FRANKLIN FM 21 (0633-01-025)

Items: 120

County: FRANKLIN
Length: 8.0400 MILES
Highway: FM 21
District: PARIS
Control Number: 0633-01-025
DBE Goal: 0.0%
Project: C 633-1-25
Guaranty: $100,000.00
Time: 370 WORKING DAYS
Engineer's Estimate: $12,271,309.38
Date: 04/03/2025 (1 year ago)
Contract Number: 4253007
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00187424
Project Description: REHAB
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JESSE HERRERA
DUSTIN LYDAY
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (9)
E
Engineer's Estimate
$12,271,309.38
$9,113,598.80
Over/Under Est: -25.73% -$3,157,710.58
Over/Under Est: -16.3% -$2,000,176.63
Amt Left: 12.7% $1,157,533.95
Over/Under Est: -11.68% -$1,433,197.56
Amt Left: 18.92% $1,724,513.02
Delta: -5.52% -$566,979.07
Over/Under Est: -10.24% -$1,256,128.57
Amt Left: 20.87% $1,901,582.01
Delta: -1.63% -$177,068.99
$11,301,761.78
Over/Under Est: -7.9% -$969,547.60
Amt Left: 24.01% $2,188,162.98
Delta: -2.60% -$286,580.97
Over/Under Est: -7.68% -$942,644.40
Amt Left: 24.31% $2,215,066.18
Delta: -0.24% -$26,903.20
$11,389,762.13
Over/Under Est: -7.18% -$881,547.25
Amt Left: 24.98% $2,276,163.33
Delta: -0.54% -$61,097.15
Over/Under Est: 7.67% $941,346.85
Amt Left: 44.98% $4,099,057.43
Delta: -16.00% -$1,822,894.10
Over/Under Est: 20.64% $2,532,978.52
Amt Left: 62.44% $5,690,689.10
Delta: -12.05% -$1,591,631.67
Subcontractor Percentage Amount
RICHARD DRAKE CONSTRUCTION COMPANY, L.P. 10.37% $945,080.20
BAHENA CONSTRUCTION CO., INC. 8.56% $780,124.06
WITHERS CONSTRUCTION, LLC 4.89% $445,654.98
J. H. ODEN CONTRACTING COMPANY 2.43% $221,460.45
TEXOP CONSTRUCTION 2.17% $197,765.09
STRIPING TECHNOLOGY, L.P. 1.85% $168,601.58
SOUTHWEST ENVIRONMENT SERVICES LLC 1.37% $124,856.30
MORRIS COUNTY CONTRACTORS, L.L.C. 0.71% $64,706.55
PANOLA SIGN & BARRICADE, INC. 0.48% $43,745.27
Total: 32.83% $2,991,994.48

Bid Items & Bid Tabulations

120 Total 0 of 120
FRANKLIN  |  FM 21  |  PARIS  |  0633-01-025  |  04/03/2025  |  $12,271,309.38  |  C 633-1-25  |  REHAB EXIST ROADWAY  |  370 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
H. H. HOWARD & SONS, INC.
A. K. GILLIS & SONS, LLC
D. L. LENNON INCORPORATED - CONTRACTOR
HIGHWAY 19 CONSTRUCTION LLC
H. V. CAVER, INC.
BAKER & COMPANY CONSTRUCTION, LLC
CDM HOLDINGS
LONGVIEW BRIDGE AND ROAD, LTD.
