FORT BEND FM 1092 (1257-01-052)

Items: 100

County: FORT BEND
Length: N/A
Highway: FM 1092
District: HOUSTON
Control Number: 1257-01-052
DBE Goal: N/A
Project: C 1257-1-52
Guaranty: N/A
Time: 103 WORKING DAYS
Engineer's Estimate: $3,427,131.17
Date: 03/03/2022 (4 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$3,427,131.17
$4,238,148.20
Over/Under Est: 23.66% $811,017.03
Over/Under Est: 32.75% $1,122,494.43
Amt Left: 7.35% $311,477.40
Over/Under Est: 52.17% $1,788,011.65
Amt Left: 23.05% $976,994.62
Delta: -14.63% -$665,517.22
Subcontractor Percentage Amount
STRIPE LINES, INC. 6.32% $267,850.97
THIRD COAST SERVICES LLC 4.70% $199,192.97
MAIN LANE INDUSTRIES LTD. 4.58% $194,107.19
TRAFFIC SIGNS & LINES, LLC 3.60% $152,573.34
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. 2.47% $104,682.26
HOLES INCORPORATED 1.09% $46,195.82
INTERSTATE BARRICADES & MARKINGS, INC. 0.35% $14,833.52
HOLES INCORPORATED 0.35% $14,833.52
Total: 23.46% $994,269.59

