PREPARING ROW
|
STA
|
179.300
|
$10,000.000
|
$92,000.000
|
$109,000.000
|
$45,000.000
|
$15,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
329,429.000
|
$5.900
|
$5.000
|
$7.000
|
$6.000
|
$4.570
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,437.000
|
$6.000
|
$7.000
|
$5.000
|
$6.000
|
$10.760
|
|
|
REMOVING CONC (CTB)
|
LF
|
18,006.000
|
$9.000
|
$10.000
|
$6.000
|
$10.000
|
$10.460
|
|
|
REMOVING CONC (HEADWALL)
|
CY
|
94.500
|
$380.000
|
$500.000
|
$250.000
|
$180.000
|
$150.060
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-22")
|
SY
|
456,177.000
|
$3.000
|
$3.000
|
$2.000
|
$4.650
|
$5.800
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
231,805.000
|
$8.000
|
$10.000
|
$8.000
|
$6.000
|
$5.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
61,286.000
|
$7.000
|
$7.000
|
$12.000
|
$10.000
|
$10.540
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
438,208.000
|
$6.000
|
$7.000
|
$9.000
|
$6.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
5,554.000
|
$10.000
|
$10.000
|
$10.000
|
$20.000
|
$20.950
|
|
|
EMB(FNL)(DC)(TYC)(CSBE)(RWALL FND IMPR)
|
CY
|
2,999.950
|
$39.000
|
$35.000
|
$45.000
|
$35.000
|
$60.000
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
77,284.510
|
$36.000
|
$35.000
|
$45.000
|
$20.000
|
$70.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
146,195.000
|
$1.080
|
$1.000
|
$1.000
|
$0.790
|
$2.750
|
|
|
BLOCK SODDING
|
SY
|
94,093.000
|
$3.000
|
$3.500
|
$2.500
|
$3.100
|
$2.950
|
|
|
STRAW OR HAY MULCH
|
SY
|
239,378.500
|
$0.250
|
$0.200
|
$0.150
|
$0.220
|
$0.210
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
93,183.500
|
$0.120
|
$0.150
|
$0.100
|
$0.090
|
$0.090
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
146,195.000
|
$0.100
|
$0.150
|
$0.200
|
$0.210
|
$0.200
|
|
|
FERTILIZER
|
AC
|
75.677
|
$550.000
|
$850.000
|
$650.000
|
$653.360
|
$622.380
|
|
|
VEGETATIVE WATERING
|
MG
|
9,039.300
|
$10.000
|
$20.000
|
$5.000
|
$18.980
|
$20.830
|
|
|
IRRIGATION SYSTEM (TY I)
|
LS
|
1.000
|
$10,000.000
|
$20,000.000
|
$250,000.000
|
$46,928.010
|
$112,200.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
561,594.000
|
$1.950
|
$1.500
|
$2.000
|
$2.950
|
$2.490
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
7,611.000
|
$163.000
|
$170.000
|
$160.000
|
$172.000
|
$225.700
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
554,886.000
|
$7.000
|
$4.000
|
$4.500
|
$7.750
|
$10.260
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
4,417.000
|
$65.000
|
$80.000
|
$75.000
|
$87.380
|
$83.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
30,545.000
|
$72.000
|
$69.000
|
$75.000
|
$86.330
|
$82.000
|
|
|
SALV,HAUL& STKPL RCL APH PV(VAR DEPTH)
|
SY
|
437,257.000
|
$2.000
|
$3.000
|
$2.000
|
$3.140
|
$2.810
|
|
|
D-GR HMA(SQ) TY-D SAC-B PG70-22
|
TON
|
1,082.000
|
$90.000
|
$95.000
|
$90.000
|
$109.500
|
$104.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
207,049.000
|
$35.000
|
$20.000
|
$44.000
|
$52.000
|
$86.170
|
|
|
CONC PVMT (CONT REINF - CRCP) (14")
|
SY
|
300,043.000
|
$35.000
|
$40.000
|
$65.000
|
$78.000
|
$92.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(12")
|
SY
|
25,125.000
|
$85.000
|
$81.000
|
$82.000
|
$95.000
|
$120.980
|
|
|
STRUCT EXCAV
|
CY
|
2,999.950
|
$6.500
|
$7.000
|
$6.000
|
$10.000
|
$20.000
|
|
|
CEM STABIL BKFL
|
CY
|
37,922.000
|
$41.000
|
$36.850
|
$40.000
|
$47.000
|
$51.870
|
|
|
CUT & RESTORING PAV
|
SY
|
94.000
|
$91.800
|
$257.000
|
$100.000
|
$190.000
|
$188.350
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
3,520.000
|
$41.000
|
$36.850
|
$35.000
|
$47.000
|
$51.870
|
|
|
FLOWABLE BACKFILL
|
CY
|
65.000
|
$215.000
|
$258.950
|
$125.000
|
$190.000
|
$246.420
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
46,986.000
|
$1.800
|
$1.850
|
$1.000
|
$5.000
|
$1.130
|
|
|
TEMPORARY SPL SHORING
|
SF
|
52,257.090
|
$5.000
|
$15.000
|
$25.000
|
$15.000
|
$25.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
1,400.000
|
$130.000
|
$150.000
|
$200.000
|
$100.000
|
$144.690
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
8,908.000
|
$150.000
|
$200.000
|
$200.000
|
$145.000
|
$180.900
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
16,442.000
|
$200.000
|
$250.000
|
$225.000
|
$190.000
|
$231.120
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
2,670.000
|
$375.000
|
$350.000
|
$500.000
|
$330.000
|
$471.190
|
|
|
DRILL SHAFT (84 IN)
|
LF
|
228.000
|
$800.000
|
$650.000
|
$900.000
|
$660.000
|
$681.640
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
35.000
|
$50.000
|
$52.000
|
$125.000
|
$114.420
|
$62.600
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
67.000
|
$165.000
|
$115.000
|
$150.000
|
$393.200
|
$138.440
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
1,872.000
|
$350.000
|
$300.000
|
$325.000
|
$272.940
|
$380.380
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
702.000
|
$500.000
|
$558.000
|
$510.000
|
$585.770
|
$757.070
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
140.000
|
$300.000
|
$223.000
|
$200.000
|
$234.100
|
$445.530
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
220.000
|
$400.000
|
$442.000
|
$400.000
|
$464.000
|
$617.030
|
|
|
DRILL SHAFT (SIGN MTS) (60 IN)
|
LF
|
320.000
|
$400.000
|
$350.000
|
$400.000
|
$740.090
|
$444.410
|
|
|
DRILL SHAFT (NON-REINFORCED) (36 IN)
|
LF
|
339,440.000
|
$60.000
|
$50.000
|
$85.000
|
$106.120
|
$96.980
|
|
|
CL C CONC (ABUT)
|
CY
|
759.800
|
$817.000
|
$900.000
|
$700.000
|
$600.000
|
$1,026.430
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
20.600
|
$1,110.390
|
$1,900.000
|
$700.000
|
$1,100.000
|
$1,318.600
|
|
|
