755.000
|
$1,960.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
8.000
|
$3,169.000
|
$3,500.000
|
$1,370.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
19.000
|
$1,800.000
|
$1,106.110
|
$9,070.000
|
|
|
LITTER REMOVAL
|
CYC
|
19.000
|
$1,200.000
|
$1,336.420
|
$3,300.000
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
|
CY
|
1,372.000
|
$100.000
|
$206.720
|
$120.000
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
573.000
|
$257.000
|
$539.840
|
$637.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
205.200
|
$92.000
|
$312.210
|
$215.000
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
3,391.300
|
$250.000
|
$177.490
|
$154.000
|
|
|
THERMO PIPE(24")(HDPE)(TY S)(CSB)
|
LF
|
12.000
|
$62.000
|
$231.210
|
$200.000
|
|
|
THERMOPLASTIC PIPE (24 IN)(PP)(TYPE I)
|
LF
|
584.000
|
$35.000
|
$57.660
|
$200.000
|
|
|
THERMOPLASTIC PIPE (18 IN)(PP)(TYPE I)
|
LF
|
110.000
|
$31.000
|
$68.840
|
$200.000
|
|
|
MICROPILING
|
EA
|
8.000
|
$3,800.000
|
$20,750.000
|
$31,120.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
361.000
|
$40.000
|
$56.130
|
$42.500
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
815.000
|
$4.500
|
$6.250
|
$2.950
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(36 FIBER)
|
LF
|
29,525.000
|
$3.100
|
$4.000
|
$1.200
|
|
|
FO SPLICE ENCLOSURE (TYPE 2)
|
EA
|
5.000
|
$1,470.000
|
$965.000
|
$1,480.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
174.000
|
$53.850
|
$50.000
|
$32.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
5.000
|
$1,286.000
|
$1,250.000
|
$391.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
39,543.000
|
$10.900
|
$19.550
|
$19.500
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
9,298.000
|
$20.500
|
$44.750
|
$49.000
|
|
|
ITS MULTI-DUCT CND (RMC)
|
LF
|
4,490.000
|
$65.000
|
$125.750
|
$106.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
66,793.000
|
$0.680
|
$1.050
|
$0.800
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
13,264.000
|
$0.690
|
$1.100
|
$0.850
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
276.000
|
$1.250
|
$2.700
|
$1.850
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
23,219.000
|
$1.080
|
$1.700
|
$1.300
|
|
MULTIPOLYMER PAV MRK (W)(8")(DOT)
|
LF
|
682.000
|
$3.220
|
$3.000
|
$1.650
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
120.000
|
$3.220
|
$3.500
|
$4.900
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
44.000
|
$2.110
|
$3.500
|
$2.050
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
3,422.000
|
$6.740
|
$6.000
|
$9.750
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
21,138.000
|
$0.700
|
$1.050
|
$0.800
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
88.000
|
$3.200
|
$3.500
|
$4.750
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
13,264.000
|
$0.730
|
$1.150
|
$0.850
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
7.000
|
$8,621.000
|
$7,850.000
|
$9,440.000
|
|
|
CAT 5 ETHERNET CABLE
|
LF
|
1,775.000
|
$2.250
|
$1.750
|
$1.200
|
|
|
TMA (STATIONARY)
|
DAY
|
128.000
|
$261.000
|
$306.130
|
$428.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
168.000
|
$26.000
|
$662.340
|
$82.750
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
102.000
|
$3,800.000
|
$4,895.000
|
$4,640.000
|
|
|
VIVDS TEMPORARY
|
EA
|
11.000
|
$13,000.000
|
$19,655.000
|
$20,980.000
|
|
|
VIVDS PROSR SYS (INSTALL ONLY)
|
EA
|
7.000
|
$486.000
|
$585.000
|
$1,130.000
|
|
|
VIVDS CAM ASSY (INSTALL ONLY)
|
EA
|
28.000
|
$525.000
|
$585.000
|
$682.000
|
|
|
VIVDS CABLING (INSTALL ONLY)
|
LF
|
6,295.000
|
$1.400
|
$2.150
|
$2.400
|
|
|
SANITARY SEWER (10IN) (PVC) (C900)
|
LF
|
492.000
|
$260.000
|
$174.000
|
$85.000
|
|
|
SANITARY SEWER (12IN) (PVC) (C900)
|
LF
|
42.000
|
$350.000
|
$259.000
|
$166.000
|
|
|
MANHOLE (SAN SEWER) ( 4' DIA)
|
EA
|
2.000
|
$6,500.000
|
$9,804.500
|
$4,310.000
|
|
|
ABANDON SANITARY SEWER (10IN)
|
EA
|
1.000
|
$5,000.000
|
$1,924.500
|
$8,100.000
|
|
|
WATER MAIN PIPE (PVC) (8IN)
|
LF
|
1,177.000
|
$55.000
|
$120.500
|
$68.000
|
|
|
WATER MAIN PIPE (PVC) (10IN)
|
LF
|
336.000
|
$65.000
|
$216.000
|
$117.000
|
|
|
CASING STEEL (20IN)
|
LF
|
168.000
|
$300.000
|
$463.500
|
$358.000
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
4.000
|
$6,000.000
|
$11,138.000
|
$7,800.000
|
|
|
WET CONNECTION (8IN)
|
EA
|
2.000
|
$1,600.000
|
$2,833.000
|
$3,770.000
|
|
|
WET CONNECTION (10IN)
|
EA
|
2.000
|
$2,400.000
|
$2,762.500
|
$4,170.000
|
|
|
CASING STEEL (16 IN)
|
LF
|
168.000
|
$250.000
|
$410.500
|
$325.000
|
|
Totals: |
$86,402,641.030
|
$115,893,024.200
|