GAINES US 62 (0228-02-051)

Items: 51

County: GAINES
Length: N/A
Highway: US 62
District: LUBBOCK
Control Number: 0228-02-051
DBE Goal: N/A
Project: NH 2B20(218)
Guaranty: N/A
Time: 407 WORKING DAYS
Engineer's Estimate: $11,055,057.40
Date: 11/04/2020 (5 years ago)
Contract Number: N/A
Type: INSTALL CABLE MEDIAN BARRIER
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$11,055,057.40
$8,857,058.15
Over/Under Est: -19.88% -$2,197,999.25
Over/Under Est: -18.05% -$1,995,600.12
Amt Left: 2.29% $202,399.13
Over/Under Est: -13.36% -$1,477,495.19
Amt Left: 8.13% $720,504.06
Delta: -5.72% -$518,104.93
$10,167,056.43
Over/Under Est: -8.03% -$888,000.97
Amt Left: 14.79% $1,309,998.28
Delta: -6.15% -$589,494.22
$11,048,907.00
Over/Under Est: -0.06% -$6,150.40
Amt Left: 24.75% $2,191,848.85
Delta: -8.67% -$881,850.57
$13,939,258.10
Over/Under Est: 26.09% $2,884,200.70
Amt Left: 57.38% $5,082,199.95
Delta: -26.16% -$2,890,351.10