CL C CONC (CAP)
|
CY
|
20.400
|
$825.000
|
$1,300.000
|
$1,100.000
|
$1,200.000
|
$1,861.890
|
|
|
CL C CONC (COLUMN)
|
CY
|
1,028.800
|
$805.000
|
$800.000
|
$900.000
|
$1,200.000
|
$1,185.630
|
|
|
CL C CONC (FOOTING)
|
CY
|
1,376.600
|
$800.000
|
$600.000
|
$700.000
|
$600.000
|
$753.130
|
|
|
CL C CONC (FOOTING)(MASS)
|
CY
|
232.800
|
$750.000
|
$800.000
|
$700.000
|
$650.000
|
$1,532.140
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
618.450
|
$800.000
|
$800.000
|
$820.000
|
$1,200.000
|
$1,492.700
|
|
|
CL F CONC (CAP)
|
CY
|
2,568.400
|
$714.000
|
$600.000
|
$825.000
|
$880.000
|
$1,165.540
|
|
|
CL C CONC (SIGN FOOTING)
|
CY
|
174.800
|
$1,033.000
|
$1,000.000
|
$500.000
|
$650.000
|
$805.710
|
|
|
CL A CONC (DITCH INTERCEPTOR STRUCTURE)
|
EA
|
41.000
|
$4,500.000
|
$3,317.000
|
$2,000.000
|
$700.000
|
$3,392.780
|
|
|
REINF CONC SLAB
|
SF
|
243,857.000
|
$12.000
|
$10.000
|
$13.000
|
$13.750
|
$21.650
|
|
|
REINF CONC SLAB (EXTEND SLAB)
|
SF
|
5,787.000
|
$22.000
|
$25.000
|
$15.000
|
$24.000
|
$23.900
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
56,463.000
|
$11.000
|
$10.000
|
$12.000
|
$19.000
|
$12.020
|
|
|
RETAINING WALL (MSE) (WAVE SCHEME)
|
SF
|
246,016.890
|
$34.000
|
$30.000
|
$36.000
|
$42.000
|
$37.740
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
925.500
|
$105.000
|
$90.000
|
$135.000
|
$130.000
|
$181.800
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
19,493.000
|
$115.000
|
$100.000
|
$135.000
|
$135.000
|
$160.000
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
12,294.820
|
$140.000
|
$130.000
|
$150.000
|
$150.000
|
$216.040
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
224.400
|
$300.000
|
$450.000
|
$300.000
|
$500.000
|
$389.840
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1,118.000
|
$420.000
|
$450.000
|
$325.000
|
$500.000
|
$617.880
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
110.000
|
$430.000
|
$450.000
|
$325.000
|
$500.000
|
$594.800
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
1,009.000
|
$420.000
|
$450.000
|
$300.000
|
$500.000
|
$556.240
|
|
|
RIPRAP (CONC) (CL B) (6")
|
CY
|
116.800
|
$425.000
|
$450.000
|
$300.000
|
$500.000
|
$528.120
|
|
|
RAIL (TY SSTR)
|
LF
|
20,411.000
|
$35.000
|
$35.000
|
$45.000
|
$45.250
|
$100.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
15,774.000
|
$39.000
|
$35.000
|
$45.000
|
$50.360
|
$100.000
|
|
|
RAIL (TY PR11)
|
LF
|
576.000
|
$100.000
|
$100.000
|
$80.000
|
$85.000
|
$87.410
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
1,680.000
|
$84.000
|
$100.000
|
$60.000
|
$75.000
|
$125.480
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
72.000
|
$82.000
|
$50.000
|
$150.000
|
$190.000
|
$115.160
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
229.000
|
$80.000
|
$82.600
|
$72.000
|
$60.000
|
$139.300
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
1,822.000
|
$160.000
|
$250.600
|
$195.000
|
$265.000
|
$281.370
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
2,201.000
|
$200.000
|
$260.150
|
$211.000
|
$290.000
|
$321.050
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
2,759.000
|
$138.000
|
$260.700
|
$201.000
|
$300.000
|
$346.910
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
3,814.000
|
$215.000
|
$289.550
|
$225.000
|
$325.000
|
$366.590
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
1,595.000
|
$236.000
|
$367.650
|
$255.000
|
$425.000
|
$549.100
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
1,579.000
|
$240.000
|
$354.350
|
$260.000
|
$395.000
|
$400.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
40.000
|
$250.000
|
$387.550
|
$315.000
|
$445.000
|
$593.650
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
755.000
|
$300.000
|
$432.750
|
$350.000
|
$480.000
|
$645.730
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
1,800.000
|
$305.000
|
$478.750
|
$350.000
|
$560.000
|
$621.350
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
2,029.000
|
$325.000
|
$516.700
|
$375.000
|
$590.000
|
$874.650
|
|
|
CONC BOX CULV (7 FT X 5 FT)
|
LF
|
998.000
|
$350.000
|
$637.300
|
$450.000
|
$720.000
|
$751.780
|
|
|
CONC BOX CULV (7 FT X 6 FT)
|
LF
|
469.000
|
$490.000
|
$689.500
|
$460.000
|
$775.000
|
$807.020
|
|
|
CONC BOX CULV (9 FT X 6 FT)
|
LF
|
1,281.000
|
$900.000
|
$853.850
|
$700.000
|
$980.000
|
$1,312.290
|
|
|
CONC BOX CULV (10 FT X 8 FT)
|
LF
|
864.000
|
$920.000
|
$1,107.600
|
$770.000
|
$1,400.000
|
$1,799.090
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
15,780.000
|
$60.000
|
$82.350
|
$60.000
|
$70.000
|
$78.700
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
15,595.000
|
$72.000
|
$88.650
|
$70.000
|
$85.000
|
$88.810
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
5,871.000
|
$80.000
|
$102.500
|
$90.000
|
$105.000
|
$103.260
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
5,161.000
|
$100.000
|
$130.500
|
$110.000
|
$143.000
|
$154.450
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
462.000
|
$130.000
|
$161.000
|
$175.000
|
$195.000
|
$227.930
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
274.000
|
$160.000
|
$195.050
|
$200.000
|
$230.000
|
$267.120
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
11.000
|
$3,300.000
|
$3,522.000
|
$3,500.000
|
$3,500.000
|
$4,393.640
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
12.000
|
$4,520.000
|
$3,975.000
|
$4,500.000
|
$3,400.000
|
$4,208.540
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
9.000
|
$5,900.000
|
$4,846.000
|
$7,500.000
|
$3,700.000
|
$5,083.730
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
5.000
|
$2,930.000
|
$2,395.000
|
$3,500.000
