Show Job Controls
Bid Cobra

FREESTONE IH0045 (6480-37-001)

Items: 38

County: FREESTONE
Length: 0.0100 MILES
Highway: IH0045
District: BRYAN
Control Number: 6480-37-001
DBE Goal: N/A
Project: BPM - A00214129
Guaranty: $9,000.00
Time: 61 WORKING DAYS
Engineer's Estimate: $451,815.00
Date: 07/09/2025 (11 months ago) Changed
Contract Number: 7251704
Type: BRIDGE PREVENTATIVE MAINTENANCE
Project ID: A00214129
Project Description: BRIDGE PREVENTATIVE MAINTENANCE FOR LOCATIONS ON IH 45 SOUTH OF FAIRFIELD
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
2591 NORTH EARL RUDDER FRWY, BRYAN, TX 77803
DELMY REYES
MATT HENSARLING
MICHAEL ESTILLETTE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$451,815.00
$405,446.60
Over/Under Est: -10.26% -$46,368.40
Over/Under Est: -5.45% -$24,643.00
Amt Left: 5.36% $21,725.40
$427,445.00
Over/Under Est: -5.39% -$24,370.00
Amt Left: 5.43% $21,998.40
Delta: -0.06% -$273.00
$459,840.00
Over/Under Est: 1.78% $8,025.00
Amt Left: 13.42% $54,393.40
Delta: -7.58% -$32,395.00
Over/Under Est: 4.25% $19,206.00
Amt Left: 16.17% $65,574.40
Delta: -2.43% -$11,181.00
Over/Under Est: 46.1% $208,270.00
Amt Left: 62.8% $254,638.40
Delta: -40.14% -$189,064.00

Bid Items & Bid Tabulations

38 Total 0 of 38
FREESTONE  |  IH0045  |  BRYAN  |  6480-37-001  |  07/09/2025  |  $451,815.00  |  BPM - A00214129  |  BRIDGE PREVENT MAINT  |  61 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CROSS PLUS CONSTRUCTION, LLC
BK FIELD OPERATIONS LLC
ROAD DOCTORS LLC
RHINO EQUITY, LLC
PATHFIELD INVESTMENTS LLC
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
REMOV CONC (RIPRAP)
SY 131.000 $30.000 $25.000 $65.000 $30.000 $30.000 $20.000 $50.000
EXCAV (ROADWAY & CHANNEL)
CY 80.000 $100.000 $55.000 $125.000 $30.000 $18.000 $30.000 $35.000
EMBANK (VEH)(OC)(TY A)
CY 522.000 $30.000 $41.000 $25.000 $55.000 $70.000 $150.000 $75.000
FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH)
CY 210.000 $55.000 $42.000 $140.000 $150.000 $100.000 $60.000 $100.000
CEM STABIL BKFL
CY 89.000 $250.000 $325.000 $300.000 $200.000 $200.000 $280.000 $750.000
FLOWABLE BACKFILL
CY 6.300 $500.000 $566.000 $400.000 $350.000 $300.000 $230.000 $750.000
TEMPORARY SPL SHORING
SF 160.000 $35.000 $55.000 $35.000 $20.000 $40.000 $30.000 $150.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 399.000 $35.000 $45.000 $50.000 $20.000 $70.000 $30.000 $150.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 116.000 $240.000 $200.000 $140.000 $130.000 $180.000 $180.000 $350.000
CONC STR REPAIR (STANDARD)
SF 14.000 $300.000 $200.000 $150.000 $150.000 $150.000 $95.000 $400.000
RIPRAP (CONC)(4 IN)
CY 25.000 $800.000 $855.000 $575.000 $400.000 $700.000 $650.000 $850.000
RIPRAP (CONC)(FLUME)
CY 2.100 $1,500.000 $1,258.000 $1,000.000 $1,400.000 $1,000.000 $800.000 $850.000
RIPRAP (MOW STRIP)(4 IN)
CY 29.000 $550.000 $900.000 $525.000 $400.000 $800.000 $600.000 $850.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 110.000 $300.000 $250.000 $175.000 $200.000 $220.000 $180.000 $400.000
BEDDING MATERIAL (6 IN)
CY 56.000 $180.000 $125.000 $140.000 $200.000 $100.000 $250.000 $200.000
CONC BOX CULV (10 FT X 6 FT)(EXTEND)
LF 15.000 $1,800.000 $1,500.000 $2,400.000 $1,400.000 $1,000.000 $1,500.000 $5,000.000
RC PIPE (CL III)(24 IN)
LF 8.000 $200.000 $200.000 $550.000 $600.000 $130.000 $120.000 $350.000
WINGWALL (FW - S) (HW=5 FT)
EA 0.500 $12,500.000 $12,000.000 $15,000.000 $36,000.000 $10,000.000 $17,000.000 $7,500.000
WINGWALL (FW - S) (HW=9 FT)
EA 2.000 $25,000.000 $12,000.000 $8,000.000 $23,000.000 $35,000.000 $28,000.000 $8,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $2,800.000 $3,500.000 $4,800.000 $1,300.000 $2,000.000 $2,700.000 $3,000.000
REMOV STR (SET)
EA 1.000 $800.000 $1,000.000 $2,200.000 $300.000 $500.000 $1,000.000 $500.000
REMOV STR (WINGWALL)
EA 2.500 $2,000.000 $500.000 $1,000.000 $2,000.000 $5,000.000 $1,800.000 $1,500.000
REMOV STR (PIPE)
LF 12.000 $50.000 $25.000 $175.000 $50.000 $50.000 $25.000 $50.000
MOBILIZATION
LS 1.000 $40,000.000 $35,000.000 $75,000.000 $50,000.000 $25,000.000 $40,000.000 $60,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $7,000.000 $5,000.000 $1.000 $2,500.000 $5,000.000 $7,000.000 $4,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 61.000 $120.000 $40.000 $55.000 $150.000 $200.000 $300.000 $50.000
TMA (STATIONARY)
DAY 29.000 $200.000 $500.000 $1.000 $200.000 $150.000 $250.000 $300.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 500.000 $4.500 $1.000 $2.000 $3.000 $4.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 500.000 $1.500 $1.000 $1.000 $1.000 $1.000 $2.000 $2.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000 $6,500.000 $6,000.000 $14,000.000 $8,200.000 $10,000.000 $5,000.000 $10,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 338.000 $35.000 $42.000 $27.000 $30.000 $40.000 $30.000 $35.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 62.000 $110.000 $88.000 $100.000 $150.000 $70.000 $90.000 $130.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,300.000 $3,500.000 $3,500.000 $3,500.000 $4,000.000 $3,100.000 $5,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $50.000 $50.000 $25.000 $80.000 $110.000 $40.000 $50.000
TREE REMOVAL (4" - 12" DIA)
EA 20.000 $300.000 $200.000 $250.000 $250.000 $200.000 $65.000 $500.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 174.000 $100.000 $55.000 $45.000 $80.000 $50.000 $20.000 $65.000
CARBON FIBER REINF POLYMER PROTECTION
SF 19.000 $180.000 $125.000 $450.000 $500.000 $450.000 $68.000 $225.000
MAINTENANCE SPEED LIMIT SIGNING
DAY 13.000 $250.000 $200.000 $1.000 $150.000 $50.000 $200.000 $50.000
Totals: $451,815.000 $405,446.600 $427,172.000 $427,445.000 $459,840.000 $471,021.000 $660,085.000