GREY SKY CONSTRUCTION LLC
PREPARING ROW
STA 425.000 $3,000.000 $1,050.000 $1,443.110 $1,568.840 $1,100.000 $2,000.000 $1,220.000 $2,000.000 $2,000.000 $2,824.000
REMOV CONC (DRIVEWAYS)
SY 889.000 $25.000 $25.000 $12.000 $12.000 $25.000 $12.360 $13.750 $35.000 $20.000 $30.000
OBLITERATING ABANDONED ROAD
SY 2,392.000 $25.000 $16.000 $17.380 $38.000 $35.000 $8.000 $14.900 $18.000 $15.000 $30.000
EXCAV (CHANNEL)
CY 203.000 $45.000 $25.000 $35.000 $65.000 $25.000 $50.000 $28.950 $80.000 $55.000 $100.000
SUBGR WIDEN (OC)
STA 274.000 $250.000 $200.000 $225.000 $311.000 $350.000 $750.000 $346.000 $500.000 $650.000 $450.000
EMBANK (VEH)(OC)(TY B)
CY 760.000 $27.500 $25.000 $35.000 $42.000 $30.000 $45.000 $29.350 $62.000 $60.000 $50.000
BACKFILL (TY A)
STA 425.000 $325.000 $500.000 $407.050 $453.000 $500.000 $325.000 $246.000 $380.000 $360.000 $450.000
ROAD GRADER WORK (ORD COMP)
STA 383.000 $300.000 $150.000 $225.000 $312.000 $350.000 $400.000 $170.000 $250.000 $300.000 $250.000
BROADCAST SEED (TEMP_WARM)
SY 117,884.000 $0.250 $0.180 $0.200 $0.170 $0.180 $0.120 $0.190 $0.200 $0.190 $0.500
BROADCAST SEED (TEMP_COOL)
SY 117,884.000 $0.250 $0.170 $0.200 $0.160 $0.180 $0.170 $0.200 $0.200 $0.180 $0.500
STRAW/HAY MLCH SEED(PERM_RURAL_SAND)
SY 235,768.000 $0.500 $0.250 $0.330 $0.250 $0.250 $0.400 $0.440 $0.300 $0.300 $0.500
VEGETATIVE WATERING
TGL 1,415.000 $20.000 $1.000 $5.000 $25.000 $50.000 $1.000 $1.000 $30.000 $15.000 $30.000
SOIL RET BLKT(SL_STEEP_SAND_LONG_ROLL)
SY 80.000 $7.000 $12.000 $10.000 $10.000 $15.000 $16.000 $11.000 $20.000 $11.000 $20.000
PROOF ROLLING
HR 46.000 $100.000 $100.000 $100.170 $75.000 $100.000 $165.000 $141.500 $240.000 $250.000 $150.000
FL BS (CMP IN PLC)(TY A GR 4) (8")
SY 115,699.000 $23.000 $18.850 $20.870 $22.900 $21.580 $27.120 $22.650 $18.500 $27.000 $23.000
REWORK BS MTL (TY C)(8")(ORD COMP)
SY 103,719.000 $3.500 $3.100 $2.350 $5.890 $1.800 $3.500 $5.250 $4.000 $4.000 $5.000
CEMENT
TON 1,350.000 $270.000 $250.000 $245.000 $275.000 $250.000 $244.000 $302.500 $267.250 $300.000 $300.000
CEMENT TRT (EXIST MATL & NEW BASE)(10")
SY 11,950.000 $3.000 $4.000 $2.350 $3.300 $4.500 $4.000 $5.550 $3.250 $4.250 $15.000
CEMENT TRT (NEW BASE)(6")
SY 103,749.000 $3.000 $3.000 $2.350 $3.300 $3.500 $3.500 $5.800 $3.000 $3.500 $8.000
FOG SEAL (CSS-1H)
GAL 22,063.000 $7.000 $3.850 $4.560 $4.000 $4.250 $6.010 $5.100 $3.850 $4.500 $8.000
ASPH (CHFRS-2P)
GAL 132,381.000 $4.250 $4.350 $5.060 $5.500 $4.650 $5.560 $5.750 $4.100 $5.000 $8.000
ASPH (RC-250)
GAL 41,186.000 $8.000 $5.250 $5.690 $7.500 $5.525 $6.540 $5.950 $7.500 $5.750 $8.000
AGGR (TY-B, GR-4)(SAC-A)
CY 1,226.000 $205.000 $120.000 $156.810 $132.700 $209.000 $116.100 $118.000 $125.000 $195.000 $250.000
AGGR (TY-B, GR-3)(SAC-B)
CY 1,401.000 $160.000 $120.000 $156.810 $132.700 $209.000 $116.100 $118.000 $125.000 $195.000 $250.000
AGGR (TY-B OR L, GR-5)
CY 1,051.000 $300.000 $110.000 $144.610 $120.200 $200.000 $104.000 $108.000 $115.000 $175.000 $250.000
SP MIXES SP-C SAC-A PG64-22
TON 1,966.000 $140.000 $140.000 $139.300 $139.300 $153.000 $140.000 $148.000 $140.000 $170.000 $185.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,750.000 $100.000 $71.000 $93.050 $88.050 $92.000 $70.800 $100.000 $100.000 $110.000 $85.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 1,200.000 $10.000 $12.000 $6.200 $6.500 $10.000 $10.000 $6.900 $15.000 $10.000 $20.000
