FORT BEND IH 10 (0271-05-042)

Items: 116

County: FORT BEND
Length: N/A
Highway: IH 10
District: HOUSTON
Control Number: 0271-05-042
DBE Goal: N/A
Project: CC 271-5-42
Guaranty: N/A
Time: 151 WORKING DAYS
Engineer's Estimate: $2,440,647.10
Date: 12/01/2016 (9 years ago)
Contract Number: N/A
Type: RAMP RELOCATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (11)
E
Engineer's Estimate
$2,440,647.10
$2,297,994.98
Over/Under Est: -5.84% -$142,652.12
Over/Under Est: -0.54% -$13,149.21
Amt Left: 5.64% $129,502.91
Over/Under Est: -0.17% -$4,147.10
Amt Left: 6.03% $138,505.02
Delta: -0.37% -$9,002.11
Over/Under Est: 1.05% $25,729.87
Amt Left: 7.33% $168,381.99
Delta: -1.23% -$29,876.97
Over/Under Est: 2.39% $58,230.23
Amt Left: 8.74% $200,882.35
Delta: -1.32% -$32,500.36
Over/Under Est: 3.06% $74,703.00
Amt Left: 9.46% $217,355.12
Delta: -0.66% -$16,472.77
$2,546,304.95
Over/Under Est: 4.33% $105,657.85
Amt Left: 10.81% $248,309.97
Delta: -1.23% -$30,954.85
Over/Under Est: 21.63% $527,887.85
Amt Left: 29.18% $670,539.97
Delta: -16.58% -$422,230.00
Over/Under Est: 24.84% $606,165.84
Amt Left: 32.59% $748,817.96
Delta: -2.64% -$78,277.99
$3,054,071.92
Over/Under Est: 25.13% $613,424.82
Amt Left: 32.9% $756,076.94
Delta: -0.24% -$7,258.98
$4,103,286.85
Over/Under Est: 68.12% $1,662,639.75
Amt Left: 78.56% $1,805,291.87
Delta: -34.35% -$1,049,214.93

Bid Items & Bid Tabulations

116 Total 0 of 116
FORT BEND  |  IH 10  |  HOUSTON  |  0271-05-042  |  12/01/2016  |  $2,440,647.10  |  CC 271-5-42  |  RAMP RELOCATION  |  151 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
HASSELL CONSTRUCTION COMPANY, INC.
MAIN LANE INDUSTRIES LTD.
ANGEL BROTHERS HOLDINGS CORP.
TLC TRUCKING & CONTRACTING, INC.
DURWOOD GREENE CONSTRUCTION CO.
TRIPLE B SERVICES LLP
ARANDA BROTHERS CONSTRUCTION CO., INC.
JOHN REED AND COMPANY, LLC
ALTUS CONSTRUCTION LLC
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 45.400 $3,500.000 $400.000 $2,800.000 $800.000 $400.000 $1,069.210 $700.000 $850.000 $2,000.000 $5,000.000 $4,889.250 $5,000.000
REMOVING CONC (PAV)
SY 3,133.000 $7.500 $5.300 $5.000 $5.000 $1.500 $2.200 $12.500 $6.000 $10.000 $5.000 $8.760 $20.000
REMOVING CONC (CURB)
LF 165.000 $6.000 $1.000 $2.000 $1.000 $5.000 $3.020 $10.000 $8.000 $5.000 $3.000 $9.620 $15.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 805.000 $5.000 $10.000 $6.000 $5.000 $4.000 $3.000 $16.000 $13.500 $12.000 $6.000 $8.450 $20.000
EXCAVATION (ROADWAY)
CY 10,508.000 $9.000 $11.000 $8.000 $7.500 $5.000 $5.000 $4.000 $10.000 $7.000 $15.000 $12.520 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 10,153.000 $9.000 $12.000 $6.000 $5.000 $8.000 $4.000 $4.000 $10.500 $9.000 $16.000 $16.280 $30.000
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 40.000 $45.000 $93.000 $60.000 $120.000 $100.000 $34.000 $75.000 $115.000 $65.000 $100.000 $52.150 $85.000
BACKFILL (TY A OR B)
STA 1.000 $200.000 $16,000.000 $6,500.000 $3,000.000 $1,500.000 $1,357.000 $2,000.000 $2,200.000 $3,500.000 $500.000 $9,778.500 $2,000.000
BLOCK SODDING
SY 200.000 $3.000 $5.500 $6.750 $4.000 $6.000 $8.000 $6.000 $5.500 $5.000 $5.000 $3.660 $5.000
STRAW OR HAY MULCH
SY 27,290.000 $0.250 $0.230 $0.200 $0.140 $0.200 $0.230 $0.170 $0.230 $0.450 $0.400 $0.210 $0.500
