PREPARING ROW
|
STA
|
202.000
|
$2,000.000
|
$1,020.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
633.000
|
$10.900
|
$22.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
339.000
|
$12.500
|
$43.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
2,574.000
|
$3.500
|
$28.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
6,472.000
|
$5.500
|
$6.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
24,143.000
|
$6.500
|
$36.350
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,767.000
|
$15.000
|
$12.750
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
157.000
|
$60.000
|
$147.970
|
|
|
BACKFILL (TY A OR B)
|
STA
|
189.850
|
$200.000
|
$412.000
|
|
|
BLOCK SODDING
|
SY
|
81,365.000
|
$3.500
|
$4.800
|
|
|
STRAW OR HAY MULCH
|
SY
|
40,683.000
|
$0.250
|
$0.220
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
40,683.000
|
$0.200
|
$0.400
|
|
|
FERTILIZER
|
AC
|
16.810
|
$650.000
|
$841.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,017.000
|
$27.000
|
$36.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
|
SY
|
34,810.000
|
$30.000
|
$42.390
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
626.000
|
$300.000
|
$349.250
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
34,810.000
|
$4.190
|
$5.750
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
57,674.000
|
$2.900
|
$3.350
|
|
|
PAV JT UNDERSEAL (48")
|
LF
|
37,976.000
|
$28.000
|
$1.460
|
|
|
CEM STABIL BKFL
|
CY
|
7,551.000
|
$53.000
|
$62.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
491.000
|
$130.000
|
$13.850
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
80.000
|
$57.000
|
$62.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
19.000
|
$225.000
|
$350.250
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
2,044.000
|
$2.500
|
$2.190
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
120.000
|
$82.500
|
$265.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
530.000
|
$250.000
|
$480.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
51.000
|
$1,256.000
|
$2,265.000
|
|
|
REINF CONC SLAB
|
SF
|
3,401.000
|
$27.000
|
$51.000
|
|
|
APPROACH SLAB
|
CY
|
78.000
|
$650.000
|
$829.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
486.500
|
$251.000
|
$248.790
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
196.000
|
$620.000
|
$761.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
291.000
|
$102.000
|
$234.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
47.000
|
$538.250
|
$1,073.000
|
|
|
RAIL (TY T223)
|
LF
|
188.000
|
$150.000
|
$232.500
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
92.000
|
$155.000
|
$150.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
3,628.000
|
$253.000
|
$351.500
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
1,824.000
|
$295.000
|
$364.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
1,027.000
|
$415.000
|
$463.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
88.000
|
$550.000
|
$802.000
|
|
|
CONC BOX CULV (8 FT X 3 FT)
|
LF
|
46.000
|
$700.000
|
$1,090.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
4.000
|
$90.000
|
$142.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,053.000
|
$95.000
|
$123.000
|
|
|
INLET (COMPL)(PSL)(SL)(4FTX5FT)
|
EA
|
2.000
|
$7,000.000
|
$6,836.000
|
|
|
INLET (COMPL)(PSL)(SL)(5FTX6FT)
|
EA
|
1.000
|
$8,500.000
|
$8,307.000
|
|
|
INLET (COMPL)(PSL)(SL)(8FTX8FT)
|
EA
|
2.000
|
$13,500.000
|
$16,855.000
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX6FT)
|
EA
|
1.000
|
$9,500.000
|
$12,603.000
|
|
|
INLET (COMPL)(PSL)(RC)(6FTX6FT)
|
EA
|
3.000
|
$10,200.000
|
$11,671.000
|
|
|
WINGWALL (SW - 0) (HW=3 FT)
|
EA
|
4.000
|
$11,000.000
|
$7,064.000
|
|
|
SET (TY I)(S=10 FT)(HW=6FT)(3:1)(C)
|
EA
|
2.000
|
$9,500.000
|
$14,686.920
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
2.000
|
$6,800.000
|
$7,374.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
195.000
|
$7,000.000
|
$8,473.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
4.000
|
$7,100.000
|
$6,617.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
80.000
|
$10,000.000
|
$9,522.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
4.000
|
$10,700.000
|
$11,368.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
4.000
|
$12,000.000
|
$11,345.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$8,000.000
|
$13,994.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,600.000
|
$881.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (P)
|
EA
|
2.000
|
$1,600.000
|
$883.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
7.000
|
$1,800.000
|
$1,017.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
104.000
|
$1,900.000
|
$1,572.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,000.000
|
$250.000
|
|
|
REMOV STR (SET)
|
EA
|
94.000
|
$420.000
|
$87.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
36.000
|
$2,300.000
|
$378.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
18.000
|
$1,762.000
|
$713.000
|
|
|
REMOV STR (PIPE)
|
LF
|
5,280.000
|
$25.000
|
$8.500
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
