GALVESTON SH 3 (0051-03-117)

Items: 96

County: GALVESTON
Length: N/A
Highway: SH 3
District: HOUSTON
Control Number: 0051-03-117
DBE Goal: N/A
Project: C 51-3-117
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $3,847,151.88
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$3,847,151.88
$4,384,915.81
Over/Under Est: 13.98% $537,763.93
Over/Under Est: 15.68% $603,193.43
Amt Left: 1.49% $65,429.50
Over/Under Est: 28.96% $1,114,267.77
Amt Left: 13.15% $576,503.84
Delta: -11.48% -$511,074.34
Subcontractor Percentage Amount
TRAF-TEX, INC. 12.11% $495,068.03
STRIPE LINES, INC. 4.59% $187,643.46
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. 0.93% $38,019.26
QUALITY TURF FARMS, L.C. 0.28% $11,446.66
Total: 17.91% $732,177.41

Bid Items & Bid Tabulations

96 Total 0 of 96
GALVESTON  |  SH 3  |  HOUSTON  |  0051-03-117  |  02/04/2022  |  $3,847,151.88  |  C 51-3-117  |  SURF/ROADWAY RESTOR  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURWOOD GREENE CONSTRUCTION CO.
TEXAS MATERIALS GROUP, INC.
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 10.000 $6.840 $40.000 $33.000 $241.500
REMOVING CONC (CURB)
LF 330.000 $3.350 $5.000 $11.000 $24.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 2,660.000 $7.100 $25.000 $23.000 $18.000
EXCAVATION (SPECIAL)
CY 996.000 $8.500 $30.000 $22.000 $30.000
BACKFILL (TY A OR B)
STA 17.000 $178.640 $275.000 $400.000 $619.000
BLOCK SODDING
SY 2,634.000 $3.250 $5.000 $4.000 $3.900
FERTILIZER
AC 0.500 $710.000 $1,500.000 $2,500.000 $905.500
VEGETATIVE WATERING
MG 65.000 $14.500 $40.000 $30.000 $60.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 12,401.000 $35.170 $23.000 $60.000 $65.000
PLANE ASPH CONC PAV (2")
SY 124,004.000 $2.000 $3.000 $2.200 $1.750
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 191.000 $236.180 $200.000 $220.000 $201.500
MOBILIZATION
LS 1.000 $145,310.000 $300,000.000 $227,500.000 $27,796.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $5,300.000 $4,000.000 $1,400.000 $10,812.000
CONC CURB (TY II)
LF 300.000 $6.500 $50.000 $50.000 $24.000
CONC CURB (DOWEL)
LF 85.000 $11.050 $120.000 $50.000 $24.000
CONC CURB (MOUNTABLE)
LF 50.000 $28.870 $120.000 $50.000 $24.000
CONC SIDEWALKS (4")
SY 3,956.000 $49.760 $75.000 $65.000 $66.500
CURB RAMPS (TY 1)
EA 12.000 $1,935.410 $2,800.000 $1,500.000 $5,070.000
CURB RAMPS (TY 5)
EA 4.000 $2,990.670 $5,000.000 $1,500.000 $5,070.000
CURB RAMPS (TY 7)
EA 23.000 $1,465.000 $2,700.000 $1,500.000 $5,070.000
CURB RAMPS (TY 21)
EA 2.000 $3,219.930 $3,400.000 $1,500.000 $5,070.000
CONDT (PVC) (SCH 80) (2")
LF 285.000 $9.300 $17.000 $20.000 $17.500
CONDT (PVC) (SCH 80) (3")
LF 300.000 $12.480 $27.000 $25.000 $28.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 825.000 $19.030 $29.000 $26.000 $29.500
ELEC CONDR (NO.6) BARE
LF 1,270.000 $1.590 $2.000 $2.000 $2.050
ELEC CONDR (NO.4) BARE
LF 145.000 $2.550 $3.000 $2.800 $3.050
ELEC CONDR (NO.4) INSULATED
LF 270.000 $2.870 $3.500 $3.200 $3.400
TRAY CABLE (4 CONDR) (12 AWG)
LF 1,875.000 $2.080 $3.000 $2.700 $3.150
GROUND BOX TY D (162922)
EA 10.000 $789.690 $800.000 $950.000 $829.500
GROUND BOX TY D (162922)W/APRON
EA 8.000 $1,125.580 $1,050.000 $1,150.000 $1,065.000
REMOVE GROUND BOX
EA 11.000 $172.040 $200.000 $105.000 $191.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 3.000 $4,941.500 $5,800.000 $5,600.000 $5,968.000
ALUMINUM SIGNS (TY A)
SF 801.000 $21.900 $26.000 $20.000 $24.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $445.710 $500.000 $305.000 $367.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 1.000 $618.000 $550.000 $320.000 $384.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 11.000 $400.000 $400.000 $305.000 $367.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 17,070.000 $0.300 $0.250 $0.240 $0.300
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 5,504.000 $0.200 $0.300 $0.250 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,810.000 $0.400 $0.600 $0.600 $0.650
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 5,436.000 $0.870 $1.250 $1.100 $1.350
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 4,190.000 $2.300 $2.500 $2.220 $2.650
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 166.000 $40.000 $80.000 $72.000 $84.500
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 20.000 $200.000 $120.000 $105.000 $120.500
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 42.000 $68.200 $75.000 $65.000 $78.500