|
$2,700.000
|
$3,666.030
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
3.000
|
$4,010.000
|
$2,840.000
|
$4,000.000
|
$3,000.000
|
$3,985.160
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
9.000
|
$7,500.000
|
$7,594.000
|
$6,800.000
|
$7,900.000
|
$9,537.930
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
6.000
|
$13,875.000
|
$11,138.000
|
$11,000.000
|
$11,500.000
|
$16,782.490
|
|
|
INLET (COMPL)(POD)(FG)(3FTX3FT)
|
EA
|
2.000
|
$5,120.000
|
$5,063.000
|
$5,800.000
|
$4,100.000
|
$4,463.850
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
1.000
|
$3,175.000
|
$2,811.000
|
$4,000.000
|
$3,000.000
|
$3,953.250
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
6.000
|
$3,835.000
|
$3,499.000
|
$3,700.000
|
$3,400.000
|
$4,368.110
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX5FT)
|
EA
|
2.000
|
$4,825.000
|
$4,903.000
|
$4,700.000
|
$4,200.000
|
$5,229.760
|
|
|
INLET (COMPL)(PSL)(RC)(8FTX8FT)
|
EA
|
7.000
|
$11,370.000
|
$14,249.000
|
$11,000.000
|
$12,500.000
|
$13,980.410
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
33.000
|
$4,815.000
|
$4,624.000
|
$5,000.000
|
$4,600.000
|
$5,606.340
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
39.000
|
$3,500.000
|
$2,817.000
|
$3,000.000
|
$3,000.000
|
$3,959.620
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
9.000
|
$5,185.000
|
$4,555.000
|
$4,400.000
|
$4,700.000
|
$4,527.680
|
|
|
INLET (COMPL)(TY AZR2G)
|
EA
|
46.000
|
$7,500.000
|
$9,252.000
|
$7,000.000
|
$10,500.000
|
$5,597.530
|
|
|
INLET (COMPL)(CURB)(TY C1)
|
EA
|
213.000
|
$4,365.000
|
$5,135.000
|
$4,500.000
|
$4,500.000
|
$5,551.910
|
|
|
INLET (COMPL)(TY AZ2G)
|
EA
|
132.000
|
$7,000.000
|
$7,253.000
|
$6,500.000
|
$7,400.000
|
$6,685.000
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
3.000
|
$25,000.000
|
$23,321.000
|
$25,500.000
|
$26,000.000
|
$19,398.930
|
|
|
INLET (COMPL) (EXT) (TY CI)
|
EA
|
99.000
|
$1,265.000
|
$816.000
|
$1,500.000
|
$825.000
|
$2,801.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$7,000.000
|
$11,944.000
|
$6,750.000
|
$4,700.000
|
$6,523.770
|
|
|
WINGWALL (PW - 1) (HW=13 FT)
|
EA
|
2.000
|
$45,145.000
|
$60,241.000
|
$60,000.000
|
$50,000.000
|
$48,687.690
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$11,550.000
|
$25,019.000
|
$15,000.000
|
$16,500.000
|
$25,472.370
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$18,430.000
|
$24,208.000
|
$21,000.000
|
$24,000.000
|
$23,793.910
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
3.000
|
$20,310.000
|
$44,673.000
|
$27,500.000
|
$35,000.000
|
$31,028.990
|
|
|
WINGWALL (SW - 0) (HW=4 FT)
|
EA
|
2.000
|
$5,000.000
|
$15,830.000
|
$5,000.000
|
$9,100.000
|
$10,899.810
|
|
|
WINGWALL (SW - 0) (HW=6 FT)
|
EA
|
1.000
|
$7,000.000
|
$30,326.000
|
$10,000.000
|
$18,000.000
|
$12,870.370
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1) (P)
|
EA
|
2.000
|
$3,850.000
|
$5,804.000
|
$3,400.000
|
$5,400.000
|
$4,138.320
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (P)
|
EA
|
3.000
|
$7,500.000
|
$10,908.000
|
$9,000.000
|
$8,900.000
|
$13,991.590
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$8,000.000
|
$11,418.000
|
$11,000.000
|
$11,500.000
|
$22,171.560
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,085.000
|
$721.000
|
$1,175.000
|
$900.000
|
$1,166.710
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,060.000
|
$885.000
|
$1,300.000
|
$1,100.000
|
$1,326.660
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
43.000
|
$1,335.000
|
$1,140.000
|
$1,500.000
|
$1,200.000
|
$1,569.220
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,460.000
|
$1,406.000
|
$2,350.000
|
$1,400.000
|
$2,325.990
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,475.000
|
$1,711.000
|
$3,800.000
|
$1,500.000
|
$2,558.080
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$3,620.000
|
$2,712.000
|
$3,800.000
|
$2,700.000
|
$2,558.080
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
24.000
|
$3,815.000
|
$3,659.000
|
$4,500.000
|
$3,500.000
|
$3,457.990
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
2.000
|
$2,200.000
|
$3,500.000
|
$2,700.000
|
$1,600.000
|
$3,149.670
|
|
|
PIPE (PVC) (SCH 40) (8 IN)
|
LF
|
100.000
|
$42.000
|
$55.000
|
$40.000
|
$95.000
|
$72.150
|
|
|
REMOV STR (INLET)
|
EA
|
58.000
|
$600.000
|
$247.000
|
$600.000
|
$550.000
|
$621.670
|
|
|
REMOV STR (MANHOLE)
|
EA
|
66.000
|
$550.000
|
$262.000
|
$550.000
|
$550.000
|
$621.560
|
|
|
REMOV STR (SET)
|
EA
|
47.000
|
$365.000
|
$139.000
|
$375.000
|
$300.000
|
$621.330
|
|
|
REMOV STR (PIPE)
|
LF
|
24,445.000
|
$17.500
|
$16.050
|
$15.000
|
$15.000
|
$19.990
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
4,388.000
|
$50.000
|
$89.050
|
$30.000
|
$30.000
|
$55.630
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
3.000
|
$125,000.000
|
$25,000.000
|
$121,000.000
|
$175,000.000
|
$289,289.270
|
|
|
REMOV STR (RET WALL)
|
LF
|
2,430.000
|
$35.000
|
$50.000
|
$45.000
|
$85.000
|
$167.900
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$13,100,000.000
|
$17,989,879.000
|
$19,062,944.000
|
$20,750,000.000
|
$22,075,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
59.000
|
$15,000.000
|
$15,000.000
|
$10,000.000
|
$15,000.000
|
$25,953.850
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
2,798.000
|
$60.000
|
$29.000
|
$22.000
|
$50.000
|
$71.490
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
2,798.000
|
$10.000
|
$9.000
|
$7.000
|
$5.000
|
$21.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
44,404.000
|
$2.500
|
$3.000
|
$2.500
|
$2.250
|
$1.990
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
