Show Job Controls
Bid Cobra

GALVESTON SH 87 (0367-02-075)

Items: 77

County: GALVESTON
Length: N/A
Highway: SH 87
District: HOUSTON
Control Number: 0367-02-075
DBE Goal: N/A
Project: NH 1802(203)
Guaranty: N/A
Time: 244 WORKING DAYS
Engineer's Estimate: $18,260,225.16
Date: 05/02/2018 (8 years ago)
Contract Number: N/A
Type: REHABILITATION AND RAISING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$18,260,225.16
$20,817,021.42
Over/Under Est: 14% $2,556,796.26
Over/Under Est: 30.67% $5,601,078.41
Amt Left: 14.62% $3,044,282.15
Over/Under Est: 56.07% $10,238,003.31
Amt Left: 36.9% $7,681,207.05
Delta: -19.43% -$4,636,924.90

Bid Items & Bid Tabulations

77 Total 0 of 77
GALVESTON  |  SH 87  |  HOUSTON  |  0367-02-075  |  05/02/2018  |  $18,260,225.16  |  NH 1802(203)  |  REHAB AND RAISING ROADWAY  |  244 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
OLDCASTLE MATERIALS TEXAS, INC.
ANGEL BROTHERS HOLDINGS CORP.
DURWOOD GREENE CONSTRUCTION CO.
REMOVING STAB BASE & ASPH PAV (1.5")
SY 4,111.780 $2.000 $4.000 $4.500 $2.000
EXCAVATION (ROADWAY)
CY 323.580 $10.000 $12.000 $20.000 $50.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 167.000 $30.000 $24.000 $17.500 $80.000
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 24,650.000 $45.000 $6.000 $17.000 $24.000
BACKFILL TY A
CY 1,682.000 $50.000 $28.000 $75.000 $110.000
BLADING
HR 433.780 $80.000 $110.000 $95.000 $90.000
BLOCK SODDING
SY 131,910.000 $3.000 $3.000 $3.250 $3.000
STRAW OR HAY MULCH
SY 131,910.000 $0.200 $0.140 $0.150 $0.160
BROADCAST SEED (TEMP) (WARM)
SY 131,910.000 $0.150 $0.150 $0.130 $0.190
FERTILIZER
AC 54.900 $650.000 $710.000 $775.000 $625.000
VEGETATIVE WATERING
MG 6,541.000 $20.000 $14.000 $8.000 $25.000
LIME TRT (EXST MATL) (6")
SY 8,737.000 $2.500 $3.000 $4.000 $15.000
LIME (HYD, COM, OR QK(SLURRY))
TON 118.000 $160.000 $170.000 $175.000 $200.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 8,737.000 $18.000 $14.000 $18.000 $38.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 225,163.600 $40.000 $60.000 $67.000 $80.000
D-GR HMA TY-D SAC-A PG70-22
TON 17,297.530 $80.000 $77.000 $84.000 $92.000
D-GR HMA TY-D SAC-B PG70-22
TON 917.600 $75.000 $105.000 $100.000 $160.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 1,226.000 $8.000 $3.600 $6.000 $8.000
STRUCT EXCAV (BOX)
CY 128.470 $15.000 $25.500 $60.000 $100.000
STRUCT EXCAV (PIPE)
CY 4.990 $10.000 $225.000 $60.000 $100.000
CEM STABIL BKFL
CY 83.000 $50.000 $122.000 $95.000 $150.000
RIPRAP (CONC)(4 IN)
CY 8.870 $250.000 $560.000 $850.000 $1,500.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 13,933.000 $154.000 $125.000 $150.000 $230.000
RIPRAP (MOW STRIP)(4 IN)
CY 2.080 $500.000 $660.000 $1,150.000 $2,400.000
BEDDING MATERIAL (VARIABLE)
CY 5,313.000 $121.000 $93.000 $115.000 $130.000
CONC BOX CULV (10 FT X 3 FT)(EXTEND)
LF 37.500 $450.000 $1,220.000 $1,250.000 $3,000.000
RC PIPE (CL III)(24 IN)
LF 87.000 $125.000 $122.000 $170.000 $170.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 3.000 $3,000.000 $4,050.000 $6,000.000 $6,500.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $16,000.000 $10,100.000 $10,500.000 $22,000.000
MOBILIZATION
LS 1.000 $1,351,210.750 $1,145,000.000 $1,450,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $5,000.000 $3,200.000 $2,650.000 $5,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 684.000 $20.000 $33.000 $40.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 684.000 $10.000 $7.100 $10.000 $32.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 900.000 $30.000 $35.000 $40.000 $38.000