110.000
|
$52.000
|
$74.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$70,000.000
|
$56,530.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,410,000.000
|
$882,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$6,000.000
|
$1,275.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
51.000
|
$45.000
|
$28.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
51.000
|
$12.000
|
$16.850
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
390.000
|
$50.000
|
$16.850
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
390.000
|
$11.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
17,160.000
|
$4.500
|
$2.800
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
17,160.000
|
$1.000
|
$1.250
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
870.000
|
$12.000
|
$17.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
11,300.000
|
$11.000
|
$17.850
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
4,100.000
|
$12.000
|
$2.750
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
770.000
|
$4.000
|
$13.750
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
10,440.000
|
$6.000
|
$11.650
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
3,120.000
|
$5.000
|
$2.350
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
870.000
|
$10.000
|
$17.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
11,300.000
|
$12.000
|
$20.500
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
4,100.000
|
$11.000
|
$2.750
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
845.000
|
$83.000
|
$56.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
236.000
|
$80.000
|
$239.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,702.000
|
$24.000
|
$30.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
488.000
|
$27.000
|
$28.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
4.000
|
$3,100.000
|
$1,918.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
292.000
|
$2.000
|
$5.650
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$215.000
|
$281.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$3,050.000
|
$3,594.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
14.000
|
$256.000
|
$281.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,620.000
|
$3,476.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,035.000
|
$2,074.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$27,350.000
|
$33,645.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$505.000
|
$449.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
15.000
|
$310.000
|
$232.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$377.000
|
$309.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
103.000
|
$500.000
|
$154.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
71.000
|
$530.000
|
$583.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$690.000
|
$909.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$826.000
|
$1,077.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$900.000
|
$1,237.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,100.000
|
$1,247.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,020.000
|
$1,187.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
|
EA
|
23.000
|
$35.000
|
$32.500
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
7.000
|
$30.000
|
$28.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
32.000
|
$35.000
|
$185.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
76,830.000
|
$1.010
|
$0.620
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
44.000
|
$6.750
|
$4.490
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
86,948.000
|
$0.950
|
$0.630
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
229.000
|
$6.500
|
$7.850
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
2.000
|
$15.000
|
$28.040
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
40,408.000
|
$0.550
|
$0.740
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
4,040.000
|
$0.650
|
$0.780
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
7,790.000
|
$0.600
|
$0.780
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
2.000
|
$700.000
|
$807.430
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
495.000
|
$5.500
|
$5.720
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
50,778.000
|
$0.050
|
$0.090
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
229.000
|
$0.100
|
$0.560
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$3,000.000
|
$3,625.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
8.000
|
$2,800.000
|
$2,800.000
|
|
|
LITTER REMOVAL
|
CYC
|
22.000
|
$1,400.000
|
$1,010.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
22.000
|
$950.000
|
$3,814.000
|
|
|
SP-D BALANCED MIX DESIGN
|
TON
|
15,014.000
|
$160.000
|
$164.850
|
|
|
TACK COAT
|
GAL
|
8,235.000
|
$4.270
|
$4.260
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
300.000
|
$70.000
|
$692.000
|
|
|
TMA (STATIONARY)
|
DAY
|
108.000
|
$210.000
|
$195.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
28.000
|
$120.000
|
$634.000
|
|
Totals: |
$15,413,289.350
|
$16,604,493.725
|