Show Job Controls
Bid Cobra

GALVESTON FM 646 (2523-03-014)

Items: 130

County: GALVESTON
Length: N/A
Highway: FM 646
District: HOUSTON
Control Number: 2523-03-014
DBE Goal: N/A
Project: STP 2023(630)VRU
Guaranty: N/A
Time: 319 WORKING DAYS
Engineer's Estimate: $15,413,289.35
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$15,413,289.35
$16,604,493.72
Over/Under Est: 7.73% $1,191,204.37
Subcontractor Percentage Amount
GREEN SAGE SERVICES LLC 2.83% $478,265.51
TRAFFIC SIGNS & LINES, LLC 2.15% $363,346.59
HB FARMER FOUNDATION, LLC 1.18% $199,418.13
INDUSTRIAL FABRICS, INC. 0.29% $49,009.54
AGGREGATE TECHNOLOGIES, INC. 0.05% $8,449.92
THIRD COAST SERVICES LLC 0.04% $6,759.94
PRIMATE CONSTRUCTION, LP 0.04% $6,759.94
SUPERIOR GROUTING SERVICES, INC. 0.02% $3,379.97
Total: 6.60% $1,115,389.54

Bid Items & Bid Tabulations

130 Total 0 of 130
GALVESTON  |  FM 646  |  HOUSTON  |  2523-03-014  |  06/27/2023  |  $15,413,289.35  |  STP 2023(630)VRU  |  HAZARD ELIM & SAFETY  |  319 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 202.000 $2,000.000 $1,020.000
REMOVING CONC (RIPRAP)
SY 633.000 $10.900 $22.000
REMOVING CONC (DRIVEWAYS)
SY 339.000 $12.500 $43.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 2,574.000 $3.500 $28.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 6,472.000 $5.500 $6.000
EXCAVATION (ROADWAY)
CY 24,143.000 $6.500 $36.350
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,767.000 $15.000 $12.750
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 157.000 $60.000 $147.970
BACKFILL (TY A OR B)
STA 189.850 $200.000 $412.000
BLOCK SODDING
SY 81,365.000 $3.500 $4.800
STRAW OR HAY MULCH
SY 40,683.000 $0.250 $0.220
DRILL SEED (TEMP)(WARM OR COOL)
SY 40,683.000 $0.200 $0.400
FERTILIZER
AC 16.810 $650.000 $841.000
VEGETATIVE WATERING
MG 2,017.000 $27.000 $36.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
SY 34,810.000 $30.000 $42.390
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 626.000 $300.000 $349.250
LIME TRT (EXST MATL)(8")
SY 34,810.000 $4.190 $5.750
PLANE ASPH CONC PAV (2")
SY 57,674.000 $2.900 $3.350
PAV JT UNDERSEAL (48")
LF 37,976.000 $28.000 $1.460
CEM STABIL BKFL
CY 7,551.000 $53.000 $62.000
CUT & RESTORE ASPH PAVING
SY 491.000 $130.000 $13.850
CEMENT STAB BACKFILL (INLET OR MH)
CY 80.000 $57.000 $62.000
FLOWABLE BACKFILL
CY 19.000 $225.000 $350.250
TRENCH EXCAVATION PROTECTION
LF 2,044.000 $2.500 $2.190
DRILL SHAFT (18 IN)
LF 120.000 $82.500 $265.000
DRILL SHAFT (30 IN)
LF 530.000 $250.000 $480.000
CL C CONC (ABUT)(HPC)
CY 51.000 $1,256.000 $2,265.000
REINF CONC SLAB
SF 3,401.000 $27.000 $51.000
APPROACH SLAB
CY 78.000 $650.000 $829.000
PRESTR CONC GIRDER (TX28)
LF 486.500 $251.000 $248.790
RIPRAP (CONC)(6 IN)
CY 196.000 $620.000 $761.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 291.000 $102.000 $234.000
RIPRAP (MOW STRIP)(4 IN)
CY 47.000 $538.250 $1,073.000
RAIL (TY T223)
LF 188.000 $150.000 $232.500
ARMOR JOINT (SEALED)
LF 92.000 $155.000 $150.000
CONC BOX CULV (3 FT X 2 FT)
LF 3,628.000 $253.000 $351.500
CONC BOX CULV (4 FT X 2 FT)
LF 1,824.000 $295.000 $364.000
CONC BOX CULV (5 FT X 2 FT)
LF 1,027.000 $415.000 $463.000
CONC BOX CULV (6 FT X 4 FT)
LF 88.000 $550.000 $802.000
CONC BOX CULV (8 FT X 3 FT)
LF 46.000 $700.000 $1,090.000
RC PIPE (CL III)(18 IN)
LF 4.000 $90.000 $142.000
RC PIPE (CL III)(24 IN)
LF 2,053.000 $95.000 $123.000
INLET (COMPL)(PSL)(SL)(4FTX5FT)
EA 2.000 $7,000.000 $6,836.000
INLET (COMPL)(PSL)(SL)(5FTX6FT)
EA 1.000 $8,500.000 $8,307.000
INLET (COMPL)(PSL)(SL)(8FTX8FT)
EA 2.000 $13,500.000 $16,855.000
INLET (COMPL)(PSL)(RC)(5FTX6FT)
EA 1.000 $9,500.000 $12,603.000
INLET (COMPL)(PSL)(RC)(6FTX6FT)
EA 3.000 $10,200.000 $11,671.000
WINGWALL (SW - 0) (HW=3 FT)
EA 4.000 $11,000.000 $7,064.000
SET (TY I)(S=10 FT)(HW=6FT)(3:1)(C)
EA 2.000 $9,500.000 $14,686.920
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 2.000 $6,800.000 $7,374.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 195.000 $7,000.000 $8,473.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 4.000 $7,100.000 $6,617.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
EA 80.000 $10,000.000 $9,522.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
EA 4.000 $10,700.000 $11,368.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 4.000 $12,000.000 $11,345.000
SET (TY I)(S= 8 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $8,000.000 $13,994.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000 $1,600.000 $881.000
SET (TY II) (18 IN) (RCP) (3: 1) (P)
EA 2.000 $1,600.000 $883.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 7.000 $1,800.000 $1,017.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 104.000 $1,900.000 $1,572.000
