GALVESTON VARIOUS (0912-73-235)

Items: 38

County: GALVESTON
Length: 0.0000 MILES
Highway: VARIOUS
District: HOUSTON
Control Number: 0912-73-235
DBE Goal: 0.0%
Project: C 912-73-235
Guaranty: $18,000.00
Time: 45 WORKING DAYS
Engineer's Estimate: $916,947.24
Date: 02/05/2026 (4 months ago)
Contract Number: 2263231
Type: REPAIR ROADWAY
Project ID: A00201302
Project Description: REPAIR FAILURES IN CONCRETE PAVEMENT AND PARKING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
DAVID LAZARO
JOEL CLARKE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$916,947.24
$736,599.00
Over/Under Est: -19.67% -$180,348.24
Over/Under Est: -18.93% -$173,585.42
Amt Left: 0.92% $6,762.82
$747,747.00
Over/Under Est: -18.45% -$169,200.24
Amt Left: 1.51% $11,148.00
Delta: -0.59% -$4,385.18
Over/Under Est: -16.47% -$151,050.84
Amt Left: 3.98% $29,297.40
Delta: -2.43% -$18,149.40
Over/Under Est: -12.85% -$117,856.94
Amt Left: 8.48% $62,491.30
Delta: -4.33% -$33,193.90
Over/Under Est: -5.5% -$50,460.24
Amt Left: 17.63% $129,888.00
Delta: -8.43% -$67,396.70
Over/Under Est: 1.71% $15,664.68
Amt Left: 26.61% $196,012.92
Delta: -7.63% -$66,124.92
$1,340,714.00
Over/Under Est: 46.21% $423,766.76
Amt Left: 82.01% $604,115.00
Delta: -43.76% -$408,102.08
Subcontractor Percentage Amount
TRAFFIC SYSTEMS CONSTRUCTION, INC. 0.67% $4,935.21
Total: 0.67% $4,935.21

