FREESTONE IH0045 (6421-83-001)

Items: 43

County: FREESTONE
Length: N/A
Highway: IH0045
District: BRYAN
Control Number: 6421-83-001
DBE Goal: N/A
Project: RMC - 642183001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $503,280.00
Date: 11/02/2022 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$503,280.00
$382,055.00
Over/Under Est: -24.09% -$121,225.00
Over/Under Est: -4.85% -$24,404.00
Amt Left: 25.34% $96,821.00
Over/Under Est: -2.27% -$11,410.00
Amt Left: 28.74% $109,815.00
Delta: -2.71% -$12,994.00
Over/Under Est: 0.33% $1,645.00
Amt Left: 32.16% $122,870.00
Delta: -2.65% -$13,055.00
Over/Under Est: 15.2% $76,507.50
Amt Left: 51.75% $197,732.50
Delta: -14.83% -$74,862.50
Over/Under Est: 21.3% $107,211.25
Amt Left: 59.79% $228,436.25
Delta: -5.30% -$30,703.75

Bid Items & Bid Tabulations

43 Total 0 of 43
FREESTONE  |  IH0045  |  BRYAN  |  6421-83-001  |  11/02/2022  |  $503,280.00  |  RMC - 642183001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RHINO EQUITY, LLC
GARRET SHIELDS INFRASTRUCTURE
JCW CONSTRUCTION, LLC
ABOVE ALL CONSTRUCTION
ROY JORGENSEN ASSOCIATES, INC.
B & MS CONSTRUCTION, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 15.000 $550.000 $250.000 $400.000 $500.000 $400.000 $400.000 $450.000
MOBILIZATION (CALLOUT)
EA 20.000 $500.000 $1.000 $1,000.000 $1.000 $200.000 $2,750.000 $1,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $30.000 $30.000 $50.000 $100.000 $30.000 $30.000 $46.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $38.000 $30.000 $40.000 $100.000 $50.000 $35.000 $46.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,000.000 $1,300.000 $1,500.000 $2,000.000 $2,300.000 $2,200.000 $3,700.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 50.000 $13.000 $1.000 $20.000 $20.000 $20.000 $12.000 $16.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,600.000 $1,500.000 $1,000.000 $1,500.000 $2,000.000 $1,300.000 $1,550.000
REMOVE METAL BEAM GUARD FENCE
LF 175.000 $4.000 $1.000 $10.000 $100.000 $5.000 $15.000 $3.450
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $200.000 $1.000 $250.000 $250.000 $100.000 $300.000 $385.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $51.000 $1.000 $100.000 $500.000 $200.000 $300.000 $340.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $2,800.000 $2,700.000 $3,000.000 $3,000.000 $3,300.000 $2,800.000 $3,162.500
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $260.000 $1.000 $250.000 $500.000 $200.000 $250.000 $460.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 3,500.000 $30.000 $20.000 $25.000 $20.000 $27.000 $23.000 $34.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 110.000 $30.000 $15.000 $27.600 $50.000 $50.000 $37.500 $46.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 30.000 $40.000 $25.000 $8.000 $50.000 $50.000 $37.500 $51.750
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 25.000 $40.000 $25.000 $30.000 $50.000 $50.000 $37.500 $34.500
RAISE RAIL ELEMENT
LF 500.000 $15.000 $1.000 $8.000 $25.000 $10.000 $11.000 $8.630
REM / REPL TIMBER POST W / O CONC FND
EA 100.000 $20.000 $200.000 $100.000 $50.000 $50.000 $85.000 $160.000
REM / REPL STEEL POST W / O CONC FND
EA 25.000 $50.000 $45.000 $70.000 $75.000 $100.000 $100.000 $165.000
REM / REPL TIMBER POST W / CONC FND
EA 25.000 $30.000 $300.000 $100.000 $50.000 $100.000 $100.000 $345.000
REM / REPL STEEL POST W / CONC FND
EA 10.000 $150.000 $45.000 $100.000 $75.000 $100.000 $120.000 $360.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $200.000 $150.000 $400.000 $250.000 $300.000 $350.000 $316.250
REALIGN POSTS
EA 100.000 $30.000 $1.000 $32.000 $25.000 $50.000 $12.000 $28.750
REMOVE & REPLACE BLOCKOUT
EA 300.000 $30.000 $40.000 $30.000 $20.000 $20.000 $25.000 $28.750
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 15.000 $5.000 $200.000 $100.000 $25.000 $20.000 $25.000 $17.250
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 300.000 $40.000 $30.000 $25.000 $25.000 $35.000 $30.000 $40.250
REPLACE SINGLE GDRAIL TERMINAL POST
EA 15.000 $100.000 $65.000 $100.000 $50.000 $100.000 $150.000 $69.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 30.000 $4,500.000 $2,700.000 $4,000.000 $3,000.000 $3,900.000 $4,000.000 $3,950.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,100.000 $700.000 $1,000.000 $1,000.000 $1,000.000 $1,100.000 $1,437.500
REM & RESET SGT IMPACT HEAD
EA 10.000 $150.000 $1.000 $100.000 $100.000 $150.000 $250.000 $172.500
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $35.000 $20.000 $80.000 $100.000 $100.000 $120.000 $97.750
REPLACE SGT CABLE ANCHOR
EA 10.000 $20.000 $20.000 $80.000 $100.000 $100.000 $120.000 $97.750
REPLACE SGT STRUT
EA 10.000 $30.000 $20.000 $80.000 $100.000 $100.000 $120.000 $97.750
REPLACE SGT OBJECT MARKER
EA 10.000 $35.000 $20.000 $80.000 $20.000 $50.000 $50.000 $34.500
REMOVE AND REPLACE DAT
EA 10.000 $1,400.000 $1,250.000 $1,500.000 $1,500.000 $2,000.000 $1,400.000 $2,012.500
REPLACE POSTS (TL-4)
EA 250.000 $170.000 $130.000 $100.000 $200.000 $200.000 $165.000 $170.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $100.000 $50.000 $300.000 $100.000 $250.000 $500.000 $166.750
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $80.000 $75.000 $80.000 $50.000 $500.000 $500.000 $224.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,500.000 $1,350.000 $1,200.000 $1,500.000 $1,500.000 $2,000.000 $1,725.000
REPLACE CABLE (TL-4)
LF 400.000 $3.000 $5.000 $6.000 $1.000 $5.000 $10.000 $5.750
CHECK / RE-TENSION CABLE
EA 50.000 $150.000 $1.000 $200.000 $50.000 $100.000 $500.000 $488.750
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 15.000 $180.000 $50.000 $100.000 $200.000 $250.000 $250.000 $385.000
TMA (STATIONARY)
DAY 50.000 $300.000 $500.000 $500.000 $1,000.000 $300.000 $900.000 $375.000
Totals: $503,280.000 $382,055.000 $478,876.000 $491,870.000 $504,925.000 $579,787.500 $610,491.250