FLOWABLE BACKFILL
CY 79.000 $260.000 $400.000 $275.000 $275.000 $350.000 $283.250 $355.000 $355.000 $320.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 220.000 $24.000 $25.000 $15.000 $15.000 $10.000 $15.450 $20.000 $20.000 $25.000 $10.000
TEMPORARY SPL SHORING
SF 170.000 $40.000 $110.000 $10.000 $100.000 $55.000 $42.500 $86.000 $58.000 $125.000 $85.000
RIPRAP (CONC)(5 IN)
CY 3.500 $650.000 $600.000 $700.000 $700.000 $1,000.000 $721.000 $1,375.000 $1,550.000 $1,500.000 $650.000
RIPRAP (MOW STRIP)(4 IN)
CY 178.000 $600.000 $675.000 $675.000 $675.000 $550.000 $695.250 $633.000 $725.000 $750.000 $550.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 210.000 $230.000 $300.000 $293.540 $290.000 $180.000 $228.000 $155.000 $245.000 $230.000 $160.000
JOINT SEALANT
LF 2,263.000 $25.000 $25.000 $20.000 $22.000 $35.000 $22.000 $46.000 $25.000 $30.000 $50.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 7.000 $650.000 $700.000 $1,000.000 $1,000.000 $1,000.000 $1,030.000 $825.000 $1,550.000 $2,750.000 $1,000.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 23.000 $1,050.000 $725.000 $1,050.000 $1,050.000 $600.000 $1,081.500 $880.000 $1,500.000 $2,500.000 $1,000.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 6.000 $920.000 $750.000 $1,150.000 $1,150.000 $1,000.000 $1,184.500 $1,045.000 $3,010.000 $3,500.000 $1,000.000
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
LF 14.000 $815.000 $1,300.000 $1,400.000 $1,400.000 $1,000.000 $1,442.000 $1,210.000 $1,650.000 $3,000.000 $1,000.000
RC PIPE (CL III)(18 IN)
LF 3,140.000 $50.000 $50.000 $52.000 $52.000 $46.000 $48.000 $65.000 $55.000 $75.000 $85.000
RC PIPE (CL III)(24 IN)
LF 142.000 $90.000 $80.000 $90.000 $90.000 $62.000 $75.000 $92.000 $93.000 $150.000 $105.000
RC PIPE (CL III)(30 IN)
LF 30.000 $125.000 $120.000 $120.000 $120.000 $100.000 $123.600 $206.000 $175.000 $200.000 $130.000
RC PIPE (CL III)(36 IN)
LF 34.000 $165.000 $160.000 $175.000 $175.000 $180.000 $180.250 $220.000 $205.000 $250.000 $200.000
RC PIPE (CL III)(42 IN)
LF 22.000 $215.000 $250.000 $220.000 $220.000 $210.000 $226.600 $317.000 $270.000 $350.000 $400.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 2.000 $5,000.000 $8,000.000 $6,000.000 $6,000.000 $6,000.000 $6,180.000 $6,325.000 $11,000.000 $10,500.000 $2,500.000
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 2.000 $6,000.000 $11,000.000 $8,500.000 $8,500.000 $9,500.000 $8,755.000 $10,505.000 $12,300.000 $14,000.000 $4,000.000
HEADWALL (CH - FW - 15) (DIA= 42 IN)
EA 2.000 $12,000.000 $15,000.000 $10,000.000 $10,000.000 $12,500.000 $10,300.000 $13,530.000 $13,100.000 $17,500.000 $8,500.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $8,600.000 $9,000.000 $8,000.000 $8,000.000 $9,000.000 $8,240.000 $8,775.000 $12,100.000 $11,000.000 $4,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $11,000.000 $12,000.000 $10,000.000 $10,000.000 $7,500.000 $10,300.000 $10,995.000 $13,700.000 $15,000.000 $4,000.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 2.000 $19,000.000 $15,000.000 $12,000.000 $12,000.000 $9,500.000 $12,360.000 $14,025.000 $14,700.000 $16,000.000 $6,000.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000 $7,500.000 $8,000.000 $7,000.000 $7,000.000 $4,500.000 $7,210.000 $6,435.000 $12,000.000 $11,000.000 $3,000.000
