Show Job Controls
Bid Cobra

GAINES US 62 (0294-01-041)

Items: 71

County: GAINES
Length: 0.0000 MILES
Highway: US 62
District: LUBBOCK
Control Number: 0294-01-041
DBE Goal: 0.0%
Project: STP 2026(050)HES
Guaranty: $100,000.00
Time: 169 WORKING DAYS
Engineer's Estimate: $8,835,842.50
Date: 10/08/2025 (8 months ago)
Contract Number: 10253012
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00126079
Contract Type: Federal
Project Description: DECEL LANES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEVE SISNEROS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$8,835,842.50
$8,218,151.81
Over/Under Est: -6.99% -$617,690.69
$8,512,896.60
Over/Under Est: -3.65% -$322,945.90
Amt Left: 3.59% $294,744.79
$9,785,720.33
Over/Under Est: 10.75% $949,877.83
Amt Left: 19.07% $1,567,568.52
Delta: -14.95% -$1,272,823.73
Subcontractor Percentage Amount
HJC FARMS, INC. 9.32% $769,642.04
TRP CONSTRUCTION GROUP, LLC 2.02% $166,810.83
MURRAY CONSTRUCTION 1.93% $159,378.66
PAVECON LTD. CO. 1.22% $100,747.13
FC TRAFFIC CONTROL, INC. 0.42% $34,683.44
Total: 14.91% $1,231,262.10