BROADCAST SEED (TEMP) (WARM)
SY 27,290.000 $0.150 $0.140 $0.070 $0.130 $0.160 $0.080 $0.150 $0.140 $0.400 $0.100 $0.240 $0.500
BROADCAST SEED (PERM)(SPECIAL MIX)
SY 27,290.000 $0.200 $0.200 $0.150 $0.140 $0.200 $0.170 $0.250 $0.200 $0.400 $0.100 $0.530 $0.500
FERTILIZER
AC 5.640 $650.000 $850.000 $890.000 $750.000 $900.000 $993.000 $600.000 $875.000 $1,150.000 $250.000 $915.550 $2,000.000
VEGETATIVE WATERING
MG 676.800 $20.000 $15.000 $19.000 $15.000 $15.000 $21.750 $15.000 $18.000 $25.000 $20.000 $52.150 $38.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 171.000 $160.000 $180.000 $153.000 $170.000 $175.000 $167.250 $170.000 $170.000 $195.000 $152.000 $207.920 $171.000
LIME TRT (SUBGRADE)(6")
SY 12,768.000 $4.500 $3.800 $2.500 $3.000 $4.000 $2.410 $3.000 $3.500 $5.000 $2.600 $4.950 $3.500
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 3,989.000 $6.500 $15.000 $15.600 $20.000 $16.000 $15.460 $20.000 $18.000 $27.000 $20.000 $6.430 $25.000
CEM TRT(PLNT MX) (CL N)(TYE)(GR 4)(12")
SY 8,530.000 $15.000 $23.000 $29.000 $36.000 $32.000 $40.100 $38.000 $32.000 $30.000 $45.000 $10.430 $35.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 219.000 $100.000 $130.000 $125.000 $126.000 $80.000 $1,099.000 $120.000 $130.000 $170.000 $120.000 $97.410 $210.000
D-GR HMA TY-C SAC-B PG70-22
TON 3,053.000 $85.000 $93.000 $97.000 $96.000 $85.000 $98.000 $85.000 $100.000 $130.000 $98.000 $101.000 $165.000
D-GR HMA TY-D PG 70-22 (LEVEL-UP)
TON 116.000 $95.000 $255.000 $128.000 $130.000 $85.000 $89.000 $240.000 $125.000 $120.000 $120.000 $118.190 $165.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 134.000 $10.000 $31.000 $4.700 $20.000 $10.000 $14.000 $15.000 $60.000 $10.000 $25.000 $4.430 $20.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 3,670.000 $74.000 $63.000 $56.000 $74.000 $75.000 $69.000 $72.000 $90.000 $52.000 $90.000 $97.790 $75.000
CEM STABIL BKFL
CY 571.000 $50.000 $36.000 $38.000 $40.000 $40.000 $58.000 $65.000 $60.000 $65.000 $60.000 $102.530 $140.000
TRENCH EXCAVATION PROTECTION
LF 615.000 $2.000 $1.000 $1.500 $1.000 $1.000 $2.000 $3.500 $4.750 $2.000 $3.000 $8.080 $30.000
DRILL SHAFT (30 IN)
LF 276.000 $150.000 $150.000 $315.000 $220.000 $255.000 $180.000 $340.000 $330.000 $295.000 $320.000 $280.620 $300.000
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 7.000 $100.000 $81.000 $121.850 $100.000 $60.000 $111.000 $90.000 $115.000 $100.000 $75.000 $392.370 $1,000.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 42.000 $300.000 $365.000 $389.000 $400.000 $320.000 $420.000 $670.000 $500.000 $550.000 $270.000 $445.930 $625.000
CL C CONC (ABUT)
CY 28.000 $975.000 $800.000 $1,500.000 $1,300.000 $950.000 $1,105.000 $1,700.000 $975.000 $950.000 $1,800.000 $1,277.330 $1,000.000
CL C CONC (FOOTING)
CY 33.000 $750.000 $1,900.000 $1,800.000 $1,100.000 $1,530.000 $959.000 $2,000.000 $680.000 $750.000 $800.000 $710.930 $1,000.000
REINF CONC SLAB (BOX BEAM)
SF 2,093.000 $22.000 $15.000 $9.000 $18.000 $22.000 $18.000 $9.500 $17.500 $15.000 $15.000 $36.010 $25.000
APPROACH SLAB
CY 39.720 $600.000 $475.000 $500.000 $450.000 $580.000 $542.000 $550.000 $685.000 $350.000 $900.000 $830.790 $1,500.000
SHEAR KEY