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 1.000 $9,400.000 $9,500.000 $8,500.000 $8,500.000 $5,500.000 $8,755.000 $8,800.000 $12,800.000 $12,000.000 $6,000.000
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 2.000 $11,000.000 $18,000.000 $11,000.000 $11,000.000 $6,000.000 $11,330.000 $12,320.000 $13,000.000 $15,000.000 $8,500.000
WINGWALL (FW - 0) (HW=4 FT)
EA 1.000 $9,300.000 $12,000.000 $7,000.000 $7,000.000 $10,177.000 $7,210.000 $10,780.000 $11,500.000 $14,000.000 $12,500.000
WINGWALL (FW - S) (HW=5 FT)
EA 4.000 $18,000.000 $13,000.000 $10,000.000 $10,000.000 $11,000.000 $10,300.000 $13,750.000 $12,000.000 $13,500.000 $15,000.000
WINGWALL (FW - S) (HW=6 FT)
EA 2.000 $20,000.000 $15,000.000 $12,000.000 $12,000.000 $13,367.000 $12,360.000 $20,350.000 $13,600.000 $16,500.000 $20,000.000
WINGWALL (PW - 2) (HW=4 FT)
EA 1.000 $11,500.000 $11,500.000 $14,000.000 $14,000.000 $9,000.000 $14,420.000 $14,850.000 $12,300.000 $14,500.000 $25,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $8,800.000 $11,500.000 $10,000.000 $10,000.000 $12,000.000 $10,300.000 $15,440.000 $14,600.000 $10,500.000 $15,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1)(C)
EA 1.000 $13,000.000 $11,500.000 $12,000.000 $12,000.000 $15,000.000 $12,360.000 $16,840.000 $15,000.000 $11,000.000 $18,500.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $1,000.000 $800.000 $750.000 $750.000 $700.000 $685.000 $1,480.000 $650.000 $1,000.000 $1,850.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 251.000 $800.000 $750.000 $825.000 $825.000 $800.000 $795.000 $920.000 $825.000 $1,100.000 $1,500.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $1,600.000 $1,500.000 $1,200.000 $1,200.000 $1,000.000 $1,055.000 $1,745.000 $880.000 $1,700.000 $2,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 6.000 $1,900.000 $1,200.000 $1,200.000 $1,200.000 $1,100.000 $1,160.000 $1,810.000 $915.000 $1,750.000 $2,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 12.000 $2,000.000 $1,600.000 $1,500.000 $1,500.000 $1,325.000 $1,375.000 $2,010.000 $1,350.000 $1,950.000 $2,500.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 3.000 $2,600.000 $2,000.000 $2,000.000 $2,000.000 $2,000.000 $2,060.000 $2,645.000 $1,400.000 $2,500.000 $3,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $3,200.000 $5,000.000 $5,000.000 $5,000.000 $4,000.000 $5,150.000 $4,140.000 $3,000.000 $4,750.000 $3,500.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 1.000 $3,800.000 $4,000.000 $2,800.000 $2,800.000 $2,500.000 $2,884.000 $3,755.000 $2,000.000 $3,500.000 $4,500.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 8.000 $4,800.000 $4,000.000 $5,000.000 $5,000.000 $3,600.000 $5,150.000 $4,288.000 $3,600.000 $4,000.000 $4,500.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 1.000 $6,000.000 $10,000.000 $7,000.000 $7,000.000 $6,000.000 $7,210.000 $6,837.000 $7,500.000 $6,500.000 $4,500.000
SET (TY II) (DES 1) (RCP) (4: 1) (C)
EA 1.000 $4,000.000 $5,000.000 $7,500.000 $7,500.000 $5,000.000 $7,725.000 $6,837.000 $10,000.000 $9,000.000 $4,000.000
CLEAN EXIST CULVERTS
EA 4.000 $2,500.000 $1,000.000 $1,200.000 $1,200.000 $2,500.000 $1,236.000 $1,019.000 $5,500.000 $6,500.000 $1,500.000
REMOV STR (WINGWALL)
EA 10.000 $2,000.000 $1,000.000 $1,000.000 $1,000.000 $1,000.000 $1,030.000 $2,615.000 $3,000.000 $1,750.000 $2,500.000