44,404.000
|
$0.850
|
$1.000
|
$1.000
|
$0.250
|
$0.400
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
20,525.000
|
$5.250
|
$4.000
|
$3.500
|
$2.500
|
$2.140
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
20,525.000
|
$1.000
|
$1.000
|
$1.000
|
$0.250
|
$0.400
|
|
|
CONSTRUCTING DETOURS
|
SY
|
56,467.000
|
$55.000
|
$70.000
|
$75.000
|
$85.080
|
$65.550
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
29,432.000
|
$36.000
|
$35.000
|
$59.000
|
$89.710
|
$101.080
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
5,265.000
|
$33.000
|
$35.000
|
$59.000
|
$82.880
|
$93.970
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
140.000
|
$38.000
|
$35.000
|
$65.000
|
$76.920
|
$94.270
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
20,000.000
|
$8.000
|
$5.000
|
$9.000
|
$7.000
|
$8.640
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
72,622.000
|
$5.500
|
$3.000
|
$5.000
|
$6.000
|
$8.460
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
71,790.000
|
$4.850
|
$3.000
|
$5.000
|
$6.000
|
$6.480
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,540.000
|
$4.800
|
$3.000
|
$5.000
|
$10.000
|
$6.480
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
49,432.000
|
$6.500
|
$4.000
|
$10.000
|
$6.000
|
$8.640
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
5,265.000
|
$6.400
|
$4.000
|
$7.000
|
$7.500
|
$8.640
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
140.000
|
$7.300
|
$4.000
|
$5.000
|
$7.500
|
$12.230
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
1,920.000
|
$55.000
|
$50.000
|
$11.000
|
$24.000
|
$31.910
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
767.000
|
$37.210
|
$40.000
|
$65.000
|
$65.000
|
$73.500
|
|
|
PERM CTB (SGL SLOPE) (TY 2) (42 )
|
LF
|
16,516.000
|
$50.000
|
$40.000
|
$125.000
|
$64.000
|
$84.560
|
|
|
LANDSCAPE PAVERS
|
SY
|
12,430.000
|
$55.000
|
$55.000
|
$41.000
|
$58.300
|
$63.830
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
86,507.000
|
$5.500
|
$5.000
|
$5.000
|
$4.500
|
$3.120
|
|
|
CONC CURB (U-TURN)
|
LF
|
2,503.000
|
$35.000
|
$35.000
|
$35.000
|
$46.000
|
$37.860
|
|
|
DRIVEWAYS (CONC)
|
SY
|
10,049.000
|
$65.000
|
$70.000
|
$64.000
|
$77.000
|
$83.630
|
|
|
CONC SIDEWALKS (5")
|
SY
|
17,428.000
|
$55.000
|
$60.000
|
$50.000
|
$66.000
|
$61.720
|
|
|
CURB RAMPS (TY 1)
|
EA
|
15.000
|
$1,400.000
|
$1,600.000
|
$1,400.000
|
$2,100.000
|
$3,320.110
|
|
|
CURB RAMPS (TY 7)
|
EA
|
56.000
|
$1,350.000
|
$1,600.000
|
$1,530.000
|
$2,100.000
|
$1,917.060
|
|
|
CURB RAMPS (TY 21)
|
EA
|
8.000
|
$2,200.000
|
$1,600.000
|
$1,900.000
|
$2,200.000
|
$2,349.310
|
|
|
CURB RAMPS (TY 22)
|
EA
|
4.000
|
$2,500.000
|
$3,100.000
|
$3,700.000
|
$2,500.000
|
$4,035.180
|
|
|
CONC MEDIAN
|
SY
|
8,572.000
|
$56.000
|
$70.000
|
$57.000
|
$60.000
|
$77.960
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
12,629.000
|
$3.200
|
$4.500
|
$2.000
|
$1.060
|
$2.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
10.000
|
$2,900.000
|
$1,990.000
|
$275.000
|
$899.790
|
$1,990.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$1,050.000
|
$760.000
|
$1,250.000
|
$852.140
|
$760.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
18.000
|
$23,000.000
|
$25,100.000
|
$24,000.000
|
$21,968.550
|
$25,100.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
|
EA
|
10.000
|
$2,076.000
|
$25,100.000
|
$25,000.000
|
$7,279.530
|
$25,100.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
6.000
|
$250.000
|
$165.000
|
$200.000
|
$202.630
|
$165.000
|
|
|
REMOVE RD IL ASM (CTB MOUNT)
|
EA
|
28.000
|
$455.000
|
$363.000
|
$365.000
|
$381.070
|
$460.920
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
12.000
|
$300.000
|
$244.000
|
$250.000
|
$256.140
|
$295.840
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
36.000
|
$990.000
|
$2,392.000
|
$900.000
|
$936.390
|
$1,101.780
|
|
|
HI MST IL POLE (150 FT)(100 MPH)
|
EA
|
18.000
|
$34,000.000
|
$30,767.000
|
$30,250.000
|
$31,773.300
|
$33,707.280
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
23,160.000
|
$8.500
|
$7.750
|
$8.000
|
$8.140
|
$10.950
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
14,508.000
|
$8.000
|
$6.550
|
$7.000
|
$6.880
|
$7.780
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
6,938.000
|
$15.000
|
$10.550
|
$11.000
|
$11.080
|
$14.340
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
1,235.000
|
$14.000
|
$8.100
|
$9.000
|
$8.500
|
$11.860
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
17,495.000
|
$22.000
|
$18.400
|
$19.000
|
$19.320
|
$28.020
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
920.000
|
$19.580
|
$9.350
|
$10.000
|
$9.820
|
$13.200
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
505.000
|
$35.000
|
$24.700
|
$25.000
|
$25.930
|
$25.350
|
|
|
CONDT (RM) (3/4")
|
LF
|
1,446.000
|
$14.000
|
$16.650
|
$17.000
|
$17.480
|
$12.880
|
|
|
CONDT (RM) (2")
|
LF
|
966.000
|
$26.000
|
$20.100
|
$21.000
|
$21.100
|
$17.760
|
|
|
CONDT (RM) (3")
|
LF
|
4,450.000
|
$46.000
|
$19.600
|
$50.000
|
$20.580
|
$28.470
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
38,280.000
|
$0.920
|
$0.750
|
$1.000
|
$0.790
|
$0.830
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
1,497.000
|
$1.000
|
$0.850
|
$1.000
|
$0.890
|
$0.890
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
2,994.000
|
$1.000
|
$0.850
|
$1.000
|
$0.890
|
$0.890
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
11,262.000
|
$1.100
|
$1.050
|
$1.150
|
$1.100
|
$1.010
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
26,700.000
|
$1.600
|
$1.100
|
$1.150
|
$1.150
|
$1.070
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
