FORT BEND US0059 (6471-90-001)

Items: 60

County: FORT BEND
Length: 0.0100 MILES
Highway: US0059
District: HOUSTON
Control Number: 6471-90-001
DBE Goal: N/A
Project: RMC - A00211693
Guaranty: $12,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $607,155.00
Date: 04/15/2025 (1 year ago)
Contract Number: 4251202
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00211693
Project Description: GUARDRAIL REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
7600 WASHINGTON AVE, HOUSTON, TX 77007
CARLOS ZEPEDA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$607,155.00
$427,543.00
Over/Under Est: -29.58% -$179,612.00
Over/Under Est: -20.78% -$126,153.00
Amt Left: 12.5% $53,459.00
Over/Under Est: 44.34% $269,220.00
Amt Left: 104.98% $448,832.00
Delta: -82.20% -$395,373.00
Over/Under Est: 121.9% $740,148.80
Amt Left: 215.13% $919,760.80
Delta: -53.74% -$470,928.80
Subcontractor Percentage Amount
ELITE CASTLE RESOURCES LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

60 Total 0 of 60
FORT BEND  |  US0059  |  HOUSTON  |  6471-90-001  |  04/15/2025  |  $607,155.00  |  RMC - A00211693  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROSS SA ENTERPRISE LLC
BK FIELD OPERATIONS LLC
ROY JORGENSEN ASSOCIATES, INC.
ELITE KINGS CONSTRUCTION, LLC
ASPHALT TRT BASE (GR 2)(PG 64)
TON 60.000 $125.000 $25.000 $30.000 $150.000 $200.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 100.000 $50.000 $25.000 $15.000 $200.000 $350.000
CONC STR REPAIR (STANDARD)
SF 100.000 $50.000 $25.000 $15.000 $250.000 $663.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $500.000 $100.000 $400.000 $900.000 $850.000
MOBILIZATION (CALLOUT)
EA 24.000 $50.000 $1.000 $1.000 $50.000 $1,170.000
MOBILIZATION (EMERGENCY)
EA 12.000 $750.000 $1.000 $1.000 $1,500.000 $3,120.000
TMA (STATIONARY)
DAY 150.000 $200.000 $1.000 $1.000 $250.000 $350.000
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
LF 180.000 $7.000 $20.000 $5.000 $40.000 $55.000
PORT CTB (MOVE)(SAFETY SH)(TY 2)
LF 2,000.000 $7.000 $10.000 $5.000 $15.000 $56.000
PORT CTB (REMOVE)(SAFETY SH)(TY 2)
LF 180.000 $10.000 $20.000 $5.000 $40.000 $150.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $850.000 $2,000.000 $2,000.000 $1,950.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,500.000 $100.000 $1,100.000 $1,250.000 $1,794.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $5.000 $80.000 $10.000 $50.000 $3.900
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $250.000 $800.000 $200.000 $2,000.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,200.000 $1,500.000 $3,000.000 $3,500.000 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $500.000 $1.000 $2,000.000 $5.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $20,000.000 $100.000 $5,000.000 $23,000.000 $20,000.000
CHAIN LINK FENCE (INSTALL) (6')
LF 100.000 $20.000 $8.000 $7.000 $40.000 $55.000
GATE (INSTALL)(6'X16')
EA 2.000 $500.000 $50.000 $25.000 $1,500.000 $1,800.000
GATE (INSTALL)(6'X10')
EA 2.000 $500.000 $50.000 $25.000 $1,500.000 $1,700.000
GATE (INSTALL)(6'X18')
