Show Job Controls
Bid Cobra

FORT BEND FM 2977 (3048-01-017)

Items: 61

County: FORT BEND
Length: N/A
Highway: FM 2977
District: HOUSTON
Control Number: 3048-01-017
DBE Goal: N/A
Project: STP 1902(333)
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $2,416,853.32
Date: 08/07/2019 (6 years ago)
Contract Number: N/A
Type: ADD LEFT TURN LANE AND ACP OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,416,853.32
$2,581,583.89
Over/Under Est: 6.82% $164,730.57
Over/Under Est: 8.38% $202,545.33
Amt Left: 1.46% $37,814.76
Over/Under Est: 15.64% $378,013.40
Amt Left: 8.26% $213,282.83
Delta: -6.70% -$175,468.07

Bid Items & Bid Tabulations

61 Total 0 of 61
FORT BEND  |  FM 2977  |  HOUSTON  |  3048-01-017  |  08/07/2019  |  $2,416,853.32  |  STP 1902(333)  |  ADD LEFT TURN LANE AND ACP OVERLAY  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, L.L.C.
DURWOOD GREENE CONSTRUCTION CO.
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 26.000 $100.000 $540.000 $800.000 $1,125.000
REMOVING CONCRETE(MOW STRIP)
LF 5,400.000 $5.000 $1.700 $7.000 $6.200
SUBGRADE WIDENING (DENS CONT)
STA 32.100 $600.000 $460.000 $1,200.000 $525.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,756.000 $10.000 $15.000 $20.000 $21.400
BACKFILL (TY A OR B)
STA 406.200 $175.000 $72.000 $200.000 $340.000
BLOCK SODDING
SY 8,500.000 $7.000 $3.950 $2.500 $3.750
FERTILIZER
AC 1.800 $550.000 $1,250.000 $600.000 $1,350.000
VEGETATIVE WATERING
MG 240.000 $15.000 $19.000 $25.000 $20.500
ASPHALT STAB BASE (GR 2)(PG 64)
TON 1,934.000 $75.000 $69.000 $100.000 $88.500
SALV, HAUL & STKPL RCL APH PV (1 1/2")
SY 16,198.000 $1.000 $2.500 $3.500 $2.250
SALV,HAUL&STKPL RCL APH PV(0 TO 1 1/2")
SY 5,979.000 $2.500 $1.100 $3.500 $5.650
D-GR HMA TY-D SAC-B PG70-22
TON 16,534.000 $76.000 $80.500 $81.000 $79.800
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,675.000 $20.000 $46.500 $26.000 $35.500
RIPRAP (MOW STRIP)(4 IN)
CY 255.000 $425.000 $682.000 $700.000 $490.000
CLEAN EXIST CULVERTS
EA 22.000 $1,300.000 $416.000 $2,000.000 $920.000
MOBILIZATION
LS 1.000 $114,945.760 $210,000.000 $65,000.000 $245,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $2,300.000 $2,500.000 $2,050.000
RUMBLE STRIPS (SHOULDER)
LF 83,090.000 $0.250 $0.170 $0.220 $0.180
RUMBLE STRIPS (CENTERLINE)
LF 30,132.000 $0.330 $0.400 $0.300 $0.260
MTL W-BEAM GD FEN (TIM POST)
LF 3,439.000 $25.000 $18.910 $21.000 $20.400
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,100.000 $1,570.000 $1,800.000 $1,695.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 260.000 $60.000 $61.100 $70.000 $66.000
REMOVE METAL BEAM GUARD FENCE
LF 3,699.000 $3.000 $1.500 $1.250 $1.600
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $300.000 $280.000 $250.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $2,500.000 $2,650.000 $2,850.000 $2,860.000
GUARDRAIL END TREATMENT (REMOVE)
EA 18.000 $300.000 $280.000 $280.000 $300.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 21.000 $260.000 $265.000 $200.000 $285.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 4.000 $300.000 $290.000 $230.000 $315.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $570.000 $575.000 $400.000 $620.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 34.000 $25.000 $15.000 $22.000 $16.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 37.000 $450.000 $445.000 $390.000 $480.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 26.000 $480.000 $465.000 $520.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 14.000 $570.000 $510.000 $540.000 $550.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 12.000 $650.000 $585.000 $640.000 $630.000
REMOVE SM RD SN SUP&AM
EA 89.000 $100.000 $53.000 $50.000 $57.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 65.000 $60.000 $70.000 $60.000 $76.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 150.000 $40.000 $25.000 $25.000 $27.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 84,800.000 $0.200 $0.200 $0.200 $0.380
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 5,500.000 $0.450 $0.250 $0.400 $0.550
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 1,500.000 $2.500 $1.000 $1.000 $2.150
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 30.000 $86.000 $40.000 $35.000 $60.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 30.000 $86.000 $40.000 $35.000 $65.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 18,500.000 $0.250 $0.200 $0.200 $0.430
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 56,500.000 $0.200 $0.200 $0.200 $0.380
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 5,500.000 $1.200 $0.800 $0.800 $1.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,500.000 $6.500 $6.900 $5.000 $6.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 30.000 $150.000 $145.000 $99.000 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 30.000 $150.000 $145.000 $99.000 $155.000
REFL PAV MRK TY II (W) (RR XING)
EA 1.000 $300.000 $125.000 $500.000 $375.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 84,800.000 $0.450 $0.520 $0.380 $0.430
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 18,500.000 $0.430 $0.520 $0.380 $0.550
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 56,500.000 $0.470 $0.520 $0.380 $0.550
REFL PAV MRKR TY I-C
EA 325.000 $3.600 $4.000 $5.000 $4.350
REFL PAV MRKR TY II-A-A
EA 2,450.000 $3.600 $4.000 $5.000 $4.350
PAV SURF PREP FOR MRK (6")
LF 159,800.000 $0.050 $0.010 $0.020 $0.020
PAV SURF PREP FOR MRK (8")
LF 5,500.000 $0.200 $0.020 $0.040 $0.040
PAV SURF PREP FOR MRK (24")
LF 1,500.000 $1.000 $0.100 $0.060 $0.250
PAV SURF PREP FOR MRK (ARROW)
EA 30.000 $18.000 $5.000 $5.000 $3.250
PAV SURF PREP FOR MRK (WORD)
EA 30.000 $17.000 $5.000 $5.000 $5.400
TMA (STATIONARY)
DAY 43.000 $300.000 $470.000 $500.000 $245.000
TMA (MOBILE OPERATION)
HR 344.000 $15.000 $88.000 $25.000 $55.000
Totals: $2,416,853.320 $2,581,583.890 $2,619,398.650 $2,794,866.720