CY 21.300 $275.000 $257.000 $250.000 $300.000 $295.000 $374.000 $270.000 $550.000 $400.000 $400.000 $429.390 $2,000.000
PRESTR CONC BOX BEAM (4B28)
LF 318.000 $250.000 $175.000 $245.000 $225.000 $200.000 $247.000 $260.000 $200.000 $200.000 $220.000 $272.860 $185.000
PRESTR CONC BOX BEAM (5B28)
LF 159.000 $265.000 $175.000 $245.000 $225.000 $200.000 $251.000 $260.000 $200.000 $210.000 $220.000 $283.630 $210.000
RIPRAP (CONC) (CL B) (4")
CY 109.680 $650.000 $400.000 $550.000 $500.000 $500.000 $465.000 $600.000 $430.000 $305.000 $500.000 $532.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 31.930 $500.000 $580.000 $415.000 $550.000 $875.000 $492.000 $525.000 $535.000 $400.000 $600.000 $584.880 $650.000
RAIL (TY SSTR)
LF 200.000 $37.000 $107.000 $60.000 $118.000 $95.000 $31.000 $65.000 $55.000 $150.000 $90.000 $61.990 $185.000
CONC BOX CULV (3 FT X 2 FT)
LF 27.000 $150.000 $155.000 $180.000 $215.000 $355.000 $180.000 $160.000 $240.000 $450.000 $120.000 $264.430 $650.000
CONC BOX CULV (6 FT X 3 FT)
LF 285.000 $300.000 $274.000 $250.000 $270.000 $360.000 $256.000 $270.000 $320.000 $500.000 $240.000 $394.290 $650.000
RC PIPE (CL III)(24 IN)
LF 620.000 $70.000 $63.000 $38.000 $56.000 $60.000 $50.000 $78.000 $71.000 $55.000 $40.000 $80.170 $85.000
RC PIPE (CL III)(30 IN)
LF 387.000 $100.000 $66.000 $50.000 $66.000 $95.000 $63.000 $85.000 $83.000 $85.000 $60.000 $102.070 $105.000
INLET (COMPL)(TY AAD)
EA 1.000 $4,500.000 $4,270.000 $3,800.000 $4,000.650 $4,400.000 $3,970.000 $4,200.000 $4,400.000 $4,950.000 $5,000.000 $6,740.440 $5,000.000
INLET (COMPL)(TY AZ)
EA 3.000 $6,000.000 $3,800.000 $3,600.000 $4,000.000 $4,100.000 $3,847.000 $3,700.000 $4,800.000 $3,450.000 $4,000.000 $7,295.800 $5,000.000
MANH (COMPL)(TY A)
EA 1.000 $3,000.000 $3,530.000 $3,100.000 $3,000.000 $4,050.000 $2,749.000 $3,600.000 $4,750.000 $3,500.000 $3,500.000 $5,212.590 $5,000.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 1.000 $5,000.000 $5,300.000 $5,400.000 $4,000.000 $3,500.000 $4,765.000 $3,500.000 $4,800.000 $4,150.000 $4,000.000 $6,330.130 $7,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
EA 3.000 $8,000.000 $9,600.000 $8,000.000 $8,500.000 $7,500.000 $8,495.000 $8,000.000 $10,000.000 $7,650.000 $7,000.000 $9,974.070 $8,500.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $1,000.000 $1,280.000 $1,200.000 $1,500.000 $1,500.000 $1,474.000 $2,000.000 $1,300.000 $1,250.000 $1,200.000 $1,408.100 $850.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,250.000 $1,350.000 $1,200.000 $1,600.000 $1,600.000 $1,682.000 $2,200.000 $1,750.000 $1,250.000 $1,300.000 $1,356.380 $950.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,500.000 $1,200.000 $1,300.000 $1,800.000 $1,850.000 $1,842.000 $2,400.000 $1,450.000 $1,350.000 $1,200.000 $1,459.500 $1,000.000
REMOV STR (HEADWALL)
EA 1.000 $1,800.000 $2,800.000 $4,700.000 $3,000.000 $5,000.000 $1,247.000 $9,000.000 $8,500.000 $5,500.000 $3,000.000 $1,659.810 $2,500.000
MOBILIZATION
