FREESTONE US0084 (6335-45-001)

Items: 43

County: FREESTONE
Length: N/A
Highway: US0084
District: BRYAN
Control Number: 6335-45-001
DBE Goal: N/A
Project: RMC - 633545001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $473,025.00
Date: 09/06/2018 (7 years ago)
Contract Number: N/A
Type: REPAIR OF METAL BEAM GUARD FENCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$473,025.00
$528,437.50
Over/Under Est: 11.71% $55,412.50
Over/Under Est: 27.88% $131,890.00
Amt Left: 14.47% $76,477.50

Bid Items & Bid Tabulations

43 Total 0 of 43
FREESTONE  |  US0084  |  BRYAN  |  6335-45-001  |  09/06/2018  |  $473,025.00  |  RMC - 633545001  |  REPAIR OF METAL BEAM GUARD FENCE  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DBI SERVICES, LLC
ISI CONTRACTING, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 25.000 $750.000 $276.000 $500.000
MOBILIZATION (CALLOUT)
EA 50.000 $300.000 $522.000 $900.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $22.500 $21.000 $21.000
MTL W-BEAM GD FEN (STEEL POST)
LF 250.000 $22.500 $26.000 $44.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,000.000 $1,412.000 $2,400.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 150.000 $6.000 $21.000 $11.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $4.000 $4.000 $1.500
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $200.000 $275.000 $1.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $200.000 $138.000 $130.000
GUARDRAIL END TREATMENT (INSTALL)
EA 50.000 $2,400.000 $2,500.000 $3,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 50.000 $250.000 $275.000 $250.000
GUARDRAIL END TRTMNT(RETRO)(STEEL POST)
EA 10.000 $1,000.000 $1,770.000 $2,850.000
GUARDRAIL END TRTMNT(RETRO)(WOOD POST)
EA 10.000 $1,000.000 $1,890.000 $2,850.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 100.000 $21.000 $15.000 $5.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 100.000 $21.000 $15.000 $5.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
EA 25.000 $21.000 $15.000 $5.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 25.000 $21.000 $15.000 $5.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
EA 25.000 $21.000 $15.000 $6.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,000.000 $15.000 $13.500 $15.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $10.000 $19.500 $1.500
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 25.000 $10.000 $40.000 $1.500
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 50.000 $18.000 $35.000 $21.000
RAISE RAIL ELEMENT
LF 250.000 $5.000 $5.000 $10.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 300.000 $40.000 $80.000 $39.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 40.000 $50.000 $110.000 $49.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $100.000 $425.000 $280.000
REALIGN POSTS
EA 200.000 $12.000 $38.000 $6.000
REMOVE & REPLACE BLOCKOUT
EA 50.000 $10.000 $35.000 $4.000
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
EA 50.000 $10.000 $35.000 $14.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,000.000 $20.000 $22.000 $29.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $55.000 $60.000 $40.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $60.000 $550.000 $10.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $75.000 $550.000 $10.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 30.000 $2,500.000 $2,550.000 $3,300.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $1,000.000 $440.000 $1,030.000
REM & RESET SGT IMPACT HEAD
EA 15.000 $150.000 $440.000 $125.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $100.000 $150.000 $110.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $80.000 $145.000 $110.000
REPLACE SGT STRUT
EA 10.000 $90.000 $130.000 $160.000
REPLACE SGT OBJECT MARKER
EA 10.000 $30.000 $50.000 $30.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 150.000 $80.000 $50.000 $110.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 20.000 $125.000 $440.000 $55.000
TMA (STATIONARY)
DAY 100.000 $300.000 $390.000 $285.000
Totals: $473,025.000 $528,437.500 $604,915.000