Show Job Controls
Bid Cobra

GALVESTON SH 146 (0389-06-108)

Items: 48

County: GALVESTON
Length: N/A
Highway: SH 146
District: HOUSTON
Control Number: 0389-06-108
DBE Goal: N/A
Project: NH 2019(023)
Guaranty: N/A
Time: 75 WORKING DAYS
Engineer's Estimate: $2,647,165.09
Date: 09/07/2018 (7 years ago)
Contract Number: N/A
Type: BASE REP, MILL, SC, O/L & LOOP DETECTORS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,647,165.09
$2,397,517.52
Over/Under Est: -9.43% -$249,647.57
Over/Under Est: -6.93% -$183,412.99
Amt Left: 2.76% $66,234.58

Bid Items & Bid Tabulations

48 Total 0 of 48
GALVESTON  |  SH 146  |  HOUSTON  |  0389-06-108  |  09/07/2018  |  $2,647,165.09  |  NH 2019(023)  |  BASE REP, MILL, SC, O/L & LOOP DETEC...  |  75 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURWOOD GREENE CONSTRUCTION CO.
ANGEL BROTHERS HOLDINGS CORP.
BACKFILL (TY A OR B)
STA 139.000 $150.000 $100.000 $155.000
SALV,HAUL & STKPL RCL APH PV (2")
SY 127,770.000 $1.320 $1.000 $1.500
SALV,HAUL&STKPL RCL APH PV(0 TO 1 1/2")
SY 792.000 $2.000 $5.000 $10.000
ASPH (MULTI OPTION)
GAL 51,612.000 $2.550 $2.700 $2.700
AGGR(TY-PB GR-4 SAC-B)
CY 1,291.000 $90.500 $100.000 $103.700
D-GR HMA(SQ) TY-D SAC-A PG70-22
TON 100.000 $65.000 $175.000 $165.000
TOM (ASPHALT) PG 76-22
TON 979.000 $170.820 $115.000 $111.000
TOM-C (AGGREGATE) SAC-A
TON 6,550.000 $110.500 $115.000 $111.000
TOM - F (AGGREGATE) SAC - A
TON 6,529.000 $115.060 $115.000 $111.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 1,258.400 $48.000 $50.000 $51.000
MOBILIZATION
LS 1.000 $304,000.000 $50,000.000 $112,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $5,500.000 $2,700.000 $1,100.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 60.000 $7.500 $35.000 $35.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 660.000 $5.000 $5.000 $5.750
PORT CTB CONNECT HARDWARE
EA 3.000 $78.500 $300.000 $100.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,650.000 $2,300.000 $2,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,143.000 $1,200.000 $1,500.000
MTL BM GD FEN TRANS (NON - SYM)
EA 7.000 $905.000 $1,400.000 $860.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $5.000 $3.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $400.000 $200.000 $580.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,350.000 $2,750.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $255.000 $250.000 $390.000
CRASH CUSHION ATTEN (INSTALL)(REACT)(N)
EA 1.000 $1,599.100 $25,000.000 $26,750.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 575.000 $22.500 $22.500 $17.500
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 19,320.000 $0.150 $0.160 $0.170
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 83,274.000 $0.150 $0.160 $0.170
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,641.000 $0.320 $0.250 $0.260
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 552.000 $2.000 $1.000 $1.100
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 153.000 $55.500 $35.000 $37.500
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 54.000 $60.000 $35.000 $37.500
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 18,420.000 $0.150 $0.160 $0.170
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 81,528.000 $0.150 $0.160 $0.170
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 1,386.000 $4.000 $1.000 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,547.000 $0.850 $0.650 $0.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 184.000 $5.250 $10.000 $11.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 51.000 $105.500 $99.000 $105.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 18.000 $125.500 $125.000 $135.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 462.000 $3.750 $6.000 $6.400
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 6,740.000 $0.500 $0.450 $0.500
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 27,758.000 $0.450 $0.650 $0.700
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 6,140.000 $0.600 $0.650 $0.700
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 27,176.000 $0.550 $0.650 $0.700
REFL PAV MRKR TY II-A-A
EA 674.000 $3.750 $5.000 $5.350
REFL PAV MRKR TY II-C-R
EA 756.000 $3.500 $5.000 $5.350
VEH LP DETECT (SAWCUT)
LF 800.000 $10.250 $11.000 $10.450
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 150.000 $25.000 $80.000 $10.000
TMA (STATIONARY)
DAY 8.000 $175.000 $1,000.000 $250.000
TMA (MOBILE OPERATION)
HR 71.000 $18.500 $60.000 $55.000
Totals: $2,647,165.090 $2,397,517.520 $2,463,752.100