LS 1.000 $196,745.000 $175,000.000 $240,000.000 $200,000.000 $225,000.000 $105,250.000 $130,000.000 $100,000.000 $275,000.000 $300,000.000 $286,836.000 $400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $8,000.000 $2,800.000 $2,900.000 $2,000.000 $4,000.000 $4,116.000 $3,500.000 $1,700.000 $2,250.000 $10,000.000 $10,430.400 $8,500.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 220.000 $35.000 $22.000 $31.490 $25.000 $12.000 $31.000 $25.000 $40.000 $15.000 $40.000 $27.700 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 220.000 $15.000 $9.000 $8.910 $5.000 $6.000 $9.000 $10.000 $10.000 $5.000 $12.000 $11.650 $15.000
CONSTRUCTION PERIMETER FENCE
LF 630.000 $5.000 $5.000 $3.500 $5.000 $4.000 $4.000 $4.000 $3.500 $7.000 $3.000 $5.900 $6.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,701.000 $5.000 $2.800 $2.870 $2.000 $1.800 $4.000 $2.500 $2.650 $4.000 $3.000 $3.810 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,701.000 $1.750 $1.000 $1.130 $1.000 $0.500 $1.000 $1.000 $0.500 $2.000 $1.000 $0.860 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 240.000 $7.100 $4.750 $3.500 $8.000 $6.000 $4.000 $12.000 $11.000 $8.000 $10.000 $4.490 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 240.000 $2.000 $1.700 $0.440 $1.000 $1.200 $1.000 $3.500 $2.000 $2.000 $4.000 $1.330 $8.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 2,920.000 $17.000 $10.000 $11.000 $12.000 $20.000 $8.660 $15.000 $16.000 $40.000 $6.000 $8.130 $20.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,500.000 $12.000 $10.000 $5.000 $6.000 $10.000 $5.460 $10.000 $7.000 $20.000 $2.000 $5.610 $15.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 2,920.000 $6.000 $9.000 $11.000 $8.000 $20.000 $8.550 $15.000 $14.000 $40.000 $6.000 $5.260 $15.000
DRIVEWAYS (CONC)
SY 296.000 $75.000 $65.000 $60.000 $100.000 $50.000 $70.000 $90.000 $85.000 $45.000 $65.000 $66.130 $85.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $25.000 $16.000 $18.000 $19.500 $20.000 $24.000 $24.000 $22.000 $20.000 $18.000 $27.960 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,100.000 $1,500.000 $1,385.000 $1,600.000 $1,500.000 $1,573.000 $1,850.000 $1,450.000 $1,750.000 $1,385.000 $2,092.600 $1,850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,200.000 $1,075.000 $880.000 $1,200.000 $1,000.000 $1,394.000 $1,000.000 $1,350.000 $1,500.000 $880.000 $1,382.110 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 1,203.000 $3.500 $3.000 $2.000 $2.000 $2.000 $4.460 $2.000 $4.250 $5.000 $2.000 $3.270 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $550.000 $95.000 $150.000 $125.000 $180.000 $134.000 $200.000 $130.000 $350.000 $2.000 $296.560 $1,500.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $85.000 $185.000 $150.000 $75.000 $180.000 $223.000 $200.000 $220.000 $500.000 $150.000 $164.920 $1,500.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $200.000 $370.000 $175.000 $600.000 $200.000 $246.000 $250.000 $250.000 $450.000 $175.000 $285.920 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,450.000 $2,400.000 $2,205.000 $2,400.000 $2,600.000 $2,353.000 $2,550.000 $2,350.000 $1,650.000 $2,205.000 $3,164.410 $2,850.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $400.000 $185.000 $270.000 $250.000 $324.000 $246.000 $300.000 $250.000 $750.000 $270.000 $376.230 $500.000
CRASH CUSH ATTEN (INSTL)
