Engineer's Estimate: $18,856,040.87
Date: 01/07/2022 (4 years ago)
Contract Number: N/A
Type: REHABILITATION OF ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$18,856,040.87
1
$18,829,752.00
Over/Under Est: -0.14% -$26,288.87
$19,807,029.57
Over/Under Est: 5.04% $950,988.70
Amt Left: 5.19% $977,277.57
Subcontractor Percentage Amount
JONES BROS. DIRT & PAVING CONTRACTORS, INC. 10.58% $1,902,368.64
TORO BRAVO CONSTRUCTION, LLC 6.35% $1,141,780.80
WILLIS ELECTRIC CO., LP 6.22% $1,118,405.76
USA WESTERN LOGISTICS 2.72% $489,077.76
BARRICADES UNLIMITED 2.00% $359,616.00
TRP CONSTRUCTION GROUP, LLC 1.17% $210,375.36
SERNA"S TRUCKING 1.06% $190,596.48
A BROTHERS MILLING, LLC 0.84% $151,038.72
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.39% $70,125.12
4-WAY HAULERS, LLC 0.37% $66,528.96
FUSION COMMUNICATIONS, LLC 0.34% $61,134.72
ACT SAW CUTTING & REMOVAL 0.32% $57,538.56
V-TECH ENVIROMENTAL SERVICES 0.30% $53,942.40
HJC FARMS, INC. 0.16% $28,769.28
PENHALL COMPANY 0.03% $5,394.24
AMERICAN CONCRETE TRUCKING, LLC 0.00% $0.00
Total: 32.85% $5,906,692.80

Bid Items & Bid Tabulations

123 Total 0 of 123
GAINES  |  US 62  |  LUBBOCK  |  0228-02-049  |  01/07/2022  |  $18,856,040.87  |  F 2022(371)  |  REHAB OF ROADWAY  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
A. L. HELMCAMP, INC.
PREPARING ROW
STA 63.000 $25,000.000 $27,775.000 $20,000.000
REMOVING CONC (RIPRAP)
SY 652.000 $10.000 $35.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 1,793.000 $30.000 $35.000 $40.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 7,216.000 $12.000 $18.000 $25.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 65.000 $215.000 $130.000 $30.000
REMOVE STAB BASE & ASPH PAV (13"-18")
SY 51,367.000 $15.000 $25.550 $11.000
EXCAVATION (ROADWAY)
CY 4,947.000 $20.000 $25.000 $26.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,398.000 $25.000 $18.000 $26.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 88,421.000 $0.300 $0.200 $0.180
VEGETATIVE WATERING
MG 2,976.000 $20.000 $20.000 $25.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 22,990.000 $6.000 $4.750 $4.800
ASPH (AC-20-5TR)
GAL 14,091.910 $7.000 $5.000 $4.800
AGGR(TY-PB GR-4 SAC-B)
CY 319.540 $250.000 $150.000 $190.000
D-GR HMA(SQ) TY-C PG70-28
TON 11,405.600 $170.000 $150.500 $170.000
TACK COAT
GAL 6,942.500 $5.000 $4.000 $4.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,700.000 $190.000 $45.000 $85.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13")
SY 1,936.000 $230.000 $60.000 $155.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 46,834.220 $115.000 $105.000 $125.000
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 127.000 $250.000 $190.000 $250.000
CEM STABIL BKFL
CY 130.400 $200.000 $130.000 $180.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 520.000 $250.000 $325.000 $350.000
RIPRAP (CONC)(FLUME)
CY 1.000 $3,000.000 $2,500.000 $2,900.000
RIPRAP (MOW STRIP)(5 IN)
CY 90.000 $600.000 $400.000 $650.000
RAIL (HANDRAIL)(TY B)
LF 50.000 $220.000 $177.000 $210.000
CMP (GAL STL 24 IN)
LF 770.000 $70.000 $75.000 $106.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 28.000 $1,200.000 $1,500.000 $1,900.000
ADJUSTING MANHOLES (SANITARY)
EA 5.000 $500.000 $2,575.000 $2,800.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 15.000 $350.000 $500.000 $1,200.000
CLEAN EXIST CULVERTS
EA 11.000 $2,000.000 $1,500.000 $1,800.000
REMOV STR (PIPE)
