FRIO BI 35-E (0017-15-028)

Items: 84

County: FRIO
Length: N/A
Highway: BI 35-E
District: SAN ANTONIO
Control Number: 0017-15-028
DBE Goal: 300.0%
Project: STP 2024(938)HES
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $2,330,443.31
Date: 04/04/2024 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
ORLANDO GALLEGOS
THANYA TARROSA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$2,330,443.31
$2,106,851.00
Over/Under Est: -9.59% -$223,592.31
Over/Under Est: -0.17% -$3,917.43
Amt Left: 10.43% $219,674.88
$2,351,743.50
Over/Under Est: 0.91% $21,300.19
Amt Left: 11.62% $244,892.50
Delta: -1.08% -$25,217.62
Over/Under Est: 5.57% $129,769.16
Amt Left: 16.77% $353,361.47
Delta: -4.61% -$108,468.97
$2,541,704.00
Over/Under Est: 9.07% $211,260.69
Amt Left: 20.64% $434,853.00
Delta: -3.31% -$81,491.53
$2,696,332.32
Over/Under Est: 15.7% $365,889.01
Amt Left: 27.98% $589,481.32
Delta: -6.08% -$154,628.32
Subcontractor Percentage Amount
LONE STAR EROSION CONTROL 10.86% $230,152.07
MB PRIME LLC 1.83% $38,782.53
HIGHWAY INFRASTRUCTURE SAFETY SERVICES, INC. 0.65% $13,775.22
GRATR LANDSCAPES, LTD. 0.59% $12,503.66
FIBERTEL, LLC 0.37% $7,841.28
B&T DEPENDABLE SERVICES LLC 0.17% $3,602.75
LOZANO CONSTRUCTION COMPANY, INC. 0.05% $1,059.63
Total: 14.52% $307,717.14

Bid Items & Bid Tabulations

84 Total 0 of 84
FRIO  |  BI 35-E  |  SAN ANTONIO  |  0017-15-028  |  04/04/2024  |  $2,330,443.31  |  STP 2024(938)HES  |  HAZARD ELIM & SAFETY  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E-Z BEL CONSTRUCTION, LLC
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
STX CIVIL
ACME BRIDGE COMPANY, INC.
ENCINO LANDSCAPE, INC.
TI-ZACK CONCRETE, LLC
PREPARING ROW
STA 63.000 $1,000.000 $400.000 $917.110 $2,729.000 $3,940.000 $1,000.000 $1,100.000
PREP ROW (TREE PRUNING)
EA 2.000 $1,000.000 $8,050.000 $2,172.450 $1,417.500 $4,610.000 $500.000 $110.000
REMOVING CONC (RIPRAP)
SY 45.000 $18.250 $1.000 $57.240 $16.000 $47.530 $50.000 $53.200
REMOVING CONC (SIDEWALKS)
SY 106.000 $18.000 $1.000 $24.300 $14.500 $47.300 $50.000 $22.580
REMOVING CONC (DRIVEWAYS)
SY 863.000 $27.500 $1.000 $34.470 $18.000 $20.400 $50.000 $27.740
REMOVING CONC (CURB)
LF 154.000 $15.000 $1.000 $14.410 $7.500 $4.980 $50.000 $10.360
REMOVE CONC (GUTTER)
LF 1,698.000 $6.000 $1.000 $12.280 $7.500 $5.800 $50.000 $14.100
REMOVING CONC (WHEELCHAIR RAMP)
SY 13.000 $40.000 $1.000 $69.260 $24.000 $86.100 $50.000 $61.380
REMOVING CONC (PAVERS)
SY 29.000 $25.000 $1.000 $31.050 $10.500 $15.100 $50.000 $27.520
REMOVING CONC (MOVABLE BARRIER)
LF 100.000 $25.000 $1.000 $84.860 $10.500 $50.600 $50.000 $44.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 1,840.000 $18.000 $9.000 $11.890 $8.500 $8.100 $50.000 $30.360
EXCAVATION (ROADWAY)
CY 45.000 $40.000 $25.000 $65.770 $10.500 $18.700 $50.000 $88.670
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 47.000 $110.000 $18.000 $70.560 $24.000 $17.900 $50.000 $105.890
COMPOST MANUF TOPSOIL (4")
SY 19,073.000 $12.000 $1.000 $5.950 $4.000 $3.300 $5.000 $3.600
BLOCK SODDING
SY 19,073.000 $7.500 $6.000 $6.940 $10.000 $7.100 $5.000 $6.600
VEGETATIVE WATERING
MG 309.000 $45.000 $80.000 $57.120 $71.000 $66.900 $5.000 $1.100
PLANE ASPH CONC PAV (4")
SY 140.000 $20.000 $41.000 $66.680 $21.500 $44.500 $20.000 $13.200
RIPRAP (CONC)(4 IN)
CY 28.000 $800.000 $1,959.000 $988.700 $693.500 $631.000 $500.000 $1,110.570
RAIL (HANDRAIL)(TY B)
LF 368.000 $150.000 $94.000 $104.640 $120.000 $114.000 $360.000 $115.500
