PREPARING ROW
|
STA
|
63.000
|
$2,000.000
|
$22,700.000
|
$5,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
6.000
|
$20.000
|
$400.000
|
$98.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,793.000
|
$15.000
|
$30.000
|
$60.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
7,216.000
|
$8.000
|
$12.000
|
$22.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
65.000
|
$8.000
|
$215.000
|
$29.000
|
|
|
REMOVE STAB BASE & ASPH PAV (13"-18")
|
SY
|
50,469.000
|
$8.000
|
$21.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
8,272.000
|
$10.000
|
$25.000
|
$21.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,061.000
|
$10.000
|
$23.000
|
$21.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
88,421.000
|
$0.200
|
$0.250
|
$0.170
|
|
|
VEGETATIVE WATERING
|
MG
|
2,976.000
|
$25.000
|
$60.000
|
$25.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
22,990.000
|
$4.000
|
$5.500
|
$4.800
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
14,091.910
|
$3.500
|
$5.000
|
$4.600
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
319.540
|
$150.000
|
$250.000
|
$190.000
|
|
|
D-GR HMA(SQ) TY-C PG70-28
|
TON
|
11,405.600
|
$150.000
|
$170.000
|
$148.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,700.000
|
$30.000
|
$190.000
|
$85.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13")
|
SY
|
738.000
|
$80.000
|
$230.000
|
$155.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
46,834.220
|
$100.000
|
$95.000
|
$125.000
|
|
|
CONC PVMT(CRCP)(TRANSITION SLAB)
|
SY
|
127.000
|
$100.000
|
$250.000
|
$250.000
|
|
|
CEM STABIL BKFL
|
CY
|
130.400
|
$150.000
|
$100.000
|
$180.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
520.000
|
$200.000
|
$365.000
|
$350.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
1.000
|
$1,000.000
|
$2,500.000
|
$2,900.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
50.000
|
$120.000
|
$208.000
|
$160.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
770.000
|
$100.000
|
$68.500
|
$90.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
28.000
|
$2,000.000
|
$1,190.000
|
$1,100.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
15.000
|
$900.000
|
$350.000
|
$2,800.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$2,000.000
|
$1,000.000
|
$1,800.000
|
|
|
REMOV STR (PIPE)
|
EA
|
9.000
|
$2,500.000
|
$2,300.000
|
$2,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,019,000.000
|
$1,620,000.000
|
$1,650,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
28.000
|
$8,000.000
|
$12,000.000
|
$53,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
444.000
|
$30.000
|
$40.750
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$10.000
|
$21.000
|
$11.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
122.000
|
$8.000
|
$25.100
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,795.000
|
$3.000
|
$2.900
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,795.000
|
$1.000
|
$0.750
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,650.000
|
$5.000
|
$7.400
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,650.000
|
$2.000
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
7,830.000
|
$25.000
|
$95.000
|
$72.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
6,958.000
|
$25.000
|
$35.000
|
$50.000
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
717.000
|
$50.000
|
$80.000
|
$68.000
|
|
|
INTERSECTIONS (CONC)
|
SY
|
2,638.620
|
$100.000
|
$205.000
|
$230.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
283.170
|
$60.000
|
$190.000
|
$48.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,955.000
|
$80.000
|
$94.000
|
$230.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,188.050
|
$40.000
|
$92.000
|
$48.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,526.520
|
$25.000
|
$30.000
|
$38.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
4,532.500
|
$50.000
|
$55.000
|
$83.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
223.700
|
$50.000
|
$75.000
|
$86.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
288.400
|
$200.000
|
$165.000
|
$78.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
7.800
|
$200.000
|
$900.000
|
$350.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$300.000
|
$325.000
|
$250.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$600.000
|
$800.000
|
$660.000
|
|
|
REMOVE RD IL ASM (SHOE-BASE)
|
EA
|
23.000
|
$500.000
|
$669.000
|
$600.000
|
|
|
IN RD IL (TY SA) 40T-12 (250W EQ) LED
|
EA
|
65.000
|
$3,500.000
|
$5,500.000
|
$4,200.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
9,808.000
|
$5.000
|
$6.700
|
$6.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
3,115.000
|
$15.000
|
$30.500
|
$27.000
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
12,920.000
|
$1.300
|
$2.450
|
$2.200
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
25,840.000
|
$1.400
|
$2.750
|
$2.400
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
56.000
|
$700.000
|
$1,340.000
|
$1,200.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
