FREESTONE IH0045 (6456-43-001)

Items: 47

County: FREESTONE
Length: N/A
Highway: IH0045
District: BRYAN
Control Number: 6456-43-001
DBE Goal: N/A
Project: RMC - 645643001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $602,230.00
Date: 11/01/2023 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
MICHAEL ESTILLETTE
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$602,230.00
$440,007.00
Over/Under Est: -26.94% -$162,223.00
Over/Under Est: -17.99% -$108,340.00
Amt Left: 12.25% $53,883.00
Over/Under Est: 34.27% $206,390.00
Amt Left: 83.77% $368,613.00
Delta: -63.72% -$314,730.00

Bid Items & Bid Tabulations

47 Total 0 of 47
FREESTONE  |  IH0045  |  BRYAN  |  6456-43-001  |  11/01/2023  |  $602,230.00  |  RMC - 645643001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
DIGG COMMERCIAL, LLC
ISI CONTRACTING, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 15.000 $650.000 $100.000 $500.000 $475.000
MOBILIZATION (CALLOUT)
EA 20.000 $500.000 $1.000 $1.000 $263.000
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $40.000 $25.000 $20.000 $40.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $38.000 $30.000 $20.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,400.000 $1,000.000 $500.000 $1,195.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 50.000 $15.000 $1.000 $50.000 $1.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,800.000 $1.000 $900.000 $1,116.000
REMOVE METAL BEAM GUARD FENCE
LF 175.000 $8.000 $1.000 $1.000 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $260.000 $1.000 $250.000 $18.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $65.000 $1.000 $250.000 $37.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $3,400.000 $4,000.000 $1,100.000 $2,400.000
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $360.000 $1.000 $1.000 $18.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 3,500.000 $34.000 $25.000 $10.000 $7.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 110.000 $33.000 $1.000 $40.000 $16.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 30.000 $35.000 $1.000 $100.000 $34.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 25.000 $40.000 $30.000 $50.000 $31.000
RAISE RAIL ELEMENT
LF 500.000 $6.000 $1.000 $1.000 $1.000
REM / REPL TIMBER POST W / O CONC FND
EA 100.000 $40.000 $1.000 $40.000 $11.000
REM / REPL STEEL POST W / O CONC FND
EA 25.000 $58.000 $1.000 $70.000 $74.000
REM / REPL TIMBER POST W / CONC FND
EA 25.000 $38.000 $1.000 $70.000 $35.000
REM / REPL STEEL POST W / CONC FND
EA 10.000 $110.000 $1.000 $200.000 $74.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $150.000 $1.000 $300.000 $405.000
REALIGN POSTS
EA 100.000 $30.000 $1.000 $20.000 $5.000
REMOVE & REPLACE BLOCKOUT
EA 300.000 $40.000 $10.000 $1.000 $14.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 15.000 $7.000 $1.000 $50.000 $14.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 300.000 $55.000 $20.000 $15.000 $26.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 15.000 $120.000 $50.000 $100.000 $28.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 30.000 $4,100.000 $4,000.000 $900.000 $2,400.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,000.000 $600.000 $400.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $175.000 $1.000 $1.000 $15.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $70.000 $1.000 $100.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $30.000 $1.000 $100.000 $79.000
REPLACE SGT STRUT
EA 10.000 $35.000 $1.000 $100.000 $72.000
REPLACE SGT OBJECT MARKER
EA 10.000 $37.000 $1.000 $100.000 $23.000
REMOVE AND REPLACE DAT
EA 10.000 $1,400.000 $1,000.000 $800.000 $1,050.000
REPLACE POSTS (TL-4)
EA 250.000 $160.000 $200.000 $160.000 $315.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $130.000 $1.000 $1.000 $335.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $150.000 $1.000 $1.000 $46.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,500.000 $1,000.000 $1,500.000 $3,300.000
REPLACE CABLE (TL-4)
LF 400.000 $3.000 $0.500 $1.000 $3.900
CHECK / RE-TENSION CABLE
EA 50.000 $150.000 $10.000 $1.000 $5.000
REPLACE POST HARDWARE (TL-4)
EA 100.000 $50.000 $1.000 $75.000 $36.000
REMOVE AND REPLACE (FASTRACC) (W)
EA 2.000 $28,000.000 $1.000 $18,000.000 $28,000.000
REPAIR (FASTRACC) (W)
LF 50.000 $200.000 $1.000 $50.000 $500.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 50.000 $50.000 $50.000 $50.000 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 15.000 $180.000 $1.000 $1,000.000 $370.000
TMA (STATIONARY)
DAY 50.000 $300.000 $1,000.000 $4,450.000 $7,500.000
Totals: $602,230.000 $440,007.000 $493,890.000 $808,620.000