Show Job Controls
Bid Cobra

FORT BEND SH 99 (3510-04-053)

Items: 138

County: FORT BEND
Length: N/A
Highway: SH 99
District: HOUSTON
Control Number: 3510-04-053
DBE Goal: N/A
Project: NH 2017(247)
Guaranty: N/A
Time: 147 WORKING DAYS
Engineer's Estimate: $2,080,088.96
Date: 11/03/2016 (9 years ago)
Contract Number: N/A
Type: ADD UTN, LT TN LNS & REBUILD SIGNAL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$2,080,088.96
$2,240,983.05
Over/Under Est: 7.73% $160,894.09
$2,264,528.70
Over/Under Est: 8.87% $184,439.74
Amt Left: 1.05% $23,545.65
Over/Under Est: 9.11% $189,515.54
Amt Left: 1.28% $28,621.45
Delta: -0.22% -$5,075.80
Over/Under Est: 13.03% $270,999.04
Amt Left: 4.91% $110,104.95
Delta: -3.59% -$81,483.50
Over/Under Est: 17.04% $354,521.50
Amt Left: 8.64% $193,627.41
Delta: -3.55% -$83,522.46
Over/Under Est: 17.37% $361,259.89
Amt Left: 8.94% $200,365.80
Delta: -0.28% -$6,738.39
$3,236,793.25
Over/Under Est: 55.61% $1,156,704.29
Amt Left: 44.44% $995,810.20
Delta: -32.58% -$795,444.40

Bid Items & Bid Tabulations

138 Total 0 of 138
FORT BEND  |  SH 99  |  HOUSTON  |  3510-04-053  |  11/03/2016  |  $2,080,088.96  |  NH 2017(247)  |  ADD UTN, LT TN LNS & REBUILD SIGNAL  |  147 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MAR-CON SERVICES, LLC
ISI CONTRACTING, INC.
DURWOOD GREENE CONSTRUCTION CO.
ARANDA BROTHERS CONSTRUCTION CO., INC.
HASSELL CONSTRUCTION COMPANY, INC.
MAIN LANE INDUSTRIES LTD.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 29.130 $2,963.990 $6,876.300 $850.000 $800.000 $2,000.000 $2,300.000 $7,000.000 $5,000.000
REMOVING CONC (PAV)
SY 1,012.000 $6.250 $29.900 $20.000 $25.000 $10.000 $7.000 $20.000 $20.000
REMOVING CONC (RIPRAP)
SY 1,449.000 $9.650 $3.400 $4.000 $12.000 $11.000 $2.500 $7.000 $20.000
REMOVING CONC (CURB)
LF 3,867.000 $2.000 $1.800 $5.000 $5.000 $2.000 $1.000 $0.100 $12.500
REMOVING CONC (CURB OR CURB & GUTTER)
LF 856.000 $14.500 $3.100 $1.000 $10.000 $3.000 $1.000 $6.000 $12.500
REMOVING CONC (SIDEWALK OR RAMP)
SY 51.000 $5.000 $8.900 $2.000 $35.000 $10.000 $2.500 $9.000 $20.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 354.000 $4.620 $7.800 $4.000 $30.000 $15.000 $2.500 $10.000 $20.000
EXCAVATION (ROADWAY)
CY 3,234.000 $9.000 $10.500 $19.000 $12.000 $5.000 $20.000 $50.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 645.000 $13.000 $6.700 $15.000 $15.000 $15.000 $32.000 $8.000 $35.000
COMPOST MANUF TOPSOIL (4")
SY 4,741.000 $1.700 $0.800 $1.000 $1.250 $2.000 $1.500 $1.000 $3.500
BLOCK SODDING
SY 805.000 $4.000 $4.500 $4.500 $4.500 $5.000 $3.000 $10.000 $5.000
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 4,741.000 $0.170 $0.200 $1.000 $1.000 $1.000 $0.250 $0.250 $1.250
FERTILIZER
AC 1.070 $1,200.000 $1,056.100 $1,100.000 $1,000.000 $1,250.000 $750.000 $1,000.000 $2,000.000
VEGETATIVE WATERING
MG 130.000 $21.500 $85.300 $16.000 $40.000 $40.000 $25.000 $10.000 $30.000
LIME TRT (EXST MATL) (6")
SY 6,390.000 $3.000 $8.000 $5.000 $7.000 $4.000 $9.500 $8.000 $3.500
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 139.000 $156.470 $174.000 $170.000 $170.000 $185.000 $170.000 $150.000 $171.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 6,390.000 $15.000 $23.300 $20.000 $23.000 $15.000 $17.000 $20.000 $3.500
ASPHALT STAB BASE (GR 2)(PG 64)
TON 132.000 $69.820 $209.100 $167.000 $140.000 $170.000 $185.000 $125.000 $140.000
D-GR HMA(SQ) TY-D PG64-22