Bid Items & Bid Tabulations

38 Total 0 of 38
GALVESTON  |  VARIOUS  |  HOUSTON  |  0912-73-235  |  02/05/2026  |  $916,947.24  |  C 912-73-235  |  REPAIR ROADWAY  |  45 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CASTILLO ARANDA LLC
PROFESSIONAL TRAFFIC CONTROL LLC
MC2 CIVIL, LLC
GARRET SHIELDS INFRASTRUCTURE
MATAGORDA CONSTRUCTION & MATERIALS
ENVIRONMENTAL ALLIES, INC.
TI-ZACK CONCRETE, LLC
ICOS MANAGEMENT, LLC
TREE PROTECTION (INSTALL)
EA 17.000 $500.000 $250.000 $750.000 $700.000 $100.000 $200.000 $265.000 $1.100 $550.000
TREE PROTECTION (REMOVE)
EA 17.000 $100.000 $50.000 $300.000 $100.000 $100.000 $50.000 $75.000 $1.100 $550.000
REMOV CONC (PAV)
SY 3,684.000 $20.000 $20.000 $6.860 $6.000 $20.000 $14.000 $15.000 $10.830 $11.000
EXCAV (ROADWAY)
CY 586.000 $39.000 $15.000 $20.000 $65.000 $30.000 $50.000 $30.000 $68.090 $55.000
EXCAV (SPECIAL)
CY 120.000 $42.000 $30.000 $28.000 $100.000 $30.000 $30.000 $35.000 $66.500 $110.000
EMBANK (FNL)(DC)(TY C)
CY 22.000 $30.000 $20.000 $26.090 $50.000 $40.000 $187.000 $55.000 $36.270 $132.000
BLOCK SODDING
SY 538.000 $7.090 $6.000 $7.800 $9.500 $10.000 $7.000 $8.500 $11.000 $6.000
FERTILIZER
AC 0.130 $1,500.000 $2,500.000 $580.000 $8,500.000 $2,000.000 $5,000.000 $1,500.000 $495.000 $2,200.000
VEGETATIVE WATERING
TGL 0.160 $425.000 $100.000 $35.380 $3,000.000 $1,000.000 $3,000.000 $500.000 $1,100.000 $5,500.000
RDSIDE AMENITY (ADA PARKING SIGN)
EA 2.000 $500.000 $850.000 $500.000 $650.000 $700.000 $800.000 $700.000 $660.000 $1,100.000
RDSIDE AMENITY (WHEEL STOP)
EA 15.000 $307.000 $250.000 $300.000 $120.000 $100.000 $300.000 $200.000 $121.000 $550.000
CEM TRT(PLNT MX)(CL N)(TY E)(GR 4)(6")
SY 3,684.000 $20.000 $35.000 $20.700 $25.000 $15.000 $44.000 $45.000 $16.000 $88.000
CONC PVMT (CRCP) (7")
SY 3,684.000 $110.000 $70.000 $99.860 $89.000 $100.000 $84.500 $115.000 $135.730 $165.000
STRUCT EXCAV
CY 136.000 $49.000 $20.000 $28.000 $30.000 $40.000 $30.000 $50.000 $75.000 $66.000
CEM STABIL BKFL
CY 100.000 $70.000 $90.000 $200.000 $60.000 $300.000 $150.000 $95.000 $165.000 $264.000
RC PIPE (CL III)(15 IN)
LF 250.000 $80.000 $85.000 $75.000 $90.000 $80.000 $75.000 $65.000 $118.000 $121.000
RC PIPE (CL III)(18 IN)
LF 264.000 $120.000 $125.000 $102.000 $90.000 $80.000 $100.000 $105.000 $164.000 $132.000
RC PIPE (CL III)(24 IN)
LF 43.000 $150.000 $140.000 $150.000 $130.000 $150.000 $200.000 $195.000 $224.000 $143.000
INLET (COMPL)(TY AZ)(HOU)
EA 6.000 $4,500.000 $6,500.000 $6,278.850 $4,600.000 $5,000.000 $10,000.000 $6,000.000 $8,450.000 $6,600.000
PIPE (PVC) (SCH 80) (3 IN)
LF 24.000 $10.000 $50.000 $15.860 $140.000 $25.000 $44.000 $90.000 $85.000 $110.000
REMOV STR (INLET)
EA 2.000 $1,042.000 $500.000 $800.000 $600.000 $2,000.000 $1,500.000 $775.000 $1,995.000 $2,200.000
REMOV STR (PIPE)
LF 242.000 $30.000 $20.000 $13.860 $50.000 $20.000 $35.000 $21.000 $58.000 $22.000
MOBILIZATION
LS 1.000 $92,556.360 $55,000.000 $56,000.000 $75,000.000 $50,000.000 $18,000.000 $25,000.000 $42,446.400 $66,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $11,886.000 $10,000.000 $4,000.000 $2,000.000 $5,000.000 $3,106.000 $1,250.000 $1,100.000 $1.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 67.000 $32.000 $30.000 $53.000 $40.000 $20.000 $37.000 $23.000 $11.000 $11.000
CONSTRUCTION EXITS (REMOVE)
SY 67.000 $10.000 $10.000 $29.000 $15.000 $1.000 $15.000 $8.500 $1.100 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,478.000 $5.000 $5.000 $5.300 $2.500 $5.000 $6.000 $3.000 $1.100 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,478.000 $5.000 $2.000 $2.000 $0.500 $1.000 $0.850 $1.500 $1.100 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 60.000 $10.000 $8.000 $5.390 $13.000 $5.000 $12.000 $9.000 $5.500 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 60.000 $4.000 $2.000 $2.000 $6.000 $1.000 $1.000 $4.500 $11.000 $2.000
CONC CURB (SLOTTED)
LF 490.000 $30.000 $8.000 $35.000 $20.000 $40.000 $35.000 $30.000 $63.400 $66.000
REMOVE AND INSTALL EXISTING GATE
EA 2.000 $1,644.000 $5,500.000 $700.000 $6,000.000 $1,000.000 $5,000.000 $1,200.000 $1,650.000 $2,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $300.000 $550.000 $750.000 $825.000 $800.000 $500.000 $850.000 $825.550 $1,320.000
REMOVE SM RD SN SUP&AM
EA 3.000 $100.000 $200.000 $130.000 $100.000 $100.000 $150.000 $130.000 $110.000 $550.000
RE PM TY III (Y)(4")(SLD)
LF 698.000 $1.270 $5.000 $2.000 $5.000 $8.000 $2.000 $5.000 $4.400 $7.000
PAVEMENT SLER 4"
LF 698.000 $24.000 $8.000 $0.380 $1.000 $0.300 $1.500 $1.500 $1.100 $2.000
PAV SURF PREP FOR MRK (4")
LF 698.000 $23.000 $5.000 $0.400 $0.500 $1.000 $1.500 $0.750 $0.550 $1.000
VEH LP DETECT (SAWCUT)
LF 276.000 $29.000 $10.000 $14.000 $20.000 $20.000 $8.000 $25.000 $13.200 $22.000
Totals: $916,947.240 $736,599.000 $743,361.821 $747,747.000 $765,896.400 $799,090.300 $866,487.000 $932,611.920 $1,340,714.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $5,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $2,000.00
Total: $7,000.00