FREESTONE SH 75 (0166-02-047)

Items: 75

County: FREESTONE
Length: 0.0000 MILES
Highway: SH 75
District: BRYAN
Control Number: 0166-02-047
DBE Goal: 0.0%
Project: BR 2026(100)
Guaranty: $104,000.00
Time: 90 WORKING DAYS
Engineer's Estimate: $2,607,252.50
Date: 01/07/2026 (5 months ago)
Contract Number: 1263213
Type: BRIDGE MAINTENANCE
Project ID: A00211858
Contract Type: Federal
Project Description: RETROFIT RAIL, DECK OVERLAY, CLEAN & SEAL JOINTS, EROSION REPAIR AND SPALL REPAIRS
Mail/Deliver Bids To: N/A
DELMY REYES
MATT HENSARLING
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$2,607,252.50
$2,822,100.77
Over/Under Est: 8.24% $214,848.27
Over/Under Est: 9.37% $244,236.15
Amt Left: 1.04% $29,387.88
Over/Under Est: 18.44% $480,773.25
Amt Left: 9.42% $265,924.98
Delta: -8.30% -$236,537.10
Over/Under Est: 20.92% $545,420.65
Amt Left: 11.71% $330,572.38
Delta: -2.09% -$64,647.40
Subcontractor Percentage Amount
MORRIS COUNTY CONTRACTORS, L.L.C. 11.27% $318,050.76
BIG CREEK CONSTRUCTION, LTD. 11.05% $311,842.14
BECK-REIT & SONS, LTD. 8.04% $226,896.90
STRIPE-A-ZONE, LLC 4.90% $138,282.94
MACIAS SPECIALTY CONTRACTING LLC 4.07% $114,859.50
JB PINNACLE GROUP, LLC 3.01% $84,945.23
SUPERIOR TRAFFIC CONTROL, LLC 0.85% $23,987.86
SOUTHEAST GRINDING AND GROOVING LLC 0.82% $23,141.23
GLOBAL EROSION CONTROL, INC. 0.79% $22,294.60
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.47% $13,263.87
S&S BRIDGE PAINTING 0.44% $12,417.24
NELSON INDUSTRIAL SERVICES, INC. 0.33% $9,312.93
Total: 46.04% $1,299,295.20

