Items: 47

County: FORT BEND
Length: N/A
Highway: FM 1875
District: HOUSTON
Control Number: 0527-05-012
DBE Goal: 0.0%
Project: C 527-5-12
Guaranty: N/A
Time: 45 WORKING DAYS
Engineer's Estimate: $1,950,822.73
Date: 03/06/2024 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,950,822.73
$1,497,972.35
Over/Under Est: -23.21% -$452,850.38
Over/Under Est: -23.16% -$451,753.48
Amt Left: 0.07% $1,096.90
Over/Under Est: -21.02% -$410,019.18
Amt Left: 2.86% $42,831.20
Delta: -2.78% -$41,734.30
Over/Under Est: -16.78% -$327,351.68
Amt Left: 8.38% $125,498.70
Delta: -5.37% -$82,667.50
$1,823,450.70
Over/Under Est: -6.53% -$127,372.03
Amt Left: 21.73% $325,478.35
Delta: -12.32% -$199,979.65
Subcontractor Percentage Amount
TRAFFIC SIGNS & LINES, LLC 3.29% $69,759.83
BATTERSON, LLP 3.18% $67,427.44
INTERSTATE BARRICADES & MARKINGS, INC. 0.51% $10,813.83
PROFESSIONAL TRAFFIC CONTROL LLC 0.42% $8,905.51
Total: 7.40% $156,906.61

Bid Items & Bid Tabulations

47 Total 0 of 47
FORT BEND  |  FM 1875  |  HOUSTON  |  0527-05-012  |  03/06/2024  |  $1,950,822.73  |  C 527-5-12  |  SURF/ROADWAY RESTOR  |  45 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURWOOD GREENE CONSTRUCTION CO.
TEXAS MATERIALS GROUP, INC.
JAMES CONSTRUCTION GROUP, LLC
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
HAYDEN PAVING, INC.
EXCAVATION (ROADWAY)
CY 39.000 $11.000 $100.000 $341.000 $120.000 $100.000 $75.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 117.000 $35.000 $130.000 $137.000 $149.000 $120.000 $200.000
BACKFILL (TY A OR B)
STA 243.000 $350.000 $375.000 $348.000 $341.000 $300.000 $300.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 516.000 $90.000 $77.000 $96.000 $95.000 $70.000 $85.000
RIPRAP (MOW STRIP)(4 IN)
CY 15.000 $750.000 $1,500.000 $1,296.000 $600.000 $585.000 $1,200.000
MOBILIZATION
LS 1.000 $146,922.000 $75,000.000 $120,000.000 $150,000.000 $150,000.000 $235,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $12,500.000 $3,000.000 $2,200.000 $8,860.000 $4,000.000 $4,000.000
PERM CTB (F-SHAPE) (TY 1)
LF 200.000 $179.000 $90.000 $217.000 $106.000 $175.000 $75.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 45,220.000 $1.250 $0.160 $0.060 $0.410 $0.170 $0.150
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 24,275.000 $1.250 $0.160 $0.070 $0.380 $0.100 $0.150
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $26.500 $26.000 $25.000 $23.500 $26.500 $30.000
TERMINAL ANCHOR SECTION
EA 4.000 $725.000 $400.000 $1,500.000 $1,500.000 $960.000 $1,300.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,350.000 $3,200.000 $2,216.000 $3,240.000 $2,400.000 $2,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,150.000 $3,800.000 $3,135.000 $2,950.000 $3,180.000 $3,500.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 14.000 $330.000 $200.000 $195.000 $300.000 $205.000 $200.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 5.000 $390.000 $210.000 $190.000 $365.000 $270.000 $200.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 12.000 $700.000 $580.000 $582.000 $725.000 $485.000 $575.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 24.000 $920.000 $520.000 $511.000 $430.000 $630.000 $560.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $795.000 $630.000 $624.000 $550.000 $780.000 $680.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,030.000 $900.000 $744.000 $675.000 $985.000 $790.000
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 2.000 $1,300.000 $1,000.000 $914.000 $955.000 $1,040.000 $1,150.000
REMOVE SM RD SN SUP&AM
EA 39.000 $115.000 $85.000 $69.000 $85.000 $90.000 $81.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $30.000 $25.000 $26.000 $25.000 $25.000 $11.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 10.000 $80.000 $90.000 $80.000 $75.000 $68.000 $125.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $35.000 $35.000 $37.000 $35.000 $33.000 $13.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 47.000 $30.000 $70.000 $78.000 $75.000 $68.000 $125.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 48,100.000 $0.500 $0.320 $0.320 $0.300 $0.320 $1.550
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 59.000 $3.560 $2.000 $2.100 $2.000 $2.000 $5.000
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 1.000 $150.000 $175.000 $186.000 $175.000 $175.000 $155.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 4,836.000 $0.750 $0.320 $0.320 $0.300 $0.320 $1.520
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 10,629.000 $0.500 $0.320 $0.320 $0.300 $0.320 $1.520
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 59.000 $8.000 $8.000 $8.600 $8.000 $8.000 $21.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 1.000 $550.000 $300.000 $319.000 $300.000 $300.000 $255.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 48,100.000 $1.750 $0.550 $0.600 $0.550 $0.550 $0.460
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 4,836.000 $1.500 $0.550 $0.600 $0.550 $0.550 $0.460
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 10,629.000 $1.060 $0.550 $0.600 $0.550 $0.550 $0.460
REFL PAV MRKR TY II-A-A
EA 319.000 $8.500 $6.000 $6.500 $6.000 $6.000 $13.000
ELIM EXT PAV MRK & MRKS (6")
LF 63,565.000 $0.530 $0.100 $0.100 $0.100 $0.100 $0.510
ELIM EXT PAV MRK & MRKS (24")
LF 59.000 $3.250 $0.500 $0.500 $0.500 $0.500 $3.100
ELIM EXT PAV MRK & MRKS (RR XING)
EA 1.000 $250.000 $35.000 $35.000 $35.000 $35.000 $50.000
PAV SURF PREP FOR MRK (6")
LF 127,130.000 $0.050 $0.020 $0.020 $0.020 $0.020 $0.260
PAV SURF PREP FOR MRK (24")
LF 118.000 $0.750 $0.500 $0.500 $0.500 $0.500 $0.550
PAV SURF PREP FOR MRK (RR XING)
EA 2.000 $200.000 $20.000 $20.000 $20.000 $20.000 $5.500
D-GR HMA TY-D SAC-A PG70-22
TON 7,212.000 $153.000 $145.000 $133.000 $126.500 $151.000 $145.000
TACK COAT
GAL 7,868.000 $7.500 $1.000 $3.700 $2.250 $3.250 $4.500
TMA (STATIONARY)
DAY 10.000 $200.000 $400.000 $400.000 $250.000 $175.000 $200.000
TMA (MOBILE OPERATION)
DAY 108.000 $450.000 $50.000 $10.000 $600.000 $125.000 $200.000
Totals: $1,950,822.730 $1,497,972.350 $1,499,069.250 $1,540,803.550 $1,623,471.050 $1,823,450.700