6,785.000
|
$1.540
|
$1.450
|
$1.500
|
$1.520
|
$1.220
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
320.000
|
$1.400
|
$1.500
|
$1.500
|
$1.570
|
$1.300
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
3,160.000
|
$1.700
|
$2.050
|
$2.000
|
$2.150
|
$1.470
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
4,150.000
|
$1.850
|
$2.200
|
$2.250
|
$2.310
|
$1.610
|
|
|
ELEC CONDR (NO.3) BARE
|
LF
|
160.000
|
$2.000
|
$2.750
|
$3.000
|
$2.890
|
$2.150
|
|
|
ELEC CONDR (NO.3) INSULATED
|
LF
|
320.000
|
$2.150
|
$2.250
|
$2.500
|
$2.360
|
$2.150
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
4,720.000
|
$2.400
|
$2.150
|
$2.500
|
$2.260
|
$1.970
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
12,745.000
|
$2.590
|
$2.200
|
$2.500
|
$2.310
|
$2.030
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
8,590.000
|
$2.000
|
$2.050
|
$2.250
|
$2.150
|
$1.720
|
|
|
GROUND BOX TY A (122311)
|
EA
|
9.000
|
$630.000
|
$701.000
|
$700.000
|
$735.890
|
$366.150
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
154.000
|
$1,010.000
|
$955.650
|
$955.000
|
$1,003.210
|
$810.120
|
|
|
REMOVE GROUND BOX
|
EA
|
12.000
|
$250.000
|
$245.000
|
$245.000
|
$257.190
|
$193.270
|
|
|
ZINC-COAT STL WIRE STRAND (5/16")
|
LF
|
540.000
|
$3.820
|
$3.200
|
$3.500
|
$3.360
|
$2.510
|
|
|
TIMBER POLE (CL 2) 50 FT
|
EA
|
12.000
|
$1,740.000
|
$1,581.250
|
$1,600.000
|
$1,659.940
|
$1,325.100
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
5.000
|
$525.000
|
$788.750
|
$500.000
|
$513.070
|
$257.700
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
|
EA
|
6.000
|
$6,550.000
|
$5,577.250
|
$5,075.000
|
$5,556.140
|
$5,187.910
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
3.000
|
$5,000.000
|
$5,378.680
|
$5,000.000
|
$5,347.860
|
$4,276.170
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(U)
|
EA
|
2.000
|
$3,500.000
|
$5,610.600
|
$5,250.000
|
$5,592.210
|
$7,209.930
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
|
EA
|
7.000
|
$4,100.000
|
$4,541.100
|
$4,050.000
|
$4,468.110
|
$3,457.010
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
679.250
|
$25.000
|
$21.000
|
$21.000
|
$26.170
|
$25.280
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
2,801.250
|
$25.000
|
$22.400
|
$25.000
|
$23.510
|
$22.050
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
77.000
|
$530.000
|
$430.000
|
$500.000
|
$511.780
|
$517.630
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
20.000
|
$585.000
|
$465.000
|
$525.000
|
$553.430
|
$559.760
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
96.000
|
$600.000
|
$545.000
|
$600.000
|
$648.650
|
$656.070
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
10.000
|
$690.000
|
$660.000
|
$750.000
|
$785.520
|
$794.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
7.000
|
$510.000
|
$600.000
|
$675.000
|
$714.110
|
$722.280
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
12.000
|
$850.000
|
$675.000
|
$750.000
|
$803.370
|
$812.560
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
9.000
|
$758.000
|
$780.000
|
$860.000
|
$928.340
|
$938.960
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
7.000
|
$835.000
|
$825.000
|
$910.000
|
$981.900
|
$993.130
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
5.000
|
$725.000
|
$790.000
|
$875.000
|
$940.240
|
$951.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
2.000
|
$815.000
|
$735.000
|
$810.000
|
$874.780
|
$884.790
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
8.000
|
$2,030.000
|
$1,460.000
|
$1,600.000
|
$1,737.660
|
$1,757.540
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
4.000
|
$1,930.000
|
$1,500.000
|
$1,650.000
|
$1,785.270
|
$1,805.690
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
4,406.170
|
$5.200
|
$3.850
|
$5.000
|
$5.180
|
$4.630
|
|
|
REMOVE LRSA
|
EA
|
12.000
|
$1,025.000
|
$1,500.000
|
$575.000
|
$848.470
|
$601.900
|
|
|
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
|
EA
|
12.000
|
$13,350.000
|
$14,194.000
|
$14,200.000
|
$14,900.390
|
$12,082.230
|
|
|
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
|
EA
|
2.000
|
$15,720.000
|
$18,378.000
|
$18,400.000
|
$19,292.620
|
$14,359.970
|
|
|
INS OH SN SUP(190 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$105,197.000
|
$142,819.000
|
$150,000.000
|
$149,926.680
|
$130,582.710
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
6.000
|
$8,970.000
|
$10,414.000
|
$5,500.000
|
$5,683.440
|
$3,779.220
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
480.000
|
$20.000
|
$18.000
|
$20.000
|
$18.900
|
$18.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
225.000
|
$17.000
|
$18.500
|
$20.000
|
$19.420
|
$18.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
84,256.000
|
$0.200
|
$0.250
|
$0.250
|
$0.260
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
400.000
|
$0.330
|
$0.800
|
$0.380
|
$0.840
|
$0.800
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
77,545.000
|
$0.180
|
$0.200
|
$0.220
|
$0.210
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
81,582.000
|
$0.180
|
$0.250
|
$0.250
|
$0.260
|
$0.250
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
LF
|
174,516.000
|
$0.750
|
$1.600
|
$1.600
|
$1.680
|
$1.600
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
89,325.000
|
$0.720
|
$0.850
|
$0.850
|
$0.890
|
$0.850
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
1,511.000
|
$0.800
|
$3.000
|
$3.000
|
$3.150
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
88,560.000
|
$0.580
|
$0.800
|
$0.800
|
$0.840
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
412.000
|
$1.560
|
$1.400
|
$1.500
|