Bid Items & Bid Tabulations

75 Total 0 of 75
FREESTONE  |  SH 75  |  BRYAN  |  0166-02-047  |  01/07/2026  |  $2,607,252.50  |  BR 2026(100)  |  BRIDGE MAINT  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
RAGLE CONSTRUCTION, INC.
STRUCTURAL INTEGRITY GROUP LLC
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
PREPARING ROW
STA 2.000 $2,000.000 $2,200.000 $100,000.000 $2,750.000 $1,000.000
REMOV CONC (CURB)
LF 112.000 $20.000 $78.000 $13.000 $15.000 $15.000
EMBANK (VEH)(OC)(TY C)
CY 83.000 $65.000 $60.500 $60.000 $30.000 $25.000
FURN & PLACE TOPSOIL (4")
SY 5,802.000 $5.750 $6.000 $1.750 $8.750 $12.500
BROADCAST SEED (PERM_RURAL_CLAY)
SY 5,802.000 $0.750 $0.550 $0.450 $1.000 $1.500
VEGETATIVE WATERING
TGL 2.000 $52.000 $550.000 $250.000 $500.000 $300.000
SP MIXES SP-C SAC-A PG70-22
TON 1,022.000 $118.000 $198.000 $220.000 $180.000 $210.000
TACK COAT
GAL 930.000 $4.000 $6.600 $8.000 $6.000 $8.000
PLANE ASPH CONC PAV(0" TO 4")
SY 2,558.000 $6.000 $6.600 $5.000 $14.250 $10.000
PLANE ASPH CONC PAV(0" TO 6")
SY 1,391.000 $10.000 $7.700 $9.000 $19.500 $10.000
PLANE ASPH CONC PAV(0" TO 8")
SY 8,401.000 $11.000 $8.800 $7.500 $13.250 $10.000
CEM STABIL BKFL
CY 56.000 $265.000 $302.500 $130.000 $345.000 $400.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 3,324.000 $32.000 $1.000 $1.000 $40.000 $30.000
CL C CONC(PILE ENCASEMENT)
LF 115.000 $890.000 $500.000 $365.000 $325.000 $1,500.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 320.000 $17.000 $48.400 $18.000 $22.000 $30.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 86.000 $200.000 $148.500 $175.000 $198.000 $325.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 740.000 $100.000 $10.000 $40.000 $118.000 $325.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 310.000 $170.000 $50.000 $75.000 $145.000 $325.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 293.000 $350.000 $176.000 $125.000 $221.000 $275.000
CONC STR REPAIR (STANDARD)
SF 100.000 $150.000 $176.000 $175.000 $150.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 151.000 $750.000 $627.000 $520.000 $675.000 $650.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 178.000 $250.000 $200.200 $190.000 $325.000 $250.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 78.000 $245.000 $203.500 $190.000 $240.000 $250.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,096.000 $30.000 $26.400 $30.000 $65.000 $60.000
POLYESTER POLYMER CONC OVERLAY (3/4")
SY 2,910.000 $108.000 $167.000 $165.000 $157.000 $115.000
MISC NON-BRIDGE (NBIS)
LB 224.000 $25.000 $45.000 $30.000 $353.000 $50.000
RETROFIT RAIL (TY T221)
LF 228.000 $225.000 $408.000 $200.000 $295.000 $200.000
RETROFIT RAIL (TY T131RC)
LF 1,183.000 $232.000 $178.200 $175.000 $203.000 $235.000
PIPE (GALV) (4 IN X 6 IN)
LF 19.000 $250.000 $575.000 $95.000 $150.000 $525.000
MOBILIZATION
LS 1.000 $260,000.000 $283,000.000 $280,000.000 $303,000.000 $220,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $4,000.000 $38,500.000 $35,000.000 $7,625.000 $3,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 144.000 $95.000 $115.000 $100.000 $50.000 $60.000
TMA (STATIONARY)
DAY 90.000 $300.000 $500.000 $250.000 $200.000 $300.000
TMA (MOBILE OPERATION)
DAY 8.000 $500.000 $500.000 $600.000 $500.000 $300.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 624.000 $20.000 $22.000 $45.000 $45.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 624.000 $10.000 $11.000 $12.000 $10.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,050.000 $4.000 $7.700 $5.000 $4.500 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,050.000 $1.000 $2.200 $1.500 $1.000 $2.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 3.000 $6,000.000 $6,500.000 $5,000.000 $10,000.000 $8,500.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 450.000 $80.000 $66.000 $150.000 $59.000 $110.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,050.000 $35.000 $45.000 $10.000 $12.000 $30.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 450.000 $45.000 $45.000 $20.000 $40.000 $30.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,462.500 $31.000 $22.550 $30.500 $22.500 $27.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,450.000 $1,677.500 $2,750.000 $2,200.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 1,225.000 $6.000 $2.750 $5.000 $3.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 15.000 $275.000 $165.000 $500.000 $150.000 $225.000
RM MTL BM GD FEN TRANS (T101)
EA 12.000 $600.000 $165.000 $500.000 $125.000 $225.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,400.000 $3,300.000 $3,750.000 $2,950.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $530.000 $220.000 $500.000 $250.000 $350.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,500.000 $2,200.000 $1,250.000 $1,100.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,500.000 $1,100.000 $1,250.000 $1,100.000 $1,300.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 2.000 $7,250.000 $9,350.000 $10,000.000 $8,750.000 $11,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 4.000 $25.000 $19.800 $30.000 $20.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 37.000 $35.000 $27.500 $40.000 $25.000 $30.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 3,620.000 $1.500 $1.070 $1.250 $0.970 $1.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 288.000 $10.000 $1.380 $12.000 $1.250 $15.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 28,800.000 $2.000 $1.070 $1.250 $0.970 $1.400
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,065.000 $1.500 $2.000 $1.000 $2.000 $0.010
RE PM TY II (W) 6" (SLD)
LF 21,680.000 $0.650 $0.440 $1.000 $0.400 $1.000
RE PM TY II (Y) 6" (BRK)
LF 6,390.000 $0.400 $0.500 $1.000 $0.450 $1.000
RE PM TY II (Y) 6" (SLD)
LF 7,610.000 $0.650 $0.440 $1.000 $0.400 $1.000
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
LF 24,840.000 $1.500 $0.940 $0.950 $0.850 $1.600
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
LF 7,750.000 $1.500 $0.940 $0.950 $0.850 $1.600
RE PROFILE PM TY I(Y)6"(BRK)(090MIL)
LF 6,945.000 $1.500 $0.990 $0.950 $0.900 $1.600
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 2,940.000 $0.800 $0.830 $0.950 $0.750 $1.200
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 330.000 $1.000 $0.880 $0.950 $0.800 $1.200
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 715.000 $0.900 $0.830 $0.950 $0.750 $1.200
PREFAB PM TY C (W)(24")(SLD)
LF 950.000 $20.000 $14.580 $12.000 $13.250 $20.000
REFL PAV MRKR TY II-A-A
EA 1,752.000 $7.000 $5.500 $8.000 $5.000 $10.000
ELIM EXT PM & MRKS (4")
LF 39,670.000 $1.000 $0.580 $1.250 $0.530 $0.600
PAV SURF PREP FOR MRK (6")
LF 35,780.000 $0.500 $0.390 $0.500 $0.350 $0.150
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 3.000 $100.000 $55.000 $350.000 $500.000 $120.000
REP STL BRIDGE MBR (STRAIGHTEN MEMB)
EA 23.000 $1,400.000 $1,600.000 $2,000.000 $7,250.000 $1,500.000
CARBON FIBER REINF POLYMER STRENGTHNING
SF 454.000 $120.000 $182.000 $75.000 $203.000 $135.000
STEEL BRIDGE ZONE PAINTING
LS 1.000 $5,300.000 $132,550.000 $81,000.000 $98,000.000 $115,000.000
Totals: $2,607,252.500 $2,822,100.765 $2,851,488.650 $3,088,025.750 $3,152,673.150