CONSTRUCTION EXITS (REMOVE)
SY 900.000 $10.000 $8.100 $10.000 $18.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,250.000 $5.000 $2.700 $2.000 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,250.000 $1.000 $1.000 $0.750 $0.850
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 2,920.000 $35.000 $27.000 $50.000 $75.000
DRIVEWAYS (BASE)
SY 11,122.200 $40.000 $51.000 $44.000 $25.000
RUMBLE STRIPS (SHOULDER)
LF 75,804.000 $0.350 $0.480 $0.200 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 1,619.000 $19.000 $21.000 $27.000 $35.000
REMOVE METAL BEAM GUARD FENCE
LF 2,120.000 $3.500 $2.500 $2.500 $25.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,300.000 $2,140.000 $3,000.000 $2,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 68.000 $427.000 $330.000 $500.000 $470.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $450.000 $560.000 $700.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $675.000 $640.000 $900.000 $875.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $775.000 $620.000 $900.000 $875.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 36.000 $460.000 $300.000 $500.000 $475.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $535.000 $400.000 $600.000 $750.000
REMOVE SM RD SN SUP&AM
EA 34.000 $92.000 $76.000 $90.000 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 6.000 $60.000 $45.000 $60.000 $70.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 65.000 $27.000 $27.000 $40.000 $30.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 338,108.000 $0.650 $0.440 $0.500 $0.350
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 329,842.000 $0.650 $0.440 $0.500 $0.350
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,005.000 $1.500 $1.000 $1.100 $0.850
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 630.000 $6.000 $6.100 $6.750 $5.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 81,250.000 $0.430 $0.430 $0.450 $0.600
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 13,270.000 $0.500 $0.420 $0.450 $0.650
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 34,440.000 $0.430 $0.420 $0.450 $0.600
PREFAB PAV MRK TY C (W) (ARROW)
EA 142.000 $226.000 $86.000 $95.000 $265.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $286.000 $91.000 $100.000 $300.000
REFL PAV MRKR TY I-C
EA 37.000 $5.520 $3.050 $3.500 $5.000
REFL PAV MRKR TY II-A-A
EA 1,233.000 $5.720 $3.550 $4.000 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 37,363.000 $0.500 $0.160 $0.180 $0.150
PAV SURF PREP FOR MRK (6")
LF 128,960.000 $0.060 $0.020 $0.020 $0.030
PAV SURF PREP FOR MRK (8")
LF 1,005.000 $0.080 $0.040 $0.040 $0.050
PAV SURF PREP FOR MRK (24")
LF 630.000 $0.240 $10.200 $11.000 $0.150
PAV SURF PREP FOR MRK (ARROW)
EA 142.000 $5.280 $10.200 $11.000 $10.000
PAV SURF PREP FOR MRK (WORD)
EA 8.000 $9.880 $12.200 $13.500 $10.000
FULL - WIDTH MOWING
CYC 3.000 $3,000.000 $2,200.000 $3,000.000 $10,000.000
LITTER REMOVAL
CYC 3.000 $250.000 $2,150.000 $2,000.000 $6,800.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 3.000 $250.000 $2,900.000 $3,000.000 $6,500.000
CLEANING / SWEEPING (CENTER MEDIAN)
CYC 3.000 $500.000 $2,100.000 $3,000.000 $5,500.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 687.200 $36.000 $9.000 $4.500 $25.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $10,200.000 $25,000.000 $16,000.000
TMA (STATIONARY)
DAY 240.000 $200.000 $80.000 $500.000 $800.000
TMA (MOBILE OPERATION)
HR 100.000 $40.000 $100.000 $50.000 $100.000
Totals: $18,260,225.160 $20,817,021.425 $23,861,303.570 $28,498,228.470