$1.470
|
$1.400
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
83,535.000
|
$0.560
|
$0.800
|
$0.800
|
$0.840
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (Y)8"(SLD)
|
LF
|
565.000
|
$0.890
|
$1.300
|
$1.400
|
$1.360
|
$1.300
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
2,367.000
|
$1.350
|
$1.000
|
$1.250
|
$1.050
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
41.000
|
$205.000
|
$195.000
|
$195.000
|
$204.700
|
$195.280
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
39.000
|
$313.000
|
$400.000
|
$400.000
|
$419.910
|
$400.580
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
4.000
|
$350.000
|
$350.000
|
$350.000
|
$367.420
|
$350.510
|
|
PREFAB PAV MRK TY C (W) (U-LT ARROW)
|
EA
|
7.000
|
$270.000
|
$450.000
|
$45.000
|
$472.400
|
$450.660
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
6.000
|
$150.000
|
$350.000
|
$350.000
|
$367.420
|
$350.510
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
45.000
|
$270.000
|
$250.000
|
$250.000
|
$262.440
|
$250.370
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
99.000
|
$35.000
|
$45.000
|
$45.000
|
$47.240
|
$45.070
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
323.000
|
$3.500
|
$4.000
|
$4.000
|
$4.200
|
$4.010
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,965.000
|
$3.500
|
$4.000
|
$4.000
|
$4.200
|
$4.010
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
211,439.000
|
$0.330
|
$0.250
|
$0.250
|
$0.260
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
506,677.000
|
$0.120
|
$0.010
|
$0.100
|
$0.010
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
120,955.000
|
$0.030
|
$0.020
|
$0.150
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
29,988.000
|
$0.130
|
$0.040
|
$0.200
|
$0.040
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (10")
|
LF
|
26,894.000
|
$0.160
|
$0.100
|
$0.250
|
$0.100
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
16,195.000
|
$0.300
|
$0.120
|
$0.250
|
$0.130
|
$0.120
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,671.000
|
$1.000
|
$0.240
|
$1.000
|
$0.250
|
$0.240
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
41.000
|
$15.000
|
$3.000
|
$3.000
|
$3.150
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
39.000
|
$20.000
|
$5.000
|
$5.000
|
$5.250
|
$5.010
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
4.000
|
$23.000
|
$5.000
|
$5.000
|
$5.250
|
$5.010
|
|
|
PAV SURF PREP FOR MRK (U/LT ARROW)
|
EA
|
7.000
|
$13.000
|
$5.000
|
$5.000
|
$5.250
|
$5.010
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
6.000
|
$11.000
|
$5.000
|
$5.000
|
$5.250
|
$5.010
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
45.000
|
$20.000
|
$7.000
|
$7.000
|
$7.350
|
$7.010
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
99.000
|
$8.000
|
$1.000
|
$1.000
|
$1.050
|
$1.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
5.000
|
$31,500.000
|
$31,373.000
|
$31,375.000
|
$32,934.340
|
$22,752.010
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
3.000
|
$3,800.000
|
$4,943.000
|
$2,500.000
|
$2,564.580
|
$2,272.500
|
|
|
TEMP TRAF SIGNALS
|
EA
|
3.000
|
$46,000.000
|
$40,106.000
|
$40,150.000
|
$42,101.960
|
$28,665.460
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
56.000
|
$300.000
|
$224.250
|
$250.000
|
$235.410
|
$190.150
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
17.000
|
$300.000
|
$224.250
|
$250.000
|
$235.410
|
$190.150
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
56.000
|
$300.000
|
$224.250
|
$255.000
|
$235.410
|
$190.150
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
17.000
|
$300.000
|
$224.250
|
$230.000
|
$235.410
|
$190.150
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
56.000
|
$300.000
|
$224.250
|
$250.000
|
$235.410
|
$190.150
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
34.000
|
$300.000
|
$224.250
|
$250.000
|
$235.410
|
$190.150
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
48.000
|
$545.000
|
$403.950
|
$400.000
|
$424.050
|
$393.290
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
56.000
|
$90.000
|
$43.700
|
$45.000
|
$45.870
|
$82.640
|
|
|
BACK PLATE (12")(4 SEC)
|
EA
|
17.000
|
$100.000
|
$50.600
|
$50.000
|
$53.120
|
$85.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
14,145.000
|
$1.500
|
$1.450
|
$2.000
|
$1.520
|
$1.290
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
14,405.000
|
$1.750
|
$1.600
|
$2.000
|
$1.680
|
$1.360
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
14,300.000
|
$2.000
|
$2.250
|
$2.500
|
$2.360
|
$1.890
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')
|
EA
|
2.000
|
$6,000.000
|
$8,277.000
|
$8,300.000
|
$8,688.920
|
$8,474.440
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
2.000
|
$8,200.000
|
$9,653.000
|
$10,000.000
|
$10,133.400
|
$10,030.030
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
2.000
|
$9,000.000
|
$10,624.000
|
$12,000.000
|
$11,152.730
|
$11,166.190
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
4.000
|
$10,000.000
|
$11,021.000
|
$11,500.000
|
$11,569.480
|
$11,434.240
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')
|
EA
|
1.000
|
$8,700.000
|
$17,266.000
|
$20,000.000
|
$18,125.280
|
$18,009.590
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM
|
EA
|
1.000
|
$20,000.000
|
$19,389.000
|
$20,000.000
|
$20,353.930
|
$20,187.890
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')
|
EA
|
1.000
|
$17,000.000
|
$18,230.000
|
$18,500.000
|
$19,137.250
|
$18,999.620
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
1.000
|
$21,500.000
|
$20,242.000
|
$20,250.000
|
$21,249.380
|
$21,063.460
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