EA 9.000 $2,300.000 $2,500.000 $2,000.000
MOBILIZATION
LS 1.000 $1,614,000.000 $1,750,000.000 $1,700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 29.000 $12,000.000 $58,000.000 $53,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $40.000 $25.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $20.000 $7.000 $11.000
SANDBAGS FOR EROSION CONTROL
EA 122.000 $30.000 $9.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,795.000 $3.000 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,398.000 $1.000 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,650.000 $8.000 $8.000 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 825.000 $1.000 $1.000 $1.000
CONSTRUCTING DETOURS
SY 7,830.000 $100.000 $85.000 $72.000
CONC CURB & GUTTER (TY II)
LF 6,958.000 $30.000 $39.900 $50.000
CONCRETE CURB (SPECIAL)
LF 717.000 $80.000 $65.000 $68.000
INTERSECTIONS (CONC)
SY 2,638.620 $200.000 $105.000 $230.000
INTERSECTIONS (ACP)
SY 283.170 $190.000 $130.000 $48.000
DRIVEWAYS (CONC)
SY 2,955.000 $100.000 $79.500 $230.000
DRIVEWAYS (ACP)
SY 1,188.050 $90.000 $130.000 $48.000
DRIVEWAYS (SURF TREAT)
SY 1,526.520 $40.000 $45.000 $38.000
CONC SIDEWALKS (5")
SY 4,532.500 $70.000 $43.000 $83.000
CONC SIDEWALKS (6")
SY 223.700 $100.000 $55.000 $86.000
CURB RAMPS (TY 1)
SY 288.400 $200.000 $140.000 $78.000
CURB RAMPS (TY 10)
SY 7.800 $900.000 $220.000 $350.000
REMOVE CABLE BARRIER
LF 1,885.000 $5.000 $5.250 $3.500
REMOVE CABLE BARRIER TERMINAL SECTION
EA 2.000 $500.000 $500.000 $750.000
INSTALL SALVAGE CABLE BARRIER
LF 1,885.000 $5.000 $5.250 $7.000
INSTALL SALVAGE CABLE BAR TERM SECTION
EA 2.000 $500.000 $1,500.000 $2,000.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $400.000 $500.000 $380.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $800.000 $825.000 $780.000
REMOVE RD IL ASM (SHOE-BASE)
EA 23.000 $700.000 $350.000 $380.000
IN RD IL (TY SA) 40S-12 (250W EQ) LED
EA 53.000 $5,000.000 $5,500.000 $3,800.000
IN RD IL (TY SA) 40T-12 (250W EQ) LED
EA 12.000 $5,000.000 $6,000.000 $6,400.000
CONDT (PVC) (SCH 80) (2")
LF 9,808.000 $12.000 $10.000 $11.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 3,115.000 $30.000 $40.000 $43.000
ELEC CONDR (NO.4) BARE
LF 12,920.000 $2.500 $3.000 $3.200
ELEC CONDR (NO.4) INSULATED
LF 25,840.000 $2.800 $3.500 $3.800
GROUND BOX TY A (122311)W/APRON
EA 56.000 $1,200.000 $1,850.000 $2,000.000
GROUND BOX TY C (162911)W/APRON
EA 2.000 $1,800.000 $2,000.000 $2,200.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $1,000.000 $350.000 $400.000
ELC SRV TY A 120/240 060(SS)SS(E)SP(O)
EA 1.000 $8,000.000 $10,000.000 $9,600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 39.000 $800.000 $825.000 $860.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 11.000 $900.000 $825.000 $870.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 1.000 $1,300.000 $1,500.000 $1,300.000
IN SM RD SN SUP&AM TYS80(1)SB(T-2EXT)
EA 1.000 $1,500.000 $1,500.000 $1,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 4.000 $700.000 $750.000 $670.000
REMOVE SM RD SN SUP&AM
EA 58.000 $100.000 $100.000 $135.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 49.000 $50.000 $25.000 $27.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 21.000 $100.000 $75.000 $81.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 22.000 $100.000 $100.000 $84.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 70,440.000 $0.350 $0.150 $0.140