TON 242.000 $155.070 $141.300 $175.000 $150.000 $145.000 $125.000 $110.000 $140.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 50.000 $96.000 $123.400 $70.000 $160.000 $75.000 $385.000 $250.000 $200.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 2,579.000 $1.690 $9.300 $6.000 $7.500 $10.000 $2.500 $2.000 $20.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 5,654.000 $55.000 $74.500 $69.000 $74.000 $57.000 $64.000 $53.000 $105.000
FULL - DEPTH REPAIR CRCP (10")
SY 50.000 $191.450 $94.000 $300.000 $235.000 $120.000 $200.000 $300.000 $125.000
STRUCT EXCAV (PIPE)
CY 44.000 $14.270 $10.100 $23.000 $25.000 $40.000 $12.000 $10.000 $100.000
CEM STABIL BKFL
CY 57.000 $76.170 $50.100 $40.000 $70.000 $65.000 $41.000 $40.000 $140.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 121.000 $41.440 $50.000 $40.000 $70.000 $65.000 $41.000 $40.000 $140.000
TRENCH EXCAVATION PROTECTION
LF 90.000 $2.560 $1.600 $1.000 $5.000 $1.000 $17.000 $50.000 $3.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 60.000 $280.000 $373.100 $165.000 $200.000 $400.000 $331.000 $365.000 $425.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $375.000 $476.200 $350.000 $400.000 $500.000 $422.000 $450.000 $500.000
RIPRAP (CONC)(4 IN)
CY 579.000 $400.000 $375.800 $320.000 $350.000 $350.000 $400.000 $420.000 $550.000
STR STEEL (MISCELLANEOUS BRIDGE)
LB 418.000 $0.990 $10.000 $15.000 $14.000 $12.000 $12.000 $5.000 $15.000
RC PIPE (CL III)(18 IN)
LF 20.000 $75.000 $158.800 $105.000 $350.000 $55.000 $190.000 $200.000 $100.000
RC PIPE (CL III)(24 IN)
LF 18.000 $68.430 $155.300 $112.000 $480.000 $65.000 $195.000 $200.000 $100.000
RC PIPE (CL III)(30 IN)
LF 4.000 $118.000 $267.400 $136.000 $900.000 $65.000 $220.000 $400.000 $150.000
RC PIPE (CL III)(42 IN)
LF 16.000 $150.510 $127.100 $650.000 $850.000 $75.000 $265.000 $250.000 $210.000
RC PIPE (CL III)(48 IN)
LF 32.000 $184.860 $192.000 $390.000 $870.000 $105.000 $285.000 $250.000 $250.000
INLET (COMPL)(TY AD)
EA 4.000 $2,646.770 $3,850.200 $4,500.000 $5,700.000 $3,550.000 $4,800.000 $6,000.000 $5,000.000
MANH (COMPL)(TY A)
EA 2.000 $2,937.900 $3,556.400 $4,500.000 $5,200.000 $3,250.000 $3,500.000 $5,500.000 $7,000.000
INLET (COMPL)(EXT TY C)
EA 4.000 $1,200.000 $804.700 $1,950.000 $950.000 $2,750.000 $1,500.000 $3,000.000 $5,000.000
INLET (COMPL)(TY C)
EA 10.000 $2,750.000 $2,296.400 $4,200.000 $3,200.000 $3,755.000 $3,200.000 $4,500.000 $5,000.000
JACK BOR OR TUN PIPE(18 IN)(RC)(CL III)
LF 258.000 $515.470 $177.800 $230.000 $170.000 $145.000 $575.000 $500.000 $100.000
ADJUSTING MANHOLES
EA 6.000 $650.000 $440.700 $350.000 $850.000 $1,250.000 $1,700.000 $500.000 $1,500.000
ADJUSTING INLET (CAP)
EA 1.000 $1,239.500 $1,735.800 $4,000.000 $1,500.000 $1,350.000 $1,700.000 $600.000 $1,500.000
REMOV STR (INLET)
EA 10.000 $717.650 $427.500 $600.000 $650.000 $850.000 $1,000.000 $400.000 $2,500.000
REMOV STR (PIPE)
LF 64.000 $21.000 $22.000 $25.000 $25.000 $30.000 $20.000 $30.000 $35.000
MOBILIZATION
LS 1.000 $160,295.800 $80,167.900 $225,000.000 $100,000.000 $250,000.000 $219,000.000 $182,000.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $6,500.000 $2,983.200 $2,500.000 $4,500.000 $2,500.000 $7,200.000 $7,500.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 150.000 $17.960 $52.000 $45.000 $65.000 $45.000 $35.000 $30.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 150.000 $15.000 $21.200 $10.000 $12.000 $10.000 $20.000 $10.000 $15.000