Bid Items & Bid Tabulations

71 Total 0 of 71
GAINES  |  US 62  |  LUBBOCK  |  0294-01-041  |  10/08/2025  |  $8,835,842.50  |  STP 2026(050)HES  |  HAZARD ELIM & SAFETY  |  169 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES HAMILTON CONSTRUCTION CO.
A. L. HELMCAMP, INC.
CI CONSTRUCTORS, INC.
REMOV CONC (MOWSTRIP)
SY 6,314.570 $15.000 $38.000 $35.000 $19.000
EXCAV (ROADWAY)
CY 1,932.000 $50.000 $13.000 $75.000 $30.000
SUBGR WIDEN (DC)
STA 364.000 $800.000 $1,200.000 $460.000 $1,500.000
EMBANK (FNL)(OC)(TY B)
CY 248.000 $100.000 $100.000 $50.000 $55.000
BACKFILL (TY B)
STA 403.000 $200.000 $400.000 $200.000 $580.000
BLADING
STA 403.000 $100.000 $400.000 $140.000 $125.000
REWORK BS MTL (TY B)(6")(ORD COMP)
STA 364.000 $5.000 $400.000 $150.000 $1,485.000
PRIME COAT (MC-30)
GAL 13,152.000 $7.000 $5.000 $9.000 $8.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 73,873.000 $4.500 $2.000 $3.000 $3.400
FOG SEAL (CSS-1H)
GAL 10,908.000 $6.000 $2.600 $4.000 $2.500
ASPH (AC-20-5TR)
GAL 10,800.000 $6.000 $5.600 $7.000 $5.300
AGGR (TY-PB, GR-4)(SAC-B)
CY 245.000 $400.000 $200.000 $320.000 $300.000
TACK COAT
GAL 10,908.000 $5.000 $6.000 $6.000 $7.600
D-GR HMA TY-D SAC-B PG70-28 (EXEMPT)
TON 7,430.000 $175.000 $170.000 $220.000 $178.000
D-GR HMA TY-B SAC-B PG70-28 (EXEMPT)
TON 13,895.000 $175.000 $150.000 $180.000 $150.000
PLANE ASPH CONC PAV(0" TO 6")
SY 29,694.000 $6.000 $9.500 $6.000 $12.000
CEM STABIL BKFL
CY 40.440 $250.000 $420.000 $320.000 $300.000
RIPRAP (MOW STRIP)(5 IN)
CY 875.100 $800.000 $550.000 $890.000 $860.000
CMP (GAL STL 24 IN)
LF 31.000 $705.000 $213.000 $110.000 $350.000
CMP (GAL STL 30 IN)
LF 12.000 $300.000 $306.000 $530.000 $470.000
RC PIPE (CL IV)(24 IN)
LF 120.000 $150.000 $200.000 $320.000 $400.000
RC PIPE (CL IV)(30 IN)
LF 24.000 $150.000 $223.000 $790.000 $500.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $3,000.000 $3,360.000 $2,400.000 $5,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $3,000.000 $4,000.000 $2,400.000 $5,800.000
SET (TY II) (30 IN) (CMP) (6: 1) (C)
EA 1.000 $3,000.000 $4,920.000 $3,200.000 $6,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 2.000 $3,000.000 $6,840.000 $3,200.000 $6,700.000
CLEAN EXIST CULVERTS
EA 5.000 $5,000.000 $5,300.000 $3,500.000 $4,000.000
MOBILIZATION
LS 1.000 $803,000.000 $837,000.000 $750,000.000 $973,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $25,000.000 $35,000.000 $9,900.000 $35,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 510.000 $100.000 $90.000 $80.000 $275.000
TMA (STATIONARY)
DAY 688.000 $150.000 $250.000 $200.000 $300.000
TMA (MOBILE OPERATION)
DAY 10.000 $600.000 $900.000 $200.000 $250.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 888.000 $50.000 $25.000 $20.000 $45.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $15.000 $5.000 $5.000 $15.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 4,380.000 $10.000 $7.500 $9.000 $11.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,190.000 $3.000 $4.000 $2.000 $3.500
INTERSECTIONS (SURF TREAT)
SY 647.000 $100.000 $40.000 $33.000 $40.000
CABLE BARRIER SYSTEM (RELOCATE)(TL-4)
LF 18,026.000 $15.000 $12.000 $15.000 $14.000
CABLE BARRIER TERM SEC (RELOC)(TL-4)
EA 33.000 $900.000 $3,300.000 $2,600.000 $4,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 28.000 $800.000 $800.000 $760.000 $935.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 26.000 $1,301.225 $935.000 $1,000.000 $1,250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 46.000 $1,000.000 $825.000 $850.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 40.000 $1,315.990 $1,070.000 $1,100.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 4.000 $1,200.000 $1,210.000 $1,100.000 $1,600.000
REMOVE SM RD SN SUP&AM
EA 143.000 $150.000 $110.000 $110.000 $100.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 9.000 $1.500 $16.500 $22.000 $26.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GNDHH
EA 66.000 $75.000 $176.000 $160.000 $230.000
INSTL OM ASSM (OM-2Z)(WFLX)GNDHH
EA 10.000 $75.000 $176.000 $160.000 $265.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,188.000 $2.000 $2.200 $1.000 $3.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 273.000 $1.500 $1.100 $1.050 $1.350
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 2,772.000 $1.500 $1.100 $1.050 $1.350
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 27,895.000 $1.000 $1.050 $1.000 $1.250
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 14,756.000 $1.000 $0.800 $0.800 $1.000
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 1,000.000 $1.000 $0.900 $0.900 $1.100
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 11,846.000 $1.000 $0.800 $0.800 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 37,280.000 $1.000 $0.800 $0.800 $1.000
PREFAB PM TY C (W)(12")(SLD)
LF 228.000 $1.000 $10.750 $11.000 $13.000
PREFAB PM TY C (W)(ARROW)
EA 130.000 $500.000 $247.500 $240.000 $300.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 240.000 $1.000 $50.000 $50.000 $60.000
REFL PAV MRKR TY II-A-A
EA 296.000 $5.000 $5.500 $5.300 $6.500
REFL PAV MRKR TY II-C-R
EA 2,794.000 $3.000 $4.400 $4.300 $5.500
ELIM EXT PM & MRKS (4")
LF 1,080.000 $1.000 $0.800 $0.800 $1.000
ELIM EXT PM & MRKS (6")
LF 36,140.000 $1.000 $0.800 $0.800 $1.500
ELIM EXT PM & MRKS (8")
LF 2,000.000 $1.000 $0.900 $0.900 $1.150
ELIM EXT PM & MRKS (ARROW)
EA 26.000 $100.000 $82.500 $80.000 $100.000
ELIM EXT PM & MRKS (36")(YLD TRI)
EA 102.000 $7.000 $22.000 $22.000 $30.000
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 40,160.000 $15.000 $2.000 $2.000 $4.000
FULL - WIDTH MOWING
CYC 3.000 $3,000.000 $4,620.000 $5,000.000 $6,000.000
LITTER REMOVAL
CYC 3.000 $1,000.000 $3,300.000 $2,500.000 $5,000.000
TEMP SPEED MONITOR SYS
EA 2.000 $20,000.000 $21,000.000 $10,000.000 $24,000.000
LED ROADSIDE SIGN
EA 4.000 $4,000.000 $3,520.000 $3,100.000 $4,300.000
Totals: $8,835,842.500 $8,218,151.810 $8,512,896.600 $9,785,720.330
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $4,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $44,000.00
Total: $48,000.00