Show Job Controls
Bid Cobra

GAINES US 62 (0228-02-048)

Items: 114

County: GAINES
Length: N/A
Highway: US 62
District: LUBBOCK
Control Number: 0228-02-048
DBE Goal: N/A
Project: NH 2019(612)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $12,264,301.18
Date: 08/06/2019 (6 years ago)
Contract Number: N/A
Type: MILL, HMA BASE, CRCP
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$12,264,301.18
$17,313,800.00
Over/Under Est: 41.17% $5,049,498.82
$17,965,341.27
Over/Under Est: 46.48% $5,701,040.09
Amt Left: 3.76% $651,541.27

Bid Items & Bid Tabulations

114 Total 0 of 114
GAINES  |  US 62  |  LUBBOCK  |  0228-02-048  |  08/06/2019  |  $12,264,301.18  |  NH 2019(612)  |  MILL, HMA BASE, CRCP  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
WEBBER, LLC
A. L. HELMCAMP, INC.
PREPARING ROW
STA 63.000 $2,000.000 $22,700.000 $5,500.000
REMOVING CONC (RIPRAP)
SY 6.000 $20.000 $400.000 $98.000
REMOVING CONC (DRIVEWAYS)
SY 1,793.000 $15.000 $30.000 $60.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 7,216.000 $8.000 $12.000 $22.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 65.000 $8.000 $215.000 $29.000
REMOVE STAB BASE & ASPH PAV (13"-18")
SY 50,469.000 $8.000 $21.000 $10.000
EXCAVATION (ROADWAY)
CY 8,272.000 $10.000 $25.000 $21.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,061.000 $10.000 $23.000 $21.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 88,421.000 $0.200 $0.250 $0.170
VEGETATIVE WATERING
MG 2,976.000 $25.000 $60.000 $25.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 22,990.000 $4.000 $5.500 $4.800
ASPH (AC-20-5TR)
GAL 14,091.910 $3.500 $5.000 $4.600
AGGR(TY-PB GR-4 SAC-B)
CY 319.540 $150.000 $250.000 $190.000
D-GR HMA(SQ) TY-C PG70-28
TON 11,405.600 $150.000 $170.000 $148.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,700.000 $30.000 $190.000 $85.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13")
SY 738.000 $80.000 $230.000 $155.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 46,834.220 $100.000 $95.000 $125.000
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 127.000 $100.000 $250.000 $250.000
CEM STABIL BKFL
CY 130.400 $150.000 $100.000 $180.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 520.000 $200.000 $365.000 $350.000
RIPRAP (CONC)(FLUME)
CY 1.000 $1,000.000 $2,500.000 $2,900.000
RAIL (HANDRAIL)(TY B)
LF 50.000 $120.000 $208.000 $160.000
CMP (GAL STL 24 IN)
LF 770.000 $100.000 $68.500 $90.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 28.000 $2,000.000 $1,190.000 $1,100.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 15.000 $900.000 $350.000 $2,800.000
CLEAN EXIST CULVERTS
EA 11.000 $2,000.000 $1,000.000 $1,800.000
REMOV STR (PIPE)
EA 9.000 $2,500.000 $2,300.000 $2,000.000
MOBILIZATION
LS 1.000 $1,019,000.000 $1,620,000.000 $1,650,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $8,000.000 $12,000.000 $53,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $30.000 $40.750 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $10.000 $21.000 $11.000
SANDBAGS FOR EROSION CONTROL
EA 122.000 $8.000 $25.100 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,795.000 $3.000 $2.900 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,795.000 $1.000 $0.750 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,650.000 $5.000 $7.400 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,650.000 $2.000 $1.000 $1.000
CONSTRUCTING DETOURS
SY 7,830.000 $25.000 $95.000 $72.000
CONC CURB & GUTTER (TY II)
LF 6,958.000 $25.000 $35.000 $50.000
CONCRETE CURB (SPECIAL)
LF 717.000 $50.000 $80.000 $68.000
INTERSECTIONS (CONC)
SY 2,638.620 $100.000 $205.000 $230.000
INTERSECTIONS (ACP)
SY 283.170 $60.000 $190.000 $48.000
DRIVEWAYS (CONC)
SY 2,955.000 $80.000 $94.000 $230.000
DRIVEWAYS (ACP)
SY 1,188.050 $40.000 $92.000 $48.000
DRIVEWAYS (SURF TREAT)
SY 1,526.520 $25.000 $30.000 $38.000
CONC SIDEWALKS (5")
SY 4,532.500 $50.000 $55.000 $83.000
CONC SIDEWALKS (6")
SY 223.700 $50.000 $75.000 $86.000
CURB RAMPS (TY 1)
SY 288.400 $200.000 $165.000 $78.000
CURB RAMPS (TY 10)
SY 7.800 $200.000 $900.000 $350.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $300.000 $325.000 $250.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $600.000 $800.000 $660.000
REMOVE RD IL ASM (SHOE-BASE)
EA 23.000 $500.000 $669.000 $600.000
IN RD IL (TY SA) 40T-12 (250W EQ) LED
EA 65.000 $3,500.000 $5,500.000 $4,200.000
CONDT (PVC) (SCH 80) (2")
LF 9,808.000 $5.000 $6.700 $6.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 3,115.000 $15.000 $30.500 $27.000