Bid Items & Bid Tabulations

51 Total 0 of 51
GAINES  |  US 62  |  LUBBOCK  |  0228-02-051  |  11/04/2020  |  $11,055,057.40  |  NH 2B20(218)  |  INSTL CABLE MEDIAN BARRIER  |  407 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GRATIOT CONSTRUCTION, LTD.
ALLEN BUTLER CONSTRUCTION, INC.
SCR CIVIL CONSTRUCTION, LLC
ALTUS CONSTRUCTION LLC
FNH CONSTRUCTION, LLC
CI CONSTRUCTORS, INC.
OBLITERATING ABANDONED ROAD
STA 25.100 $1,600.000 $900.000 $2,830.400 $5,500.000 $4,956.640 $2,500.000 $2,500.000
SUBGRADE WIDENING (ORD COMP)
STA 39.040 $1,200.000 $650.000 $715.000 $2,800.000 $1,314.840 $2,500.000 $1,200.000
BACKFILL (TY B)
STA 1,875.000 $150.000 $120.000 $192.000 $185.000 $125.740 $450.000 $280.000
BLADING
STA 1,875.000 $150.000 $130.000 $104.000 $140.000 $65.740 $250.000 $420.000
PROOF ROLLING
HR 20.000 $200.000 $325.000 $81.000 $112.000 $262.970 $150.000 $150.000
FL BS (CMP IN PLC)(TY A GR 4) (8")
SY 3,122.000 $25.000 $16.000 $19.000 $19.000 $28.590 $30.000 $22.000
PRIME COAT (MC-30)
GAL 624.000 $8.000 $13.000 $6.500 $4.000 $5.190 $8.000 $7.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 156,361.000 $5.000 $4.250 $1.350 $1.000 $4.930 $4.000 $4.100
FOG SEAL (CSS-1H)
GAL 793.000 $8.000 $7.800 $4.900 $3.350 $4.220 $8.000 $6.000
D-GR HMA(SQ) TY-D SAC-A PG70-28
TON 537.000 $250.000 $390.000 $213.000 $255.000 $287.620 $250.000 $200.000
D-GR HMA(SQ) TY-B PG70-28
TON 675.000 $250.000 $300.000 $179.000 $195.000 $246.530 $250.000 $180.000
TACK COAT
GAL 654.000 $10.000 $6.500 $3.100 $3.600 $6.130 $8.000 $6.000
PLANE ASPH CONC PAV(2" TO 4")
SY 1,735.000 $15.000 $8.800 $12.000 $14.500 $11.500 $20.000 $13.000
CEM STABIL BKFL
CY 73.600 $400.000 $260.000 $181.000 $245.000 $131.480 $350.000 $200.000
RIPRAP (MOW STRIP)(5 IN)
CY 8,784.000 $450.000 $385.000 $466.000 $396.000 $440.460 $500.000 $550.000
RC PIPE (CL IV)(24 IN)
LF 320.000 $250.000 $260.000 $131.000 $217.000 $205.110 $105.000 $120.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $2,000.000 $1,950.000 $2,143.200 $2,000.000 $2,287.820 $2,500.000 $3,000.000
CLEAN EXIST CULVERTS
EA 4.000 $2,000.000 $2,600.000 $1,164.100 $3,300.000 $2,645.920 $1,500.000 $1,500.000
REMOV STR (PIPE)
EA 1.000 $2,000.000 $1,300.000 $2,656.700 $4,000.000 $551.480 $2,000.000 $1,600.000
MOBILIZATION
LS 1.000 $1,005,000.000 $670,000.000 $905,929.290 $979,000.000 $1,018,998.290 $1,050,000.000 $1,300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 33.000 $8,000.000 $1,800.000 $3,707.000 $19,630.000 $24,185.820 $8,500.000 $23,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 512.000 $30.000 $30.000 $44.000 $28.000 $27.480 $40.000 $60.000
CONSTRUCTION EXITS (REMOVE)
SY 512.000 $10.000 $12.000 $14.000 $15.000 $9.370 $15.000 $15.000
SANDBAGS FOR EROSION CONTROL
EA 614.000 $10.000 $12.000 $9.600 $5.600 $8.280 $5.000 $11.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,017.000 $6.000 $8.000 $6.300 $6.700 $6.570 $18.000 $11.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 19,840.000 $0.200 $0.400 $0.400 $1.200 $0.360 $0.500 $0.250
CABLE BARRIER SYSTEM (TL-4)
LF 185,426.000 $12.000 $9.000 $9.900 $8.060 $9.470 $7.500 $13.250
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 166.000 $3,000.000 $2,000.000 $2,030.800 $2,615.000 $1,874.700 $3,500.000 $3,300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $900.000 $960.000 $894.600 $850.000 $762.610 $850.000 $985.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 8.000 $1,000.000 $1,600.000 $1,394.300 $1,400.000 $1,209.650 $850.000 $1,650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 8.000 $1,000.000 $1,400.000 $989.000 $1,200.000 $999.280 $850.000 $1,400.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 74.000 $700.000 $970.000 $776.500 $850.000 $670.570 $650.000 $1,000.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 220.000 $80.000 $110.000 $41.000 $100.000 $131.480 $100.000 $115.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 94.000 $80.000 $115.000 $42.000 $100.000 $131.480 $100.000 $117.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 212.000 $30.000 $52.000 $14.000 $65.000 $39.450 $50.000 $60.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 494.000 $0.600 $0.850 $0.750 $0.750 $0.850 $8.000 $0.750
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 19,840.000 $0.400 $0.570 $0.500 $0.500 $0.580 $1.000 $0.600
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 496.000 $2.000 $1.300 $2.750 $2.250 $1.310 $10.000 $4.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 800.000 $1.200 $2.600 $2.250 $2.250 $2.630 $6.000 $2.600
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 496.000 $1.000 $2.600 $2.250 $2.250 $2.630 $6.000 $2.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 20,440.000 $0.600 $1.100 $0.950 $0.950 $1.120 $1.000 $1.150
PREFAB PAV MRK TY C (W) (ARROW)
EA 16.000 $300.000 $390.000 $339.000 $335.000 $394.450 $600.000 $400.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 56.000 $50.000 $45.000 $40.000 $40.000 $46.020 $250.000 $45.000
REFL PAV MRKR TY II-C-R
EA 498.000 $3.500 $5.200 $4.500 $4.500 $5.260 $5.000 $5.300
ELIM EXT PAV MRK & MRKS (4")
LF 19,840.000 $1.000 $1.000 $0.850 $0.850 $0.990 $1.000 $1.000
ELIM EXT PAV MRK & MRKS (6")
LF 496.000 $1.500 $1.300 $1.150 $1.150 $1.310 $6.000 $1.500
FULL - WIDTH MOWING
CYC 4.000 $90,000.000 $32,000.000 $31,195.050 $59,000.000 $5,023.790 $3,000.000 $100,000.000
LITTER REMOVAL
CYC 4.000 $45,000.000 $13,000.000 $15,597.530 $33,000.000 $2,832.270 $3,000.000 $100,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $18,000.000 $16,287.870 $27,000.000 $9,203.860 $16,500.000 $20,000.000
TMA (STATIONARY)
DAY 1,204.000 $250.000 $325.000 $5.800 $250.000 $197.230 $250.000 $300.000
TMA (MOBILE OPERATION)
DAY 18.000 $300.000 $450.000 $586.600 $220.000 $394.450 $850.000 $400.000
Totals: $11,055,057.400 $8,857,058.150 $9,059,457.280 $9,577,562.210 $10,167,056.446 $11,048,907.000 $13,939,258.100