EA 1.000 $15,300.000 $10,000.000 $19,000.000 $19,700.000 $22,000.000 $11,150.000 $21,000.000 $20,000.000 $20,500.000 $19,000.000 $14,591.450 $15,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $3,500.000 $2,200.000 $2,215.000 $3,500.000 $2,500.000 $2,119.000 $3,000.000 $3,600.000 $1,500.000 $2,215.000 $2,717.270 $5,000.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,100.000 $900.000 $1,080.000 $1,100.000 $1,250.000 $1,003.500 $2,500.000 $1,200.000 $2,500.000 $1,080.000 $1,223.650 $2,500.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 3.000 $1,700.000 $1,700.000 $2,017.000 $2,050.000 $1,800.000 $2,286.000 $1,800.000 $1,600.000 $2,000.000 $1,585.000 $2,770.580 $1,500.000
REMOVE RD IL ASM (TRANS-BASE)
EA 3.000 $650.000 $350.000 $684.000 $525.000 $380.000 $586.000 $350.000 $350.000 $1,000.000 $320.000 $965.360 $500.000
CONDT (PVC) (SCH 80) (2")
LF 440.000 $6.500 $10.000 $6.220 $9.750 $11.000 $11.000 $10.000 $10.000 $9.000 $9.250 $10.040 $15.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 91.000 $20.000 $14.000 $13.950 $10.750 $15.000 $12.000 $14.000 $14.000 $12.000 $12.900 $28.760 $40.000
ELEC CONDR (NO.8) BARE
LF 531.000 $1.000 $1.250 $1.780 $1.350 $1.200 $2.000 $1.500 $1.250 $3.000 $1.150 $1.350 $2.000
ELEC CONDR (NO.8) INSULATED
LF 1,062.000 $1.500 $1.350 $2.050 $1.450 $1.500 $2.000 $1.500 $1.350 $5.000 $1.250 $1.860 $2.000
ELC SRV TY A 240/480 060(SS)SS(E)GC(O)
EA 1.000 $6,000.000 $7,500.000 $7,351.000 $6,327.000 $7,500.000 $7,055.000 $7,500.000 $7,300.000 $8,500.000 $6,940.000 $6,519.000 $5,000.000
ALUMINUM SIGNS (TY G)
SF 36.000 $25.000 $21.000 $33.420 $35.000 $28.500 $41.000 $22.000 $21.000 $25.000 $23.750 $32.230 $30.000
ALUMINUM SIGNS (TY O)
SF 378.000 $21.000 $18.000 $38.140 $23.500 $20.000 $27.000 $20.000 $18.500 $25.000 $17.250 $27.330 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 12.000 $575.000 $430.000 $438.000 $375.000 $500.000 $603.000 $500.000 $420.000 $250.000 $438.000 $623.200 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $540.000 $520.000 $520.000 $420.000 $600.000 $759.000 $600.000 $495.000 $250.000 $520.000 $783.330 $650.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $425.000 $270.000 $470.000 $350.000 $500.000 $480.000 $550.000 $485.000 $150.000 $470.000 $612.330 $550.000
REMOVE SM RD SN SUP&AM
EA 9.000 $200.000 $33.000 $50.000 $100.000 $60.000 $110.000 $75.000 $110.000 $100.000 $50.000 $129.710 $500.000
INSTALL LRSS (STRUCT STEEL)
LB 196.300 $4.500 $6.250 $7.440 $7.000 $5.000 $7.000 $7.000 $6.500 $8.000 $5.800 $6.220 $6.500
INS OH SN SUP(35 FT CANT)
EA 1.000 $22,000.000 $18,500.000 $15,673.500 $16,500.000 $18,500.000 $18,398.000 $18,000.000 $19,500.000 $25,000.000 $17,245.000 $25,994.330 $25,000.000
REMOVE OVERHD SIGN SUP
EA 1.000 $5,000.000 $11,000.000 $2,666.250 $14,075.000 $10,000.000 $15,694.000 $11,000.000 $1,650.000 $7,500.000 $10,155.000 $8,797.680 $2,000.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 1.000 $5,000.000 $1,700.000 $1,586.250 $1,580.000 $1,800.000 $1,762.000 $1,700.000 $11,500.000 $2,500.000 $1,575.000 $969.310 $2,000.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 780.000 $0.250 $0.270 $2.000 $0.750 $0.200 $1.340 $1.000 $0.250 $1.200 $0.250 $0.290 $1.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 484.000 $0.500 $0.550 $2.000 $1.500 $0.350 $2.120 $2.000 $0.500 $2.250 $0.500 $0.920 $1.