Bid Items & Bid Tabulations

100 Total 0 of 100
FORT BEND  |  FM 1092  |  HOUSTON  |  1257-01-052  |  03/03/2022  |  $3,427,131.17  |  C 1257-1-52  |  SURF/ROADWAY RESTOR  |  103 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURWOOD GREENE CONSTRUCTION CO.
TEXAS MATERIALS GROUP, INC.
JAMES CONSTRUCTION GROUP, LLC
REMOVING CONC (SIDEWALK OR RAMP)
SY 80.000 $25.000 $25.000 $28.000 $40.000
SALV, HAUL & STKPL RCL APH PV (1 1/2")
SY 224,538.000 $2.000 $2.000 $2.500 $3.450
ASPH (AC-20-5TR)
GAL 42,848.000 $2.800 $3.950 $4.000 $4.500
AGGR (TY-PB OR PL GR 5 SAC-B)
CY 1,763.000 $130.000 $127.000 $160.000 $240.000
TOM (ASPHALT) PG 76-22
TON 941.000 $120.000 $144.000 $150.000 $160.000
TOM - F (AGGREGATE) SAC - A
TON 12,508.000 $120.000 $144.000 $150.000 $160.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,000.000 $35.000 $35.000 $65.000 $104.000
PLANE CONC PAV(0" TO 1-1/2")
SY 13,507.000 $5.000 $15.000 $2.500 $8.500
FULL - DEPTH REPAIR CRCP (8")
SY 500.000 $200.000 $375.000 $400.000 $430.000
RIPRAP (MOW STRIP)(4 IN)
CY 38.000 $460.000 $750.000 $580.000 $748.000
ADJUSTING MANHOLES
EA 23.000 $350.000 $600.000 $2,100.000 $346.000
MOBILIZATION
LS 1.000 $130,000.000 $150,000.000 $425,000.000 $315,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $4,500.000 $5,000.000 $1,600.000 $18,400.000
CONC CURB (DOWEL)
LF 100.000 $6.000 $80.000 $41.000 $40.250
CONC CURB (SLOTTED)
LF 225.000 $27.250 $90.000 $42.000 $63.240
CONC SIDEWALKS (4")
SY 140.000 $50.000 $75.000 $85.000 $143.740
CURB RAMPS (TY 1)
EA 5.000 $1,790.000 $2,900.000 $1,500.000 $4,024.610
CURB RAMPS (TY 2)
EA 1.000 $1,800.000 $4,500.000 $1,500.000 $4,024.610
CURB RAMPS (TY 5)
EA 2.000 $2,000.000 $5,700.000 $1,500.000 $4,024.610
CURB RAMPS (TY 7)
EA 4.000 $1,700.000 $2,700.000 $1,600.000 $4,024.610
MTL W-BEAM GD FEN (TIM POST)
LF 325.000 $20.000 $27.000 $25.000 $23.990
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $1,800.000 $2,100.000 $2,000.000 $1,907.000
SHORT RADIUS
LF 69.000 $34.500 $400.000 $350.000 $330.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 3.000 $900.000 $850.000 $800.000 $775.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,200.000 $1,500.000 $1,500.000 $1,357.000
REMOVE METAL BEAM GUARD FENCE
LF 325.000 $2.750 $2.200 $2.100 $2.060
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 $150.000 $300.000 $300.000 $284.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $300.000 $300.000 $300.000 $284.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,550.000 $3,300.000 $3,100.000 $3,089.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $350.000 $300.000 $290.000 $284.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 3.000 $230.000 $375.000 $270.000 $263.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $275.000 $420.000 $290.000 $288.000
CONDT (PVC) (SCH 80) (2")
LF 1,655.000 $8.500 $12.000 $12.000 $11.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 425.000 $15.000 $17.000 $17.000 $15.500
CONDT (PVC) (SCH 80) (3")
LF 80.000 $13.000 $23.000 $23.000 $21.000
CONDT (RM) (2")
LF 280.000 $30.000 $38.000 $36.000 $35.000
CONDT (RM) (3")
LF 50.000 $50.000 $60.000 $60.000 $55.000
ELEC CONDR (NO.6) BARE
LF 2,460.000 $1.250 $2.000 $2.000 $1.900
GROUND BOX TY D (162922)W/APRON
EA 16.000 $1,050.000 $1,200.000 $1,200.000 $1,125.000
ZINC-COAT STL WIRE STRAND (5/16")
LF 1,280.000 $2.000 $4.500 $4.700 $4.500
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 22.000 $20.000 $35.000 $34.000 $33.240
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 60.000 $420.000 $500.000 $475.000 $454.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 24.000 $550.000 $600.000 $570.000 $566.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 1.000 $680.000 $700.000 $700.000 $671.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $700.000 $750.000 $700.000 $693.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 15.000 $750.000 $870.000 $850.000 $818.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $800.000 $1,000.000 $1,000.000 $933.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 9.000 $950.000 $1,025.000 $1,000.000 $956.000
REMOVE SM RD SN SUP&AM
EA 116.000 $80.000 $45.000 $45.000 $44.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 10.000 $55.000 $70.000 $61.000 $60.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 16.000 $20.000 $25.000 $21.000 $20.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 6.000 $60.000 $70.000 $61.000 $60.000
INSTL OM ASSM (OM-3L)(TWT)GND
EA 5.000 $200.000 $300.000 $300.000 $280.000
INSTL OM ASSM (OM-3R)(TWT)GND
EA 5.000 $200.000 $300.000 $300.000 $280.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 14.000 $30.000 $35.000 $31.000 $30.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)SRF(BI)
EA 14.000 $70.000 $150.000 $150.000 $145.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 50,465.000 $0.220 $0.250 $0.250 $0.240
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 654.000 $1.080 $0.250 $0.250 $0.240
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 101,133.000 $0.200 $0.250 $0.250 $0.240
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 43,860.000 $0.400 $0.450 $0.450 $0.400
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 6,534.000 $2.070 $2.750 $2.600 $2.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 396.000 $48.000 $70.000 $70.000 $66.000
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 9.000 $100.000 $130.000 $130.000 $125.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 375.000 $50.000 $80.000 $80.000 $78.000
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
EA 87.000 $35.000 $10.000 $9.100 $9.000
WK ZN PAV MRK NON-REMOV (Y)6"(DOT)
LF 129.000 $0.250 $2.000 $1.300 $1.250
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 1,347.000 $0.220 $0.300 $0.300 $0.290
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 75.000 $3.000 $4.000 $3.100 $3.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 327.000 $1.250 $2.000 $0.700 $0.680
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 14,620.000 $0.950 $0.600 $0.600 $0.590
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 7,390.000 $3.250 $3.000 $2.900 $2.840
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 5,763.000 $6.500 $6.000 $6.000 $5.800
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 132.000 $130.000 $150.000 $140.000 $135.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 3.000 $170.000 $300.000 $265.000 $260.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 125.000 $130.000 $150.000 $160.000 $150.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 29.000 $30.000 $25.000 $15.500 $15.000
REFL PAV MRK TY I (Y)6"(DOT)(100MIL)
LF 43.000 $2.600 $2.000 $1.100 $1.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 25.000 $6.500 $10.000 $6.300 $6.200
PAVEMENT SEALER 12"
LF 7,390.000 $0.500 $0.150 $0.150 $0.150
PAVEMENT SEALER 24"
LF 3,585.000 $0.850 $0.350 $0.350 $0.330
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 16,821.000 $0.530 $0.550 $0.550 $0.540
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 33,711.000 $0.500 $0.550 $0.550 $0.520
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 449.000 $0.600 $0.550 $0.550 $0.540
REFL PAV MRKR TY I-C
EA 1,572.000 $4.000 $4.500 $4.200 $4.150
REFL PAV MRKR TY II-A-A
EA 36.000 $4.000 $5.000 $4.600 $4.500
ELIM EXT PAV MRK & MRKS (12")
LF 840.000 $1.200 $0.700 $0.700 $0.680
ELIM EXT PAV MRK & MRKS (24")
LF 1,326.000 $2.500 $0.900 $0.900 $0.880
PAV SURF PREP FOR MRK (12")
LF 7,390.000 $0.150 $0.070 $0.050 $0.050
PAV SURF PREP FOR MRK (24")
LF 3,585.000 $0.300 $0.100 $0.080 $0.080
PED SIG SEC (LED)(COUNTDOWN)
EA 22.000 $450.000 $700.000 $630.000 $625.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 4,695.000 $1.200 $1.800 $1.700 $1.650
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 4,785.000 $1.600 $2.250 $2.100 $2.050
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 8,645.000 $1.250 $1.750 $1.700 $1.600
PED POLE ASSEMBLY
EA 17.000 $1,600.000 $2,000.000 $2,000.000 $1,900.000
PED DETECT PUSH BUTTON (APS)
EA 22.000 $680.000 $750.000 $750.000 $725.000
PED DETECTOR CONTROLLER UNIT
EA 5.000 $3,325.000 $1,700.000 $1,550.000 $1,500.000
VEH LP DETECT (SAWCUT)
LF 3,170.000 $8.000 $11.000 $10.000 $9.750
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 42.000 $70.000 $500.000 $45.000 $108.000
TMA (STATIONARY)
DAY 65.000 $185.000 $400.000 $150.000 $300.000
TMA (MOBILE OPERATION)
DAY 38.000 $350.000 $250.000 $175.000 $648.000
Totals: $3,427,131.170 $4,238,148.200 $4,549,625.600 $5,215,142.820