SANDBAGS FOR EROSION CONTROL (6")
LF 320.000 $6.080 $4.500 $2.000 $12.000 $7.000 $10.000 $5.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,246.000 $2.330 $1.700 $2.000 $3.000 $4.000 $2.500 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,246.000 $0.630 $0.300 $1.000 $1.000 $2.000 $1.000 $1.000 $2.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,930.000 $33.780 $14.400 $60.000 $60.000 $60.000 $60.000 $20.000 $68.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 200.000 $39.240 $14.500 $70.000 $65.000 $55.000 $93.000 $20.000 $68.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 4,790.000 $4.610 $7.600 $9.000 $10.000 $20.000 $9.000 $4.000 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 400.000 $6.460 $8.400 $9.000 $10.000 $20.000 $9.000 $4.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,930.000 $7.340 $12.100 $15.000 $25.000 $25.000 $13.000 $4.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 200.000 $9.130 $12.400 $15.000 $25.000 $30.000 $13.000 $4.000 $20.000
CONC CURB (TY II)
LF 5,137.000 $12.000 $3.000 $2.500 $2.500 $7.000 $4.000 $3.000 $25.000
CONC CURB & GUTTER (TY II)
LF 866.000 $18.450 $20.400 $48.000 $28.000 $25.000 $19.000 $15.000 $30.000
CURB RAMPS (TY 1)
EA 4.000 $1,661.140 $1,254.500 $1,800.000 $1,700.000 $1,450.000 $1,300.000 $2,000.000 $2,100.000
CURB RAMPS (TY 7)
EA 12.000 $1,700.000 $1,254.500 $1,800.000 $1,500.000 $1,850.000 $1,300.000 $2,500.000 $2,100.000
CURB RAMPS (TY 21)
EA 2.000 $2,565.850 $1,367.500 $2,000.000 $2,000.000 $2,040.000 $1,300.000 $3,200.000 $2,100.000
CONDT (PVC) (SCH 80) (2")
LF 1,735.000 $5.760 $3.600 $7.750 $8.000 $15.000 $3.200 $12.000 $15.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 890.000 $18.440 $5.600 $13.200 $12.000 $22.000 $4.960 $18.000 $30.000
CONDT (PVC) (SCH 80) (3")
LF 650.000 $12.000 $6.800 $11.500 $11.000 $20.000 $5.980 $15.000 $15.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 371.000 $26.430 $9.700 $15.000 $15.000 $25.000 $8.580 $20.000 $30.000
CONDT (PVC) (SCH 80) (4")
LF 10.000 $11.130 $13.000 $12.200 $12.000 $20.000 $11.530 $18.000 $20.000
ELEC CONDR (NO.6) BARE
LF 4,105.000 $1.340 $1.700 $1.500 $1.400 $1.250 $1.470 $1.000 $2.000
ELEC CONDR (NO.4) BARE
LF 440.000 $1.540 $1.900 $2.000 $2.000 $2.000 $1.710 $1.500 $2.000
ELEC CONDR (NO.4) INSULATED
LF 880.000 $2.260 $2.000 $2.200 $2.100 $3.000 $1.770 $2.000 $2.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 3,065.000 $1.980 $2.100 $2.250 $2.200 $2.000 $1.900 $1.750 $2.000
GROUND BOX TY D (162922)
EA 5.000 $950.000 $862.100 $600.000 $600.000 $1,100.000 $762.960 $900.000 $550.000
GROUND BOX TY D (162922)W/APRON
EA 12.000 $864.820 $1,325.900 $700.000 $700.000 $1,200.000 $1,173.370 $1,000.000 $650.000
ELC SRV TY D 120/240 100(NS)SS(E)SP(O)
EA 1.000 $4,500.000 $5,916.200 $3,700.000 $3,700.000 $5,500.000 $5,235.580 $5,000.000 $5,000.000
ALUMINUM SIGNS (TY A)