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 7,196.000 $0.180 $0.280 $0.250 $0.300
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 56,886.000 $0.200 $0.280 $0.250 $0.300
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 3,132.000 $1.580 $2.500 $2.220 $2.650
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,405.000 $0.890 $1.000 $0.890 $1.050
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,718.000 $2.950 $3.500 $3.050 $3.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,095.000 $6.650 $7.000 $6.050 $7.250
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 83.000 $130.000 $150.000 $135.000 $157.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 21.000 $140.000 $140.000 $125.000 $145.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 10.000 $365.000 $330.000 $280.000 $332.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 1,566.000 $5.250 $6.500 $5.800 $7.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 8,535.000 $0.750 $0.750 $0.690 $0.800
PAVEMENT SEALER 12"
LF 1,400.000 $0.530 $0.400 $0.360 $0.450
PAVEMENT SEALER 24"
LF 1,350.000 $0.940 $0.800 $0.720 $0.850
PAVEMENT SEALER (RR XING)
EA 6.000 $28.990 $120.000 $100.000 $120.500
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 8,535.000 $0.520 $0.550 $0.490 $0.600
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 2,752.000 $0.470 $0.550 $0.490 $0.600
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 3,598.000 $0.430 $0.550 $0.490 $0.600
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 28,443.000 $0.510 $0.550 $0.490 $0.600
REFL PAV MRKR TY I-C
EA 177.000 $4.750 $4.500 $4.250 $5.050
REFL PAV MRKR TY II-A-A
EA 1,186.000 $3.250 $4.500 $4.250 $5.050
REFL PAV MRKR TY II-C-R
EA 423.000 $5.000 $4.500 $4.250 $5.050
ELIM EXT PAV MRK & MRKS (12")
LF 1,000.000 $0.920 $0.500 $0.450 $0.550
ELIM EXT PAV MRK & MRKS (24")
LF 400.000 $1.630 $1.000 $0.850 $1.050
PAV SURF PREP FOR MRK (12")
LF 1,400.000 $0.070 $0.100 $0.050 $0.050
PAV SURF PREP FOR MRK (24")
LF 1,350.000 $0.140 $0.200 $0.100 $0.100
PAV SURF PREP FOR MRK (RR XING)
EA 6.000 $17.470 $50.000 $25.000 $30.000
INSTALL HWY TRF SIG (SYSTEM)
EA 3.000 $27,946.210 $32,000.000 $26,000.000 $35,058.000
REMOVING TRAFFIC SIGNALS
EA 3.000 $3,438.130 $4,000.000 $2,350.000 $4,333.000
VEH SIG SEC (12")LED(GRN)
EA 31.000 $187.000 $200.000 $200.000 $212.500
VEH SIG SEC (12")LED(GRN ARW)
EA 6.000 $187.000 $200.000 $200.000 $216.000
VEH SIG SEC (12")LED(YEL)
EA 31.000 $187.000 $200.000 $200.000 $216.000
VEH SIG SEC (12")LED(YEL ARW)
EA 6.000 $187.000 $200.000 $200.000 $216.000
VEH SIG SEC (12")LED(RED)
EA 31.000 $187.000 $200.000 $200.000 $216.000
PED SIG SEC (LED)(COUNTDOWN)
EA 22.000 $526.850 $450.000 $550.000 $468.500
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 25.000 $126.190 $140.000 $70.000 $146.000
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 6.000 $179.320 $170.000 $100.000 $174.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 2,885.000 $1.580 $1.600 $1.700 $1.600
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 3,000.000 $1.960 $2.200 $2.250 $2.200
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 5,855.000 $2.490 $3.000 $3.200 $3.200
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
LF 95.000 $3.040 $4.000 $8.000 $4.050
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 2.000 $10,636.560 $13,500.000 $12,300.000 $14,106.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 10.000 $11,401.590 $15,500.000 $13,245.000 $16,205.000
PED POLE ASSEMBLY
EA 12.000 $1,645.360 $1,400.000 $1,050.000 $1,501.000
PED DETECT PUSH BUTTON (APS)
EA 22.000 $708.330 $850.000 $590.000 $886.000
PED DETECTOR CONTROLLER UNIT
EA 5.000 $2,139.410 $4,000.000 $2,250.000 $4,171.000
SP MIXES SP-D SAC-A PG70-22
TON 13,653.000 $136.000 $135.000 $133.000 $164.500
UNDERSEAL COURSE
GAL 24,811.000 $3.100 $5.500 $6.500 $4.650
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 600.000 $56.000 $50.000 $110.000 $60.500
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 3.000 $6,404.960 $9,300.000 $8,600.000 $9,668.000
TMA (MOBILE OPERATION)
DAY 150.000 $196.000 $250.000 $164.800 $30.000
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
EA 12.000 $856.870 $650.000 $460.000 $679.500
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
EA 6.000 $859.070 $500.000 $500.000 $451.500
Totals: $3,847,151.880 $4,384,915.810 $4,450,345.310 $4,961,419.650