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 2,862.000 $0.750 $0.270 $0.650 $0.700 $0.700 $0.810 $1.000 $0.250 $1.200 $0.250 $0.910 $1.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 5,086.000 $0.750 $0.270 $0.650 $0.700 $0.720 $0.810 $0.700 $0.250 $1.000 $0.250 $0.930 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,975.000 $1.000 $1.080 $1.000 $1.200 $1.000 $1.120 $0.750 $1.000 $1.000 $1.000 $1.050 $1.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $115.000 $108.000 $125.000 $125.000 $125.000 $167.250 $125.000 $100.000 $135.000 $100.000 $141.530 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $150.000 $108.000 $162.000 $125.000 $150.000 $200.700 $125.000 $100.000 $145.000 $100.000 $167.860 $150.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,117.000 $0.500 $0.700 $0.550 $0.750 $0.500 $0.990 $1.000 $0.650 $1.250 $0.650 $0.450 $1.000
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 7,550.000 $0.650 $0.650 $0.650 $1.250 $0.500 $1.230 $0.850 $0.600 $1.000 $0.600 $0.910 $1.000
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 5,720.000 $0.750 $0.650 $0.650 $1.250 $0.550 $0.640 $0.850 $0.600 $1.000 $0.600 $0.910 $1.000
REFL PAV MRKR TY II-C-R
EA 172.000 $3.500 $4.300 $3.000 $4.000 $5.000 $6.360 $6.000 $4.000 $6.750 $4.000 $4.020 $150.000
ELIM EXT PAV MRK & MRKS (4")
LF 3,100.000 $0.400 $0.220 $0.550 $0.500 $0.350 $0.890 $0.650 $0.200 $1.000 $0.200 $0.530 $1.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 1.000 $575.000 $91.000 $500.000 $250.000 $300.000 $434.850 $650.000 $85.000 $750.000 $85.000 $585.630 $150.000
VEH SIG SEC (12")LED(GRN)
EA 1.000 $200.000 $225.000 $371.250 $385.000 $250.000 $429.280 $250.000 $210.000 $200.000 $210.000 $322.280 $285.000
VEH SIG SEC (12")LED(YEL)
EA 1.000 $200.000 $225.000 $371.250 $385.000 $250.000 $429.280 $250.000 $210.000 $250.000 $210.000 $323.200 $285.000
VEH SIG SEC (12")LED(YEL ARW)
EA 1.000 $200.000 $225.000 $371.250 $385.000 $250.000 $429.280 $250.000 $210.000 $250.000 $210.000 $322.130 $285.000
VEH SIG SEC (12")LED(RED)
EA 1.000 $200.000 $225.000 $371.250 $385.000 $250.000 $429.280 $250.000 $210.000 $200.000 $210.000 $320.540 $285.000
BACK PLATE (12")(3 SEC)
EA 1.000 $100.000 $225.000 $270.000 $285.000 $250.000 $318.000 $250.000 $210.000 $175.000 $210.000 $107.470 $125.000
STRIP MOWING
CYC 2.000 $2,000.000 $269.000 $500.000 $800.000 $1,200.000 $1,060.000 $700.000 $900.000 $2,000.000 $500.000 $1,303.800 $2,000.000
LITTER REMOVAL
CYC 1.000 $1,500.000 $387.000 $1,000.000 $1,500.000 $1,500.000 $1,951.250 $700.000 $900.000 $1,250.000 $500.000 $3,293.900 $2,000.000
DEBRIS REMOVAL (FRONTAGE ROADS)
CYC 1.000 $2,000.000 $290.000 $1,000.000 $1,500.000 $1,600.000 $2,788.000 $700.000 $900.000 $2,750.000 $500.000 $3,911.400 $2,000.000
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 1.000 $1,100.000 $860.000 $500.000 $1,000.000 $500.000 $2,007.000 $1,200.000 $2,000.000 $3,500.000 $500.000 $2,618.420 $2,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $71.000 $200.000 $155.000 $100.000 $80.000 $101.000 $125.000 $80.000 $125.000 $70.000 $260.760 $125.000
Totals: $2,440,647.100 $2,297,994.985 $2,427,497.892 $2,436,500.000 $2,466,376.970 $2,498,877.334 $2,515,350.100 $2,546,304.950 $2,968,534.950 $3,046,812.940 $3,054,071.952 $4,103,286.850