SF 28.000 $25.120 $27.700 $32.000 $32.000 $150.000 $24.500 $170.000 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000 $470.530 $508.500 $374.000 $530.000 $450.000 $450.000 $350.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 9.000 $700.000 $734.500 $510.000 $670.000 $655.000 $650.000 $470.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $800.000 $904.000 $654.000 $720.000 $920.000 $800.000 $600.000 $650.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,225.000 $0.840 $1.100 $1.000 $1.200 $1.500 $1.000 $1.000 $2.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,065.000 $2.700 $3.400 $2.600 $2.700 $3.500 $3.000 $1.400 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 275.000 $5.100 $6.800 $4.400 $4.300 $6.250 $6.000 $4.000 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 12.000 $115.310 $113.000 $110.000 $94.000 $125.000 $100.000 $100.000 $150.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 2.000 $157.540 $135.600 $192.000 $120.000 $155.000 $120.000 $175.000 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 14.000 $129.460 $113.000 $120.000 $110.000 $125.000 $100.000 $110.000 $150.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 14.000 $30.000 $40.700 $32.000 $72.000 $105.000 $36.000 $30.000 $100.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 2.000 $243.150 $113.000 $130.000 $190.000 $150.000 $100.000 $120.000 $100.000
PAVEMENT SEALER 4"
LF 2,995.000 $0.120 $0.100 $0.050 $0.060 $0.100 $0.040 $0.050 $0.100
PAVEMENT SEALER 8"
LF 2,225.000 $0.300 $0.800 $0.110 $0.130 $1.000 $0.680 $0.100 $1.000
PAVEMENT SEALER 12"
LF 1,065.000 $0.890 $0.200 $0.150 $0.370 $0.200 $0.120 $0.150 $1.000
PAVEMENT SEALER 24"
LF 275.000 $2.160 $0.300 $0.300 $0.580 $0.500 $0.240 $0.250 $1.000
PAVEMENT SEALER (ARROW)
EA 14.000 $27.280 $5.700 $9.000 $46.000 $20.000 $5.000 $8.000 $6.000
PAVEMENT SEALER (WORD)
EA 14.000 $30.580 $11.300 $9.000 $46.000 $20.000 $10.000 $8.000 $15.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,710.000 $0.350 $0.600 $0.450 $0.530 $1.000 $0.500 $0.400 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 285.000 $0.480 $0.600 $0.450 $0.720 $1.000 $0.500 $0.400 $1.000
REFL PAV MRKR TY I-C
EA 109.000 $3.360 $4.500 $2.750 $3.900 $5.000 $4.000 $3.500 $10.000
REFL PAV MRKR TY II-A-A
EA 15.000 $3.010 $4.500 $3.850 $3.900 $5.000 $4.000 $3.500 $10.000
REFL PAV MRKR TY II-C-R
EA 50.000 $5.000 $4.500 $4.000 $3.900 $6.000 $4.000 $3.500 $10.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,750.000 $0.360 $0.300 $0.300 $0.510 $1.000 $0.250 $0.300 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 1,500.000 $0.610 $0.600 $0.400 $0.770 $1.000 $0.500 $0.350 $1.000
ELIM EXT PAV MRK & MRKS (12")
LF 360.000 $1.230 $0.800 $0.850 $0.910 $2.000 $0.750 $0.750 $4.000
ELIM EXT PAV MRK & MRKS (24")
LF 168.000 $3.210 $1.700 $1.100 $1.300 $2.000 $1.500 $1.000 $4.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 12.000 $47.690 $39.600 $33.000 $55.000 $75.000 $35.000 $30.000 $4.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 3.000 $48.250 $39.600 $33.000 $77.000 $75.000 $35.000 $30.000 $0.500
PAV SURF PREP FOR MRK (4")
LF 2,995.000 $0.050 $0.100 $0.020 $0.020 $0.100 $0.010 $0.020 $1.000
PAV SURF PREP FOR MRK (8")
LF 2,225.000 $0.150 $0.100 $0.060 $0.050 $0.100 $0.020 $0.050 $1.000
PAV SURF PREP FOR MRK (12")
LF 1,065.000 $0.580 $0.100 $0.110 $0.060 $0.100 $0.030 $0.100 $2.000
PAV SURF PREP FOR MRK (24")
LF 275.000 $1.290 $0.300 $0.170 $0.120 $0.050 $0.040 $0.150 $2.000
PAV SURF PREP FOR MRK (ARROW)
EA 14.000 $15.090 $3.400 $5.500 $7.700 $5.000 $3.000 $5.000 $50.000
PAV SURF PREP FOR MRK (WORD)
EA 14.000 $19.070 $3.400 $5.500 $7.700 $5.000 $3.000 $5.000 $50.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $25,000.000 $56,147.800 $42,000.000 $40,000.000 $30,000.000 $49,688.290 $25,000.000 $30,000.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $4,579.490 $2,871.300 $4,500.000 $4,400.000 $6,500.000 $2,541.010 $5,000.000 $10,000.000