1.000
|
$22,000.000
|
$20,815.000
|
$21,000.000
|
$21,850.900
|
$21,985.700
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM
|
EA
|
1.000
|
$23,000.000
|
$21,298.000
|
$22,000.000
|
$22,357.940
|
$22,482.490
|
|
|
INS TRF SIG PL AM(S)2 ARM(55-32')LUM
|
EA
|
1.000
|
$30,000.000
|
$24,369.000
|
$25,000.000
|
$25,581.770
|
$24,799.180
|
|
|
INS TRF SIG PL AM(S)2 ARM(60-32')LUM
|
EA
|
1.000
|
$21,000.000
|
$23,977.000
|
$25,000.000
|
$25,170.260
|
$25,397.450
|
|
|
INS TRF SIG PL AM(S)2 ARM(65-28')LUM
|
EA
|
1.000
|
$26,000.000
|
$24,275.000
|
$25,000.000
|
$25,483.100
|
$24,702.420
|
|
|
INS TRF SIG PL AM(S)2 ARM(65-32')LUM
|
EA
|
1.000
|
$29,000.000
|
$23,647.000
|
$25,000.000
|
$24,823.840
|
$25,061.140
|
|
|
PED POLE ASSEMBLY
|
EA
|
48.000
|
$1,700.000
|
$1,421.000
|
$1,500.000
|
$1,491.720
|
$2,709.030
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
48.000
|
$720.000
|
$620.000
|
$650.000
|
$650.860
|
$618.430
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
9.000
|
$3,100.000
|
$3,529.000
|
$3,500.000
|
$3,704.630
|
$2,564.590
|
|
|
FULL - WIDTH MOWING
|
CYC
|
15.000
|
$1,700.000
|
$2,400.000
|
$1,500.000
|
$5,000.000
|
$3,316.380
|
|
|
LITTER REMOVAL
|
CYC
|
59.000
|
$1,400.000
|
$2,000.000
|
$80.000
|
$2,600.000
|
$4,181.820
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
59.000
|
$1,000.000
|
$3,000.000
|
$1,875.000
|
$1,800.000
|
$3,136.360
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
CYC
|
59.000
|
$900.000
|
$4,000.000
|
$2,500.000
|
$3,800.000
|
$4,181.820
|
|
|
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
|
CY
|
884.000
|
$110.000
|
$100.000
|
$55.000
|
$200.000
|
$111.170
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
1,034.000
|
$253.500
|
$200.000
|
$320.000
|
$500.000
|
$1,486.090
|
|
|
SOUND WALL (WAVE SCHEME)(14 FT)
|
LF
|
638.000
|
$505.000
|
$350.000
|
$650.000
|
$489.450
|
$498.620
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
120.000
|
$150.000
|
$187.000
|
$200.000
|
$250.000
|
$100.000
|
|
|
VIVDS PROCESSOR SYSTEM
|
EA
|
3.000
|
$8,000.000
|
$11,408.000
|
$12,000.000
|
$11,975.740
|
$9,094.550
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
|
LF
|
12,940.000
|
$2.200
|
$2.250
|
$2.250
|
$2.360
|
$4.150
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(36 FIBER)
|
LF
|
27,980.000
|
$2.400
|
$2.850
|
$3.000
|
$2.990
|
$4.500
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
|
LF
|
19,590.000
|
$3.850
|
$3.950
|
$4.000
|
$4.150
|
$5.760
|
|
|
FIBER OPTIC PATCH PANEL (144 POSITION)
|
EA
|
6.000
|
$4,700.000
|
$725.000
|
$725.000
|
$761.080
|
$6,032.540
|
|
|
CCTV FIELD EQUIPMENT (ANALOG)
|
EA
|
5.000
|
$9,328.000
|
$7,271.000
|
$8,000.000
|
$7,632.860
|
$7,254.540
|
|
|
REMOVE CCTV FIELD EQUIPMENT
|
EA
|
1.000
|
$1,200.000
|
$1,466.000
|
$1,500.000
|
$1,538.960
|
$506.640
|
|
|
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
|
LF
|
23,940.000
|
$12.000
|
$10.900
|
$11.000
|
$11.440
|
$15.840
|
|
|
ITS MULTI-DUCT CND (PVC-80)
|
LF
|
18,200.000
|
$14.500
|
$17.550
|
$18.000
|
$18.420
|
$12.750
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
21,380.000
|
$30.000
|
$53.850
|
$55.000
|
$56.530
|
$29.610
|
|
|
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
|
LF
|
26,894.000
|
$9.500
|
$9.250
|
$10.000
|
$9.710
|
$9.260
|
|
|
CONDUIT (PREPARE)
|
LF
|
4,610.000
|
$1.360
|
$1.350
|
$1.500
|
$1.420
|
$9.790
|
|
|
CTMS RELOCATION (CCTV)
|
EA
|
4.000
|
$3,552.000
|
$4,743.000
|
$4,750.000
|
$4,979.050
|
$8,291.400
|
|
|
CTMS RELOCATION (HUB BLDG)
|
EA
|
6.000
|
$11,503.000
|
$6,929.000
|
$7,000.000
|
$7,273.840
|
$6,987.400
|
|
|
FIBER OPTIC VIDEO DATA TRANSMITTER
|
EA
|
6.000
|
$1,433.000
|
$1,370.000
|
$1,400.000
|
$1,438.180
|
$1,037.870
|
|
|
FIBER OPTIC VIDEO DATA RECEIVER
|
EA
|
7.000
|
$1,439.460
|
$1,347.000
|
$1,400.000
|
$1,414.040
|
$1,037.870
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
42,310.000
|
$0.550
|
$0.600
|
$0.500
|
$0.630
|
$0.600
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
14,053.000
|
$0.560
|
$0.650
|
$0.650
|
$0.680
|
$0.650
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
671.000
|
$1.060
|
$1.250
|
$1.400
|
$1.310
|
$1.250
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
29,988.000
|
$0.900
|
$1.200
|
$1.000
|
$1.260
|
$1.200
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
11,478.000
|
$2.150
|
$2.600
|
$2.500
|
$2.730
|
$2.600
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
1,988.000
|
$2.150
|
$3.000
|
$3.000
|
$3.150
|
$3.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
2,946.000
|
$5.650
|
$6.000
|
$1.000
|
$6.300
|
$6.010
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
49,867.000
|
$0.550
|
$0.650
|
$1.000
|
$0.680
|
$0.650
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
362.000
|
$5.700
|
$3.500
|
$3.500
|
$3.670
|
$3.510
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
14,053.000
|
$0.600
|
$0.700
|
$0.750
|
$0.730
|
$0.700
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
5.000
|
$7,000.000
|
$6,049.000
|
$6,050.000
|
$6,350.040
|
$6,061.430
|
|
|
GPS COMMUNICATIONS UNIT
|
EA
|
5.000
|
$850.000
|
$977.000
|
$1,000.000
|
$1,025.620
|
$859.220
|
|
|
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
|
EA
|
1.000
|
$3,825.000
|
$3,691.000
|
$3,700.000
|
$3,874.690
|
$3,134.550
|
|
|
ITS POLE (55 FT)(110 MPH)
|
EA
|
5.000
|
$14,636.000
|
$23,722.000
|
$24,000.000
|
$24,902.570
|
$19,584.330
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)
|
EA
|
2.000
|
$5,000.000
|
$7,767.000
|
$7,800.000
|
$8,153.540
|
$6,340.980
|
|
|
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