2.000
|
$1,000.000
|
$1,700.000
|
$1,500.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$500.000
|
$1,000.600
|
$430.000
|
|
|
ELC SRV TY A 120/240 060(SS)SS(E)SP(O)
|
EA
|
1.000
|
$5,000.000
|
$7,910.000
|
$6,900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
39.000
|
$600.000
|
$642.000
|
$510.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
11.000
|
$600.000
|
$732.000
|
$580.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$1,200.000
|
$1,260.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T-2EXT)
|
EA
|
1.000
|
$1,200.000
|
$1,340.000
|
$1,100.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
4.000
|
$750.000
|
$527.000
|
$420.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
58.000
|
$80.000
|
$94.750
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
21.000
|
$80.000
|
$73.000
|
$65.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
22.000
|
$80.000
|
$73.000
|
$65.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
49.000
|
$30.000
|
$24.300
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
70,440.000
|
$0.200
|
$0.350
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
28,965.000
|
$0.300
|
$0.500
|
$0.450
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
60.000
|
$3.000
|
$3.650
|
$3.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
6,033.000
|
$0.200
|
$0.350
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
136,335.000
|
$0.200
|
$0.350
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
639.000
|
$4.000
|
$6.650
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
2,231.000
|
$4.000
|
$6.650
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
1,902.000
|
$4.000
|
$4.050
|
$3.600
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
6,680.000
|
$4.000
|
$4.150
|
$3.700
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
781.000
|
$2.000
|
$0.500
|
$0.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
498.000
|
$2.000
|
$0.550
|
$0.600
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
260.000
|
$1.000
|
$1.200
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
8,250.000
|
$0.400
|
$0.600
|
$0.550
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
2,470.000
|
$0.600
|
$0.900
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
9,300.000
|
$0.400
|
$0.600
|
$0.550
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
3,200.000
|
$10.000
|
$15.200
|
$14.000
|
|
PREFAB PAV MRK TY B (W)(12")(SLD)
|
LF
|
570.000
|
$12.000
|
$16.400
|
$14.500
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
513.000
|
$15.000
|
$32.750
|
$29.000
|
|
PREFAB PAV MRK TY B (W)(DBL ARROW)
|
EA
|
8.000
|
$400.000
|
$1,460.000
|
$1,300.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
72.000
|
$20.000
|
$21.300
|
$19.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
179.000
|
$3.000
|
$4.850
|
$4.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
261.000
|
$3.000
|
$4.850
|
$4.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
125.000
|
$3.000
|
$4.850
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
90,375.000
|
$0.600
|
$0.600
|
$0.550
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
185.000
|
$1.500
|
$1.200
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
530.000
|
$3.250
|
$1.850
|
$1.600
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
89.000
|
$5.000
|
$3.650
|
$3.200
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
4.000
|
$150.000
|
$60.750
|
$55.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
15,955.000
|
$0.500
|
$0.250
|
$0.220
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,450.000
|
$1.000
|
$0.350
|
$0.330
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
570.000
|
$3.000
|
$0.750
|
$0.650
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
513.000
|
$6.000
|
$1.200
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
8.000
|
$30.000
|
$30.500
|
$27.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$6,000.000
|
$9,000.000
|
$3,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
4.000
|
$3,000.000
|
$7,000.000
|
$3,000.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
28.000
|
$2,000.000
|
$2,500.000
|
$2,500.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
1,800.000
|
$459.000
|
$350.000
|
$459.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,000.000
|
$19,000.000
|
$30,000.000
|
|
MULTIPOLYMER PAV MRK (W)(4")(SLD)
|
LF
|
2,270.000
|
$1.500
|
$1.850
|
$1.600
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
250.000
|
$4.000
|
$3.650
|
$3.200
|
|
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
|
LF
|
11,275.000
|
$1.500
|
$1.850
|
$1.600
|
|
MULTIPOLYMER PAV MRK (Y)(4")(BRK)
|
LF
|
2,410.000
|
$1.500
|
$1.850
|
$1.600
|
|
|
LONG CHANNEL MOUNT CURB SYS (INSTALL)
|
LF
|
159.000
|
$80.000
|
$95.000
|
$78.000
|
|
|
TMA (STATIONARY)
|
DAY
|
918.000
|
$150.000
|
$350.000
|
$120.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$300.000
|
$850.000
|
$700.000
|
|
Totals: |
$12,264,301.185
|
$17,313,800.000
|
$17,965,341.276
|