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 28,965.000 $0.500 $0.200 $0.220
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 60.000 $4.000 $3.000 $3.200
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 6,033.000 $0.350 $0.200 $0.220
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 136,335.000 $0.350 $0.150 $0.140
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 639.000 $4.000 $3.500 $3.800
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 2,231.000 $4.000 $3.500 $3.800
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 1,902.000 $4.000 $2.250 $2.400
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 6,680.000 $4.000 $2.250 $2.400
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 781.000 $2.000 $1.000 $0.600
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 498.000 $2.000 $1.000 $0.600
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 260.000 $2.000 $2.000 $2.200
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 8,250.000 $0.600 $0.750 $0.850
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 2,470.000 $0.900 $1.000 $1.100
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 9,300.000 $0.600 $0.750 $0.850
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 3,200.000 $18.000 $13.000 $14.000
PREFAB PAV MRK TY B (W)(12")(SLD)
LF 570.000 $20.000 $18.000 $19.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 513.000 $40.000 $36.000 $39.000
PREFAB PAV MRK TY B (W)(DBL ARROW)
EA 8.000 $1,500.000 $1,200.000 $1,300.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 72.000 $30.000 $15.000 $16.000
REFL PAV MRKR TY I-C
EA 179.000 $5.000 $3.500 $4.000
REFL PAV MRKR TY II-A-A
EA 261.000 $5.000 $3.500 $4.000
REFL PAV MRKR TY II-C-R
EA 125.000 $5.000 $3.500 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 90,375.000 $0.600 $0.750 $0.800
ELIM EXT PAV MRK & MRKS (8")
LF 185.000 $1.200 $1.000 $1.100
ELIM EXT PAV MRK & MRKS (12")
LF 530.000 $2.000 $2.000 $2.100
ELIM EXT PAV MRK & MRKS (24")
LF 89.000 $5.000 $4.000 $4.200
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 4.000 $60.000 $100.000 $110.000
PAV SURF PREP FOR MRK (4")
LF 15,955.000 $0.300 $0.150 $0.170
PAV SURF PREP FOR MRK (8")
LF 3,450.000 $0.600 $0.150 $0.170
PAV SURF PREP FOR MRK (12")
LF 570.000 $0.800 $1.000 $1.100
PAV SURF PREP FOR MRK (24")
LF 513.000 $2.000 $1.000 $1.100
PAV SURF PREP FOR MRK (DBL ARROW)
EA 8.000 $35.000 $100.000 $110.000
FULL - WIDTH MOWING
CYC 4.000 $9,000.000 $1,500.000 $3,000.000
LITTER REMOVAL
CYC 4.000 $7,000.000 $2,500.000 $3,000.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 28.000 $2,500.000 $1,650.000 $2,000.000
NO. OF WORKING DAYS
$/D 1,814.000 $608.000 $468.000 $490.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 936.000 $100.000 $40.000 $65.000
MULTIPOLYMER PAV MRK (W)(4")(SLD)
LF 2,270.000 $2.000 $3.000 $3.200
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 250.000 $4.000 $3.000 $3.200
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 11,275.000 $2.000 $3.000 $3.200
MULTIPOLYMER PAV MRK (Y)(4")(BRK)
LF 2,410.000 $2.000 $3.000 $3.200
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 159.000 $100.000 $75.000 $79.000
TMA (STATIONARY)
DAY 936.000 $250.000 $150.000 $110.000
TMA (MOBILE OPERATION)
DAY 15.000 $850.000 $450.000 $750.000
TEMP SPEED MONITOR SYS
EA 1.000 $10,000.000 $12,514.350 $13,000.000
Totals: $18,856,040.870 $18,829,752.000 $19,807,029.578