ADJUSTING MANHOLES
EA 3.000 $2,000.000 $900.000 $2,357.150 $2,442.500 $2,500.000 $1,000.000 $1,330.000
MOBILIZATION
LS 1.000 $239,556.600 $172,000.000 $281,751.550 $155,000.000 $196,000.000 $240,000.000 $263,461.140
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $4,500.000 $1,500.000 $11,874.050 $2,393.500 $6,270.000 $5,000.000 $2,750.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 41.000 $38.000 $34.000 $69.920 $141.500 $40.200 $50.000 $0.010
ROCK FILTER DAMS (REMOVE)
LF 41.000 $11.000 $16.000 $63.210 $71.000 $18.800 $10.000 $0.010
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 562.000 $25.000 $39.000 $59.770 $66.500 $46.100 $50.000 $1.100
CONSTRUCTION EXITS (REMOVE)
SY 562.000 $12.750 $8.000 $28.810 $21.500 $9.700 $10.000 $0.010
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,822.000 $3.700 $2.000 $4.990 $5.500 $2.850 $10.000 $0.010
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,822.000 $0.600 $1.000 $1.140 $1.500 $1.250 $1.000 $0.010
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 200.000 $6.000 $9.000 $6.080 $10.000 $11.100 $10.000 $0.010
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,950.000 $10.000 $9.000 $5.530 $13.000 $10.300 $10.000 $0.010
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,150.000 $4.000 $2.000 $1.130 $2.000 $2.550 $1.000 $0.010
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 20.000 $8.000 $6.000 $109.430 $21.500 $82.900 $100.000 $110.000
LANDSCAPE PAVERS
SY 123.000 $90.000 $135.000 $191.100 $106.500 $130.000 $140.000 $165.000
CONC CURB (TY I)
LF 296.000 $17.500 $22.000 $29.840 $49.000 $36.400 $30.000 $67.750
CONC CURB & GUTTER (TY I)
LF 448.000 $50.000 $40.000 $45.500 $55.000 $37.400 $45.000 $67.750
DRIVEWAYS (CONC)
SY 3,188.000 $125.000 $110.000 $104.680 $106.500 $107.000 $120.000 $146.060
CONC SIDEWALKS (4")
SY 9,119.000 $70.000 $96.000 $63.530 $81.500 $94.500 $80.000 $133.600
CURB RAMPS (TY 2)
EA 1.000 $3,500.000 $3,100.000 $3,036.270 $2,500.000 $2,030.000 $2,000.000 $2,363.450
CURB RAMPS (TY 10)
EA 10.000 $3,500.000 $3,500.000 $2,833.840 $2,500.000 $2,050.000 $2,000.000 $2,363.450
CURB RAMPS (TY 21)
EA 2.000 $2,500.000 $3,500.000 $3,009.090 $2,500.000 $2,900.000 $3,000.000 $2,363.450
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 1.000 $325.000 $325.000 $474.010 $482.000 $372.000 $400.000 $357.500
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 6.000 $450.000 $865.000 $970.920 $701.500 $991.000 $600.000 $951.500
RELOCATE EXISTING MAILBOX
EA 20.000 $350.000 $350.000 $390.830 $390.000 $401.000 $300.000 $385.000
CONDT (PVC) (SCH 80) (2")
LF 395.000 $22.970 $28.000 $49.790 $42.500 $34.400 $20.000 $33.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 110.000 $41.410 $27.000 $62.660 $92.000 $74.400 $40.000 $71.500
CONDT (PVC) (SCH 80) (3") (BORE)
LF 220.000 $35.890 $39.000 $62.130 $49.500 $40.100 $50.000 $38.500
ELEC CONDR (NO.6) BARE
LF 420.000 $2.160 $3.000 $3.140 $2.000 $1.700 $3.000 $1.650
ELEC CONDR (NO.6) INSULATED
LF 1,290.000 $2.230 $3.000 $3.060 $2.500 $1.900 $4.000 $1.820
TRAY CABLE (4 CONDR) (12 AWG)
LF 1,070.000 $2.350 $3.000 $3.740 $4.000 $3.150 $5.000 $3.030
ZINC-COAT STL WIRE STRAND (3/16")
LF 200.000 $5.000 $5.000 $8.830 $5.500 $4.350 $6.000 $4.180
ZINC-COAT STL WIRE STRAND (5/16")
LF 200.000 $4.260 $5.000 $8.830 $6.000 $4.690 $8.000 $4.510
REMOVE ELECTRICAL SERVICES
EA 1.000 $589.800 $485.000 $886.510 $793.500 $641.000 $8,000.000 $616.000