REMOV STR (HEADWALL)
EA 17.000 $2,000.000 $750.000 $1,000.000 $1,000.000 $500.000 $1,030.000 $719.000 $3,000.000 $1,500.000 $2,500.000
REMOV STR (PIPE)
LF 120.000 $50.000 $20.000 $10.000 $10.000 $50.000 $10.300 $34.000 $26.500 $20.000 $50.000
REMOV STR (PIPE)
EA 112.000 $600.000 $500.000 $225.000 $225.000 $500.000 $426.000 $364.000 $650.000 $500.000 $50.000
MOBILIZATION
LS 1.000 $1,116,747.670 $475,000.000 $816,387.010 $455,500.000 $1,200,000.000 $503,000.000 $610,000.000 $900,000.000 $950,000.000 $1,300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $6,500.000 $4,000.000 $8,700.000 $3,686.360 $12,018.000 $4,000.000 $12,000.000 $9,500.000 $30,000.000 $12,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,000.000 $15,000.000 $19,500.000 $20,000.000 $15,000.000 $5,000.000 $16,500.000 $24,000.000 $20,000.000 $16,500.000
TMA (STATIONARY)
DAY 740.000 $125.000 $100.000 $150.000 $235.000 $100.000 $250.000 $305.000 $125.000 $200.000 $250.000
TMA (MOBILE OPERATION)
DAY 20.000 $300.000 $500.000 $150.000 $150.000 $1,000.000 $250.000 $1,507.000 $150.000 $300.000 $550.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,995.000 $60.000 $45.000 $70.000 $35.000 $45.000 $35.000 $50.000 $50.000 $49.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 1,995.000 $35.000 $10.000 $15.000 $10.000 $10.000 $10.000 $11.000 $20.000 $12.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,145.000 $6.000 $5.000 $5.000 $3.200 $5.000 $3.200 $3.600 $5.750 $5.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,145.000 $1.600 $1.000 $2.500 $0.700 $1.000 $0.700 $1.100 $1.250 $2.000 $2.000
DRIVEWAYS (CONC)
SY 889.000 $114.000 $100.000 $95.000 $110.000 $110.000 $97.850 $237.000 $130.000 $135.000 $125.000
DRIVEWAYS (ACP)
SY 3,234.000 $62.000 $40.000 $56.570 $40.550 $50.000 $42.550 $63.000 $100.000 $60.000 $65.000
DRIVEWAYS (ACP) (TY 1)
SY 2,065.000 $75.000 $100.000 $95.450 $110.450 $110.000 $110.450 $91.500 $155.000 $100.000 $75.000
DRIVEWAYS (BASE)
SY 9,600.000 $36.000 $18.000 $31.020 $34.000 $25.000 $42.930 $14.500 $38.000 $35.000 $40.000
TURNOUTS (ACP)
SY 2,001.000 $86.000 $100.000 $103.500 $118.500 $113.000 $118.500 $110.000 $175.000 $90.000 $65.000
MTL W-BEAM GD FEN (STEEL POST)
LF 762.500 $32.000 $30.000 $25.000 $25.000 $28.000 $25.000 $27.500 $35.000 $28.000 $35.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 6.000 $850.000 $1,250.000 $1,225.000 $1,225.000 $1,500.000 $1,225.000 $1,350.000 $1,610.000 $1,500.000 $50.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,500.000 $3,100.000 $2,975.000 $2,975.000 $3,250.000 $2,975.000 $3,275.000 $3,600.000 $3,500.000 $3,520.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 2.000 $650.000 $700.000 $475.000 $735.000 $790.000 $688.040 $735.000 $499.500 $740.000 $850.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 69.000 $330.000 $330.000 $185.000 $355.000 $350.000 $336.810 $360.000 $340.000 $360.000 $850.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 12.000 $370.000 $375.000 $220.000 $400.000 $355.000 $383.160 $410.000 $510.000 $410.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 87.000 $700.000 $645.000 $625.000 $700.000 $650.000 $659.200 $704.000 $960.000 $705.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000 $850.000 $775.000 $780.000 $900.000 $745.000 $795.160 $850.000 $940.000 $850.