REMOV STR (INLET)
EA 1.000 $1,000.000 $250.000
REMOV STR (SET)
EA 94.000 $420.000 $87.000
REMOV STR (WINGWALL)
EA 36.000 $2,300.000 $378.000
REMOV STR (HEADWALL)
EA 18.000 $1,762.000 $713.000
REMOV STR (PIPE)
LF 5,280.000 $25.000 $8.500
REMOV STR (BOX CULVERT)
LF 110.000 $52.000 $74.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $70,000.000 $56,530.000
MOBILIZATION
LS 1.000 $1,410,000.000 $882,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $6,000.000 $1,275.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 51.000 $45.000 $28.000
ROCK FILTER DAMS (REMOVE)
LF 51.000 $12.000 $16.850
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 390.000 $50.000 $16.850
CONSTRUCTION EXITS (REMOVE)
SY 390.000 $11.000 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 17,160.000 $4.500 $2.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 17,160.000 $1.000 $1.250
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 870.000 $12.000 $17.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 11,300.000 $11.000 $17.850
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 4,100.000 $12.000 $2.750
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 770.000 $4.000 $13.750
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 10,440.000 $6.000 $11.650
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 3,120.000 $5.000 $2.350
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 870.000 $10.000 $17.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 11,300.000 $12.000 $20.500
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 4,100.000 $11.000 $2.750
PORT CTB CONNECT HARDWARE
EA 845.000 $83.000 $56.000
DRIVEWAYS (CONC)
SY 236.000 $80.000 $239.000
DRIVEWAYS (ACP)
SY 5,702.000 $24.000 $30.000
MTL W-BEAM GD FEN (TIM POST)
LF 488.000 $27.000 $28.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 4.000 $3,100.000 $1,918.000
REMOVE METAL BEAM GUARD FENCE
LF 292.000 $2.000 $5.650
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $215.000 $281.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,050.000 $3,594.000
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $256.000 $281.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,620.000 $3,476.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,035.000 $2,074.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $27,350.000 $33,645.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $505.000 $449.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 15.000 $310.000 $232.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 1.000 $377.000 $309.000
RELOCATE EXISTING MAILBOX
EA 103.000 $500.000 $154.750
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 71.000 $530.000 $583.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $690.000 $909.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $826.000 $1,077.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $900.000 $1,237.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,100.000 $1,247.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,020.000 $1,187.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
EA 23.000 $35.000 $32.500
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 7.000 $30.000 $28.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 32.000 $35.000 $185.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 76,830.000 $1.010 $0.620
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 44.000 $6.750 $4.490
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 86,948.000 $0.950 $0.630
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 229.000 $6.500 $7.850
PAVEMENT SEALER (RR XING)
EA 2.000 $15.000 $28.040
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 40,408.000 $0.550 $0.740
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 4,040.000 $0.650 $0.780
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 7,790.000 $0.600 $0.780
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $700.000 $807.430
REFL PAV MRKR TY II-A-A
EA 495.000 $5.500 $5.720
PAV SURF PREP FOR MRK (6")
LF 50,778.000 $0.050 $0.090
PAV SURF PREP FOR MRK (24")
LF 229.000 $0.100 $0.560
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $3,000.000 $3,625.000
FULL - WIDTH MOWING
CYC 8.000 $2,800.000 $2,800.000
LITTER REMOVAL
CYC 22.000 $1,400.000 $1,010.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 22.000 $950.000 $3,814.000
SP-D BALANCED MIX DESIGN
TON 15,014.000 $160.000 $164.850
TACK COAT
GAL 8,235.000 $4.270 $4.260
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 300.000 $70.000 $692.000
TMA (STATIONARY)
DAY 108.000 $210.000 $195.000
TMA (MOBILE OPERATION)
DAY 28.000 $120.000 $634.000
Totals: $15,413,289.350 $16,604,493.725