FORT BEND US0059 (6380-96-001)

Items: 26

County: FORT BEND
Length: N/A
Highway: US0059
District: HOUSTON
Control Number: 6380-96-001
DBE Goal: N/A
Project: RMC - 638096001
Guaranty: N/A
Time: 96 W
Engineer's Estimate: $408,116.50
Date: 01/07/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE PREVENTATIVE MAINTENANCE
Mail/Deliver Bids To: N/A
CARLOS ZEPEDA
DANIEL DVORAK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$408,116.50
$485,029.00
Over/Under Est: 18.85% $76,912.50
Over/Under Est: 20.7% $84,493.50
Amt Left: 1.56% $7,581.00
Over/Under Est: 34.09% $139,123.50
Amt Left: 12.83% $62,211.00
Delta: -11.09% -$54,630.00
Over/Under Est: 57.17% $233,316.00
Amt Left: 32.25% $156,403.50
Delta: -17.21% -$94,192.50

Bid Items & Bid Tabulations

26 Total 0 of 26
FORT BEND  |  US0059  |  HOUSTON  |  6380-96-001  |  01/07/2022  |  $408,116.50  |  RMC - 638096001  |  BRIDGE PREVENT MAINT  |  96 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
TALBRAN ENTERPRISES LLC
FNH CONSTRUCTION, LLC
NBG CONSTRUCTORS, INC.
REMOVING CONC (RIPRAP)
SY 565.000 $30.000 $17.500 $80.000 $100.000 $85.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 516.000 $75.000 $39.000 $30.000 $35.000 $55.000
CEM STABIL BKFL
CY 80.500 $200.000 $600.000 $150.000 $350.000 $175.000
FLOWABLE BACKFILL
CY 58.500 $250.000 $700.000 $300.000 $350.000 $600.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 480.000 $25.000 $37.000 $100.000 $85.000 $20.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 7.500 $130.000 $200.000 $250.000 $1,000.000 $200.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 1.340 $1,500.000 $3,900.000 $20,000.000 $1,000.000 $7,000.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 100.000 $460.000 $740.000 $700.000 $650.000 $1,500.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 244.000 $220.000 $300.000 $200.000 $185.000 $400.000
RIPRAP (MOW STRIP)(4 IN)
CY 26.000 $500.000 $770.000 $500.000 $500.000 $1,200.000
CLEANING EXISTING JOINTS
LF 66.000 $40.000 $18.000 $20.000 $35.000 $20.000
RETROFIT RAIL (TY T131RC)
LF 150.000 $200.000 $300.000 $215.000 $185.000 $600.000
MOBILIZATION
LS 1.000 $37,101.500 $48,000.000 $50,000.000 $50,000.000 $60,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $10,000.000 $1,350.000 $3,500.000 $8,500.000 $2,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $30.000 $26.000 $50.000 $25.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,900.000 $2,750.000 $1,850.000 $2,800.000
REMOVE METAL BEAM GUARD FENCE
LF 230.000 $2.000 $2.250 $5.000 $3.000 $10.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,200.000 $3,600.000 $3,800.000 $3,250.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $136.000 $500.000 $2,000.000 $300.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $50.000 $68.000 $65.000 $100.000 $60.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000 $12.000 $30.000 $30.000 $100.000 $30.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 800.000 $0.750 $5.500 $2.500 $8.000 $3.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 100.000 $0.750 $5.500 $2.500 $8.000 $3.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 2.000 $1,080.000 $2,865.000 $6,000.000 $15,000.000 $250.000
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
LF 20.000 $50.000 $68.000 $50.000 $1,000.000 $40.000
TMA (STATIONARY)
DAY 96.000 $300.000 $250.000 $300.000 $250.000 $75.000
Totals: $408,116.500 $485,029.000 $492,610.000 $547,240.000 $641,432.500