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
EA 1.000 $9,256.000 $11,970.000 $12,029.510 $10,204.500 $8,250.000 $8,000.000 $7,920.000
ALUMINUM SIGNS (TY A)
SF 36.000 $32.150 $44.000 $57.140 $36.000 $48.050 $50.000 $71.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $850.000 $835.000 $927.460 $942.500 $956.000 $800.000 $495.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 22.000 $650.000 $650.000 $720.300 $786.500 $744.000 $800.000 $495.000
RELOCATE SM RD SN SUP&AM TY S80
EA 3.000 $800.000 $895.000 $1,020.120 $857.500 $1,030.000 $800.000 $495.000
REMOVE SM RD SN SUP&AM
EA 2.000 $125.000 $115.000 $184.760 $163.000 $132.000 $200.000 $495.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 582.000 $12.000 $5.000 $20.000 $14.500 $11.800 $12.000 $5.890
PAVEMENT SEALER 24"
LF 582.000 $4.000 $2.000 $10.100 $5.500 $4.400 $4.000 $2.200
ELIM EXT PAV MRK & MRKS (24")
LF 410.000 $4.000 $2.000 $9.080 $5.000 $3.900 $8.000 $1.940
PAV SURF PREP FOR MRK (24")
LF 582.000 $2.000 $1.000 $5.700 $2.000 $1.450 $5.000 $0.720
VEH SIG SEC (12")LED(YEL)
EA 12.000 $269.650 $386.000 $482.710 $347.000 $281.000 $500.000 $269.500
PED SIG SEC (LED)(COUNTDOWN)
EA 6.000 $675.820 $854.000 $1,174.420 $850.500 $687.000 $1,000.000 $660.000
BACK PLATE (12")(1 SEC)
EA 12.000 $109.310 $182.000 $174.710 $177.000 $143.000 $100.000 $137.500
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 3,090.000 $2.430 $3.000 $3.340 $3.500 $2.700 $3.000 $2.590
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 1,495.000 $1.980 $2.000 $2.280 $2.500 $2.000 $4.000 $1.930
PED POLE ASSEMBLY
EA 6.000 $2,451.980 $2,311.000 $4,859.420 $3,543.000 $2,860.000 $3,000.000 $2,750.000
REMOVE PED POLE ASSEMBLY
EA 1.000 $927.230 $643.000 $309.010 $560.000 $452.000 $1,000.000 $434.500
PED DETECT PUSH BUTTON (APS)
EA 6.000 $1,426.010 $1,087.000 $1,251.420 $1,204.500 $973.000 $1,400.000 $935.000
REMOVAL OF CABLES
LF 3,485.000 $2.000 $1.000 $1.460 $1.500 $1.140 $3.000 $1.100
REMOVAL OF SIGNAL RELATED SIGNS
EA 6.000 $121.820 $215.000 $87.620 $85.000 $68.700 $100.000 $275.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 9.000 $122.340 $143.000 $81.150 $49.500 $40.100 $100.000 $38.500
REPLACE OF LUMINAIRE HEAD
EA 2.000 $433.300 $1,154.000 $993.260 $1,197.500 $968.000 $800.000 $929.500
REMOVE VID IMAGE VEH DET SYS (VIVDS)
EA 2.000 $428.470 $268.000 $195.760 $793.500 $641.000 $800.000 $616.000
REMOV PED SIG LED TRAF SIG LAMP UNIT
EA 9.000 $420.000 $215.000 $81.150 $517.500 $418.000 $500.000 $401.500
FULL - WIDTH MOWING
CYC 2.000 $2,250.000 $2,000.000 $2,744.650 $8,503.500 $3,440.000 $5,000.000 $1.100
LITTER REMOVAL
CYC 6.000 $1,750.000 $860.000 $3,067.540 $35.500 $1,810.000 $2,500.000 $1.100
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 6.000 $1,200.000 $1,000.000 $4,436.510 $1,700.500 $573.000 $3,500.000 $1.100
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 42.000 $200.000 $72.000 $380.700 $103.500 $158.000 $300.000 $1.100
CONDUIT (PREPARE)
LF 440.000 $5.090 $2.000 $2.960 $3.000 $2.300 $4.000 $2.200
GROUND BOX (PREPARE)
EA 6.000 $619.030 $270.000 $228.420 $354.500 $286.000 $600.000 $275.000
GROUND BOX (ADJUST)
EA 2.000 $460.000 $450.000 $1,004.260 $1,594.500 $1,290.000 $600.000 $1,237.500
TMA (STATIONARY)
DAY 141.000 $200.000 $250.000 $223.230 $343.000 $150.000 $300.000 $1.100
Totals: $2,330,443.310 $2,106,851.000 $2,326,525.880 $2,351,743.500 $2,460,212.470 $2,541,704.000 $2,696,332.320