|
EA
|
18.000
|
$28,000.000
|
$24,331.000
|
$25,000.000
|
$25,541.880
|
$26,229.090
|
|
|
TMA (STATIONARY)
|
DAY
|
176.000
|
$150.000
|
$353.000
|
$350.000
|
$547.260
|
$250.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
141.000
|
$2,800.000
|
$3,113.000
|
$3,150.000
|
$3,267.920
|
$2,594.840
|
|
|
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
|
EA
|
24.000
|
$1,200.000
|
$162.000
|
$175.000
|
$170.060
|
$917.670
|
|
|
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
|
EA
|
16.000
|
$1,200.000
|
$183.000
|
$200.000
|
$192.110
|
$1,327.410
|
|
|
SANITARY SEWER (8IN) (PVC) (C900)
|
LF
|
148.000
|
$72.000
|
$77.700
|
$60.000
|
$85.210
|
$98.520
|
|
|
SANITARY SEWER (12IN) (PVC) (C900)
|
LF
|
168.000
|
$170.000
|
$123.150
|
$80.000
|
$114.800
|
$162.870
|
|
|
SANITARY SEWER (18 IN) (PVC) (C900)
|
LF
|
572.000
|
$223.000
|
$213.150
|
$120.000
|
$190.430
|
$167.990
|
|
|
CASING (STEEL) (SANITARY SEWER) (30 IN)
|
LF
|
70.000
|
$250.000
|
$479.500
|
$400.000
|
$154.730
|
$225.180
|
|
|
MANHOLES (SAN SEWER) (TY 1)
|
EA
|
8.000
|
$5,800.000
|
$6,671.000
|
$6,000.000
|
$7,128.240
|
$4,237.910
|
|
|
MANHOLE (SAN SEWER) (TY IV)
|
EA
|
1.000
|
$15,000.000
|
$13,106.000
|
$6,500.000
|
$20,902.030
|
$14,014.050
|
|
|
ADJUSTING MANHOLE (SANITARY SEWER)
|
EA
|
8.000
|
$1,664.000
|
$2,096.000
|
$1,000.000
|
$1,366.310
|
$1,539.450
|
|
|
JCK BOR OR TUN CSNG(STL)(SAN SWR)(30IN)
|
LF
|
282.000
|
$420.000
|
$787.700
|
$380.000
|
$747.800
|
$699.070
|
|
|
REMOVE EXISTING MANHOLE(SANITARY SEWER)
|
EA
|
8.000
|
$1,410.000
|
$317.000
|
$500.000
|
$363.810
|
$695.770
|
|
|
ABAND/FILL EXIST SAN SEWER PIPE (6")
|
LF
|
148.000
|
$20.000
|
$5.100
|
$10.000
|
$5.370
|
$4.390
|
|
|
SANITARY SEWER LATERAL (6")(PVC)
|
LF
|
20.000
|
$27.750
|
$63.500
|
$125.000
|
$143.400
|
$126.630
|
|
|
REMOVE EXIST SAN SWR PIPE (10")
|
LF
|
40.000
|
$15.000
|
$26.500
|
$10.000
|
$45.870
|
$23.560
|
|
|
REMOVE EXIST SAN SWR PIPE (12")
|
LF
|
170.000
|
$20.000
|
$26.500
|
$12.000
|
$53.970
|
$14.720
|
|
|
ABAND/FILL EXIST SAN SWR PIPE (10IN)
|
LF
|
457.000
|
$26.000
|
$5.200
|
$16.000
|
$5.560
|
$21.850
|
|
|
ABAND/FILL EXIST SAN SWR PIPE (18IN)
|
LF
|
352.000
|
$35.000
|
$12.350
|
$20.000
|
$15.170
|
$35.910
|
|
|
JCK BOR OR TUN SAN SWR (DI) (12 IN)
|
LF
|
244.000
|
$250.000
|
$240.050
|
$25.000
|
$165.460
|
$281.230
|
|
|
WATER MAIN PIPE (PVC)(12IN)(DR18)(C900)
|
LF
|
1,903.000
|
$125.000
|
$118.400
|
$115.000
|
$136.680
|
$149.870
|
|
|
FIRE HYDRANT BRANCH (LEAD) (6IN)
|
LF
|
32.000
|
$59.000
|
$100.000
|
$56.000
|
$111.650
|
$383.080
|
|
|
JCK TUN BOR OR AUG WTR MAIN (DI) (12IN)
|
LF
|
216.000
|
$250.000
|
$317.200
|
$60.000
|
$148.040
|
$683.190
|
|
|
JCK TUN BOR OR AUG CSG (STL) (16IN)
|
LF
|
513.000
|
$280.000
|
$644.700
|
$70.000
|
$602.130
|
$387.030
|
|
|
JCK TUN BOR OR AUG CSG (STL) (18IN)
|
LF
|
508.000
|
$300.000
|
$649.200
|
$90.000
|
$649.000
|
$755.100
|
|
|
JCK TUN BOR OR AUG CSG (STL) (24IN)
|
LF
|
923.000
|
$450.000
|
$729.200
|
$150.000
|
$697.860
|
$936.030
|
|
|
SERVICE LINE (SHORT SIDE) (5/8" TO 1")
|
EA
|
3.000
|
$1,000.000
|
$1,234.200
|
$1,100.000
|
$1,150.520
|
$2,036.580
|
|
|
SERVICE LINE (LONG SIDE) (5/8" TO 1")
|
EA
|
3.000
|
$1,800.000
|
$2,704.750
|
$2,000.000
|
$1,603.660
|
$2,056.910
|
|
|
SERVICE LINE (SHORT SIDE) (1-1/2"TO 2")
|
EA
|
3.000
|
$1,640.000
|
$1,716.100
|
$2,000.000
|
$1,656.820
|
$2,056.910
|
|
|
TAPPING SLEEVE AND VALVE (12IN X 8IN)
|
EA
|
1.000
|
$6,500.000
|
$6,905.000
|
$5,500.000
|
$8,261.530
|
$10,158.470
|
|
|
TAPPING SLEEVE AND VALVE (12IN X 12IN)
|
EA
|
1.000
|
$6,800.000
|
$7,654.000
|
$6,500.000
|
$11,722.410
|
$10,796.730
|
|
|
FIRE HYDRANT ASSEMBLY
|
EA
|
6.000
|
$5,360.000
|
$7,259.000
|
$5,000.000
|
$5,761.460
|
$4,761.400
|
|
|
REMOVING FIRE HYDRANT
|
EA
|
6.000
|
$413.000
|
$310.000
|
$1,000.000
|
$321.270
|
$779.880
|
|
|
REMOVING WATER VALVE AND BOX
|
EA
|
13.000
|
$255.000
|
$155.000
|
$500.000
|
$107.090
|
$389.940
|
|
|
CUT AND PLUG WATER MAIN (6IN)
|
EA
|
7.000
|
$1,990.000
|
$985.000
|
$1,500.000
|
$458.990
|
$1,109.500
|
|
|
CUT AND PLUG WATER MAIN (8IN)
|
EA
|
4.000
|
$2,200.000
|
$1,058.000
|
$1,700.000
|
$524.520
|
$467.140
|
|
|
CUT AND PLUG WATER MAIN (10IN)
|
EA
|
5.000
|
$1,500.000
|
$1,890.000
|
$2,000.000
|
$557.890
|
$576.440
|
|
|
CUT AND PLUG WATER MAIN (12IN)
|
EA
|
8.000
|
$1,562.000
|
$1,972.000
|
$2,250.000
|
$623.410
|
$627.790
|
|
|
WET CONNECTION (6IN)
|
EA
|
6.000
|
$1,400.000
|
$2,680.000
|
$2,000.000
|
$3,946.580
|
$2,639.720
|
|
|
WET CONNECTION (8IN)
|
EA
|
3.000
|
$1,700.000
|
$2,774.000
|
$2,200.000
|
$3,987.080
|
$3,003.610
|
|
|
WET CONNECTION (10IN)
|
EA
|
5.000
|
$2,400.000
|
$3,714.000
|
$2,400.000
|
$4,101.440
|
$2,944.580
|
|
|
WET CONNECTION (12IN)
|
EA
|
7.000
|
$2,481.000
|
$3,910.000
|
$2,500.000
|
$4,231.300
|
$3,062.040
|
|
|
ASBESTOS ABATEMENT SUPT & COORDINATION
|
LS
|
1.000
|
$5,000.000
|
$50,000.000
|
$25,000.000
|
$129,356.290
|
$5,000.000
|
|
|
TAPPING SLEEVE & VALVE (10 IN X 6 IN)
|
EA
|
1.000
|
$5,000.000
|
$5,958.000
|
$6,500.000
|
$7,291.610
|
$9,834.680
|
|
|
WTR MAIN PIPE(PVC)(6 IN)(DR 18) (C900)
|
LF
|
843.000
|
$110.000
|
$72.700
|
$80.000
|
$107.190
|
$80.860
|
|
|
WTR MAIN PIPE(PVC)(8 IN)(DR 18) (C900)
|
LF
|
603.000
|
$115.000
|
$75.850
|
$100.000
|
$104.270
|
$76.970
|
|
|
WTR MAIN PIPE(PVC)(10 IN)(DR 18) (C900)
|
LF
|
129.000
|
$120.000
|
$135.650
|
$120.000
|
$284.410
|
$94.560
|
|
|
JCK TUN BOR OR AUG WTR MAIN(DI) (10 IN)
|
LF
|
1,604.000
|
$230.000
|
$182.700
|
$110.000
|
$105.530
|
$326.010
|
|
Totals: |
$147,513,606.058
|
$165,825,007.000
|
$197,995,615.665
|
$211,258,240.364
|
$243,651,856.046
|