EA 2.000 $500.000 $100.000 $25.000 $1,500.000 $1,600.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 1,000.000 $3.000 $0.100 $0.100 $8.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 2,000.000 $7.000 $0.100 $0.100 $5.000 $5.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 2,000.000 $3.000 $0.010 $0.100 $8.000 $5.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 2,000.000 $3.000 $0.010 $0.100 $8.000 $7.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 2,000.000 $10.000 $0.010 $0.100 $5.000 $8.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 3,600.000 $25.000 $38.000 $28.000 $20.000 $27.300
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 50.000 $30.000 $80.000 $35.000 $50.000 $46.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 25.000 $45.000 $1.000 $40.000 $175.000 $390.000
REPLACE TIMBER POST W/O CONC FND
EA 100.000 $30.000 $200.000 $150.000 $100.000 $156.000
REPLACE STEEL POST W/O CONC FND
EA 20.000 $50.000 $1.000 $10.000 $150.000 $110.000
REPLACE TIMBER POST W/ CONC FND
EA 300.000 $50.000 $1.000 $10.000 $110.000 $218.400
REPLACE STEEL POST W/ CONC FND
EA 100.000 $75.000 $1.000 $10.000 $150.000 $310.000
REALIGN POSTS
EA 200.000 $5.000 $1.000 $1.000 $15.000 $46.800
REPAIR OF TERMINAL ANCHORS POSTS
EA 4.000 $75.000 $1.000 $1.000 $350.000 $50.000
REPLACE TERMINAL ANCHOR POSTS
EA 4.000 $60.000 $1.000 $1.000 $350.000 $55.000
REM OBSOLETE GET & REPL W/ SGT
EA 8.000 $4,000.000 $6,500.000 $7,000.000 $4,000.000 $3,100.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 60.000 $900.000 $1.000 $450.000 $1,200.000 $1,482.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,000.000 $30.000 $10.000 $15.000 $32.000 $42.900
REPLACE SINGLE GDRAIL TERMINAL POST
EA 150.000 $100.000 $190.000 $275.000 $250.000 $76.440
REPLACE BLOCKOUT
EA 100.000 $75.000 $914.000 $800.000 $50.000 $39.000
REPAIR STEEL POST WITH BASE PLATE
EA 12.000 $150.000 $100.000 $75.000 $400.000 $273.000
RESET SGT IMPACT HEAD
EA 100.000 $80.000 $1.000 $1.000 $100.000 $454.400
REPLACE SGT OBJECT MARKER
EA 60.000 $30.000 $1.000 $1.000 $100.000 $117.000
REPLACE SGT CABLE ANCHOR
EA 60.000 $50.000 $1.000 $1.000 $150.000 $51.390
REPLACE SGT CABLE ASSEMBLY
EA 30.000 $75.000 $1.000 $300.000 $250.000 $146.640
REPLACE SGT STRUT
EA 14.000 $100.000 $1.000 $500.000 $250.000 $144.300
RAISE RAIL
LF 1,000.000 $5.000 $1.000 $1.000 $10.000 $20.000
REPLACE POSTS (TL-4)(NU-CABLE)
EA 60.000 $150.000 $100.000 $180.000 $200.000 $96.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $150.000 $500.000 $1,000.000 $500.000 $500.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 2.000 $65.000 $100.000 $1.000 $500.000 $66.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 2.000 $1,350.000 $2,500.000 $4,000.000 $2,000.000 $3,300.000
REPLACE CABLE (TL-4)
LF 100.000 $7.000 $5.000 $0.100 $1.000 $310.000
CHECK / RE-TENSION CABLE (TL-4)
EA 2.000 $150.000 $500.000 $1.000 $1,500.000 $96.000
REPLACE POST HARDWARE (TL-4)
EA 2.000 $250.000 $100.000 $750.000 $250.000 $96.000
REPAIR (STEEL PED. RAIL)
LF 100.000 $150.000 $10.000 $50.000 $200.000 $300.000
REPAIR (T4(S))
LF 160.000 $25.000 $10.000 $10.000 $120.000 $345.000
REPAIR (STL POST W/ BASE PLATE)(T4(S))
EA 80.000 $75.000 $10.000 $10.000 $100.000 $85.000
REPAIR (T4 (A))
LF 120.000 $20.000 $10.000 $10.000 $120.000 $145.000
REPAIR (ALUM POST W/ BASE PLATE)(T4(A))
EA 12.000 $50.000 $10.000 $10.000 $300.000 $450.000
Totals: $607,155.000 $427,543.000 $481,002.000 $876,375.000 $1,347,303.800