ELEC CONDR (NO.4) BARE
LF 12,920.000 $1.300 $2.450 $2.200
ELEC CONDR (NO.4) INSULATED
LF 25,840.000 $1.400 $2.750 $2.400
GROUND BOX TY A (122311)W/APRON
EA 56.000 $700.000 $1,340.000 $1,200.000
GROUND BOX TY C (162911)W/APRON
EA 2.000 $1,000.000 $1,700.000 $1,500.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $500.000 $1,000.600 $430.000
ELC SRV TY A 120/240 060(SS)SS(E)SP(O)
EA 1.000 $5,000.000 $7,910.000 $6,900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 39.000 $600.000 $642.000 $510.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 11.000 $600.000 $732.000 $580.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 1.000 $1,200.000 $1,260.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SB(T-2EXT)
EA 1.000 $1,200.000 $1,340.000 $1,100.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 4.000 $750.000 $527.000 $420.000
REMOVE SM RD SN SUP&AM
EA 58.000 $80.000 $94.750 $75.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 21.000 $80.000 $73.000 $65.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 22.000 $80.000 $73.000 $65.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 49.000 $30.000 $24.300 $25.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 70,440.000 $0.200 $0.350 $0.300
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 28,965.000 $0.300 $0.500 $0.450
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 60.000 $3.000 $3.650 $3.200
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 6,033.000 $0.200 $0.350 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 136,335.000 $0.200 $0.350 $0.300
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 639.000 $4.000 $6.650 $6.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 2,231.000 $4.000 $6.650 $6.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 1,902.000 $4.000 $4.050 $3.600
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 6,680.000 $4.000 $4.150 $3.700
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 781.000 $2.000 $0.500 $0.600
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 498.000 $2.000 $0.550 $0.600
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 260.000 $1.000 $1.200 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 8,250.000 $0.400 $0.600 $0.550
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 2,470.000 $0.600 $0.900 $0.800
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 9,300.000 $0.400 $0.600 $0.550
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 3,200.000 $10.000 $15.200 $14.000
PREFAB PAV MRK TY B (W)(12")(SLD)
LF 570.000 $12.000 $16.400 $14.500
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 513.000 $15.000 $32.750 $29.000
PREFAB PAV MRK TY B (W)(DBL ARROW)
EA 8.000 $400.000 $1,460.000 $1,300.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 72.000 $20.000 $21.300 $19.000
REFL PAV MRKR TY I-C
EA 179.000 $3.000 $4.850 $4.500
REFL PAV MRKR TY II-A-A
EA 261.000 $3.000 $4.850 $4.500
REFL PAV MRKR TY II-C-R
EA 125.000 $3.000 $4.850 $4.500
ELIM EXT PAV MRK & MRKS (4")
LF 90,375.000 $0.600 $0.600 $0.550
ELIM EXT PAV MRK & MRKS (8")
LF 185.000 $1.500 $1.200 $1.100
ELIM EXT PAV MRK & MRKS (12")
LF 530.000 $3.250 $1.850 $1.600
ELIM EXT PAV MRK & MRKS (24")
LF 89.000 $5.000 $3.650 $3.200
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 4.000 $150.000 $60.750 $55.000
PAV SURF PREP FOR MRK (4")
LF 15,955.000 $0.500 $0.250 $0.220
PAV SURF PREP FOR MRK (8")
LF 3,450.000 $1.000 $0.350 $0.330
PAV SURF PREP FOR MRK (12")
LF 570.000 $3.000 $0.750 $0.650
PAV SURF PREP FOR MRK (24")
LF 513.000 $6.000 $1.200 $1.100
PAV SURF PREP FOR MRK (DBL ARROW)
EA 8.000 $30.000 $30.500 $27.000
FULL - WIDTH MOWING
CYC 4.000 $6,000.000 $9,000.000 $3,000.000
LITTER REMOVAL
CYC 4.000 $3,000.000 $7,000.000 $3,000.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 28.000 $2,000.000 $2,500.000 $2,500.000
NO. OF WORKING DAYS
$/D 1,800.000 $459.000 $350.000 $459.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,000.000 $19,000.000 $30,000.000
MULTIPOLYMER PAV MRK (W)(4")(SLD)
LF 2,270.000 $1.500 $1.850 $1.600
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 250.000 $4.000 $3.650 $3.200
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 11,275.000 $1.500 $1.850 $1.600
MULTIPOLYMER PAV MRK (Y)(4")(BRK)
LF 2,410.000 $1.500 $1.850 $1.600
LONG CHANNEL MOUNT CURB SYS (INSTALL)
LF 159.000 $80.000 $95.000 $78.000
TMA (STATIONARY)
DAY 918.000 $150.000 $350.000 $120.000
TMA (MOBILE OPERATION)
DAY 15.000 $300.000 $850.000 $700.000
Totals: $12,264,301.185 $17,313,800.000 $17,965,341.276