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $1,200.000 $1,200.000 $1,100.000 $1,500.000 $860.000 $1,223.640 $1,307.000 $1,098.900 $1,300.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $1,000.000 $1,050.000 $950.000 $1,300.000 $1,200.000 $1,058.840 $1,130.000 $1,054.500 $1,150.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 5.000 $1,000.000 $1,075.000 $1,010.000 $1,400.000 $1,270.000 $1,100.040 $1,175.000 $1,076.700 $1,200.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $1,000.000 $1,010.000 $875.000 $1,300.000 $1,230.000 $1,037.210 $1,108.000 $999.000 $1,150.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 10.000 $1,000.000 $1,200.000 $965.000 $1,600.000 $1,500.000 $1,226.730 $1,310.000 $1,280.000 $1,350.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 4.000 $1,000.000 $1,200.000 $990.000 $1,700.000 $1,600.000 $1,202.010 $1,285.000 $1,500.000 $1,300.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $35.000 $30.000 $31.000 $31.000 $20.000 $31.000 $34.000 $34.000 $35.000 $100.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 72.000 $75.000 $85.000 $75.000 $91.000 $55.000 $82.400 $88.000 $78.000 $88.000 $100.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 7,314.000 $0.500 $0.500 $0.500 $0.500 $0.500 $0.510 $0.550 $0.520 $0.550 $2.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 50,157.000 $1.000 $0.500 $0.500 $0.500 $0.500 $0.510 $0.550 $0.520 $0.550 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,244.000 $2.000 $2.500 $2.450 $2.000 $1.000 $1.500 $2.250 $1.000 $2.000 $6.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 69.000 $6.000 $2.000 $2.000 $2.000 $2.000 $2.020 $2.200 $1.750 $2.200 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 750.000 $3.000 $2.000 $1.000 $1.000 $7.000 $1.010 $1.100 $1.350 $1.100 $6.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 268.000 $11.000 $7.000 $7.000 $7.000 $7.000 $7.070 $7.700 $15.500 $8.000 $20.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $250.000 $150.000 $150.000 $150.000 $150.000 $151.500 $165.000 $235.000 $165.000 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $260.000 $175.000 $175.000 $175.000 $175.000 $176.750 $192.500 $275.000 $195.000 $250.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 6.000 $60.000 $100.000 $100.000 $100.000 $100.000 $101.000 $110.000 $60.000 $110.000 $250.000
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 84,916.000 $1.250 $0.900 $0.900 $0.900 $0.900 $0.910 $1.000 $0.830 $1.000 $1.200
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 50,157.000 $1.500 $0.900 $0.900 $0.900 $0.900 $0.910 $1.000 $0.830 $1.000 $1.200
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 7,314.000 $1.390 $1.200 $1.200 $1.200 $1.200 $1.210 $1.300 $0.840 $1.350 $1.200
REFL PAV MRKR TY I-C
EA 46.000 $10.000 $6.000 $6.000 $6.000 $6.000 $6.060 $6.600 $5.960 $7.000 $6.000
REFL PAV MRKR TY II-A-A
EA 1,112.000 $8.500 $5.000 $5.000 $5.000 $5.000 $5.050 $5.500 $5.950 $5.500 $6.000
UNDERSEAL COURSE
GAL 4,471.000 $7.000 $7.450 $7.400 $7.400 $7.400 $7.400 $7.350 $7.500 $6.500 $6.000
Totals: $12,271,309.380 $9,113,598.800 $10,271,132.750 $10,838,111.820 $11,015,180.810 $11,301,761.780 $11,328,664.980 $11,389,762.130 $13,212,656.230 $14,804,287.900
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $223,349.53
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $111,674.76
Total: $335,024.29