TEMP TRAF SIGNALS
EA 1.000 $30,000.000 $61,345.400 $50,000.000 $45,000.000 $35,000.000 $54,288.000 $40,000.000 $25,000.000
VEH SIG SEC (12")LED(GRN)
EA 16.000 $198.000 $173.800 $205.000 $200.000 $250.000 $153.790 $200.000 $285.000
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $231.980 $173.800 $205.000 $200.000 $250.000 $153.790 $200.000 $285.000
VEH SIG SEC (12")LED(YEL)
EA 16.000 $198.000 $173.800 $205.000 $200.000 $250.000 $153.790 $200.000 $285.000
VEH SIG SEC (12")LED(YEL ARW)
EA 2.000 $235.340 $173.800 $205.000 $200.000 $250.000 $153.790 $200.000 $285.000
VEH SIG SEC (12")LED(RED)
EA 16.000 $200.000 $173.800 $205.000 $200.000 $250.000 $153.790 $200.000 $285.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $228.380 $173.800 $205.000 $200.000 $250.000 $153.790 $200.000 $285.000
PED SIG SEC (LED)(COUNTDOWN)
EA 16.000 $400.000 $377.200 $490.000 $450.000 $450.000 $333.790 $350.000 $2,100.000
BACK PLATE (12")(3 SEC)
EA 16.000 $74.360 $72.100 $115.000 $1.050 $145.000 $63.790 $100.000 $105.000
BACK PLATE (12")(4 SEC)
EA 2.000 $91.110 $82.900 $125.000 $120.000 $155.000 $73.390 $110.000 $125.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 6,565.000 $1.500 $1.600 $1.200 $1.200 $1.750 $1.420 $1.500 $2.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 7,570.000 $1.660 $1.900 $1.650 $1.550 $2.000 $1.710 $1.800 $2.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 6,258.000 $1.920 $2.400 $2.200 $2.150 $2.250 $2.080 $2.000 $2.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 3.000 $7,634.920 $7,818.200 $7,100.000 $6,500.000 $10,500.000 $6,918.720 $1,000.000 $9,500.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 1.000 $8,351.780 $8,279.200 $7,500.000 $6,900.000 $11,500.000 $7,326.720 $11,000.000 $9,500.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 2.000 $15,500.000 $17,625.800 $16,000.000 $15,000.000 $23,500.000 $15,598.080 $25,000.000 $16,500.000
PED POLE ASSEMBLY
EA 12.000 $1,500.000 $1,909.500 $1,650.000 $1,500.000 $1,500.000 $1,689.840 $1,700.000 $2,100.000
PED DETECT PUSH BUTTON (APS)
EA 14.000 $750.000 $613.700 $675.000 $650.000 $800.000 $543.120 $750.000 $1,200.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $4,000.000 $3,749.900 $4,400.000 $4,100.000 $4,850.000 $3,318.480 $4,000.000 $3,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 123.000 $81.800 $122.900 $70.000 $120.000 $150.000 $300.000 $110.000 $125.000
VIVDS TEMPORARY
EA 1.000 $15,000.000 $17,625.800 $22,000.000 $21,000.000 $18,500.000 $15,598.080 $15,000.000 $30,000.000
RADAR PRESENCE DETECTOR
EA 6.000 $6,754.600 $8,347.300 $7,200.000 $6,700.000 $8,750.000 $7,386.960 $8,000.000 $7,500.000
RADAR PRESENCE DETECTOR COMM CABLE
LF 2,800.000 $3.430 $3.200 $3.000 $2.750 $4.000 $2.860 $3.000 $2.000
RADAR ADVANCED DETECTION DEVICE
EA 4.000 $7,955.140 $9,913.400 $7,400.000 $6,900.000 $8,000.000 $8,772.960 $8,000.000 $7,500.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $6,874.280 $7,167.300 $9,000.000 $8,400.000 $6,500.000 $6,342.720 $7,000.000 $6,500.000
GPS COMMUNICATIONS UNIT
EA 1.000 $891.670 $874.900 $860.000 $800.000 $670.000 $774.240 $550.000 $3,000.000
Totals: $2,080,088.959 $2,240,983.046 $2,264,528.700 $2,269,604.500 $2,351,088.000 $2,434,610.460 $2,441,348.850 $3,236,793.250