|
|
PREPARING ROW
|
STA
|
13.000
|
$1,962.000
|
$1,000.000
|
$1,500.000
|
$10,912.000
|
$15,000.000
|
$3,350.000
|
$10,000.000
|
$2,000.000
|
$7,800.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
4,908.000
|
$14.000
|
$10.000
|
$10.000
|
$3.750
|
$10.000
|
$2.070
|
$7.000
|
$2.070
|
$6.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
298.000
|
$15.000
|
$8.000
|
$13.000
|
$10.000
|
$10.000
|
$7.000
|
$10.000
|
$7.000
|
$12.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
44.000
|
$15.000
|
$6.000
|
$15.000
|
$25.000
|
$10.000
|
$20.000
|
$10.000
|
$20.000
|
$18.750
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
442.000
|
$20.000
|
$6.000
|
$16.000
|
$10.000
|
$10.000
|
$7.000
|
$10.000
|
$7.000
|
$7.500
|
|
|
REMOVE CONC (RAIL)
|
LF
|
1,205.000
|
$8.950
|
$80.000
|
$87.000
|
$100.000
|
$15.000
|
$5.000
|
$60.000
|
$85.000
|
$59.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
513.000
|
$2.400
|
$4.000
|
$10.000
|
$2.100
|
$10.000
|
$4.470
|
$10.000
|
$4.470
|
$17.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-12")
|
SY
|
5,032.000
|
$2.700
|
$5.000
|
$10.000
|
$2.100
|
$10.000
|
$2.920
|
$4.000
|
$2.920
|
$11.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
943.000
|
$35.000
|
$45.000
|
$39.000
|
$19.750
|
$12.000
|
$53.000
|
$30.000
|
$5.000
|
$18.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
160.000
|
$13.000
|
$5.000
|
$57.000
|
$6.750
|
$15.000
|
$75.000
|
$20.000
|
$2.000
|
$9.000
|
|
|
BLOCK SODDING
|
SY
|
933.000
|
$7.500
|
$8.000
|
$4.000
|
$5.100
|
$5.000
|
$3.500
|
$3.500
|
$3.250
|
$10.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
933.000
|
$0.250
|
$3.000
|
$0.500
|
$2.000
|
$0.500
|
$1.350
|
$1.100
|
$1.080
|
$3.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
933.000
|
$0.250
|
$3.000
|
$0.500
|
$0.850
|
$0.500
|
$0.750
|
$1.100
|
$1.080
|
$3.250
|
|
|
FERTILIZER
|
AC
|
0.400
|
$250.000
|
$2,000.000
|
$3,000.000
|
$1,420.000
|
$1,500.000
|
$972.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
|
|
VEGETATIVE WATERING
|
MG
|
48.000
|
$6.000
|
$50.000
|
$300.000
|
$95.000
|
$35.000
|
$210.000
|
$30.000
|
$40.000
|
$75.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
13.000
|
$168.700
|
$250.000
|
$210.000
|
$65.000
|
$190.000
|
$260.000
|
$180.000
|
$175.000
|
$260.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
1,003.000
|
$5.000
|
$6.500
|
$7.000
|
$11.500
|
$5.000
|
$28.000
|
$15.000
|
$2.000
|
$11.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 70)
|
TON
|
254.000
|
$86.000
|
$250.000
|
$125.000
|
$175.000
|
$125.000
|
$124.000
|
$160.000
|
$95.000
|
$151.000
|
|
|
SLV, HAUL & STKPL RCL APH PV (13")
|
SY
|
462.000
|
$1.300
|
$4.000
|
$18.000
|
$2.200
|
$48.000
|
$45.000
|
$10.000
|
$2.000
|
$15.000
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG70-22
|
TON
|
39.000
|
$109.400
|
$250.000
|
$285.000
|
$410.000
|
$150.000
|
$283.000
|
$225.000
|
$125.000
|
$270.000
|
|
|
D-GR HMA(SQ) TY-D PG70-22
|
TON
|
39.000
|
$104.800
|
$250.000
|
$280.000
|
$400.000
|
$155.000
|
$279.000
|
$225.000
|
$125.000
|
$270.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
5,013.000
|
$120.000
|
$95.000
|
$94.000
|
$85.500
|
$145.000
|
$158.000
|
$111.000
|
$110.000
|
$133.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,029.000
|
$60.000
|
$54.000
|
$46.000
|
$110.000
|
$65.000
|
$65.000
|
$50.000
|
$65.000
|
$43.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
201.000
|
$60.000
|
$54.000
|
$60.000
|
$55.000
|
$65.000
|
$65.000
|
$50.000
|
$65.000
|
$115.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,500.000
|
$14.000
|
$1.000
|
$7.000
|
$0.010
|
$1.000
|
$1.000
|
$1.000
|
$5.000
|
$6.250
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
53.000
|
$263.000
|
$268.000
|
$400.000
|
$350.000
|
$350.000
|
$241.000
|
$250.000
|
$350.000
|
$375.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
10.000
|
$450.000
|
$490.000
|
$750.000
|
$645.000
|
$450.000
|
$700.000
|
$675.000
|
$475.000
|
$1,050.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
18.000
|
$574.000
|
$490.000
|
$750.000
|
$925.000
|
$450.000
|
$700.000
|
$700.000
|
$500.000
|
$1,020.000
|
|
|
RAIL (TY T221)
|
LF
|
786.000
|
$157.000
|
$55.000
|
$160.000
|
$125.000
|
$125.000
|
$90.000
|
$90.000
|
$65.000
|
$185.000
|
|
|
RAIL (TY PR22)
|
LF
|
312.000
|
$116.500
|
$92.000
|
$125.000
|
$190.000
|
$150.000
|
$115.000
|
$100.000
|
$125.000
|
$110.000
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
1,880.000
|
$146.700
|
$160.000
|
$275.000
|
$125.000
|
$85.000
|
$65.000
|
$260.000
|
$135.000
|
$270.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,076.000
|
$76.000
|
$90.000
|
$74.000
|
$110.000
|
$70.000
|
$102.000
|
$120.000
|
$145.000
|
$110.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
94.000
|
$76.000
|
$110.000
|
$84.000
|
$140.000
|
$85.000
|
$167.000
|
$140.000
|
$230.000
|
$138.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
334.000
|
$99.000
|
$130.000
|
$150.000
|
$190.000
|
$120.000
|
$166.000
|
$200.000
|
$260.000
|
$183.000
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
4.000
|
$5,060.000
|
$4,100.000
|
$3,200.000
|
$2,305.000
|
$3,550.000
|
$4,500.000
|
$5,000.000
|
$6,400.000
|
$3,500.000
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
20.000
|
$3,996.000
|
$4,200.000
|
$2,900.000
|
$4,450.000
|
$4,550.000
|
$6,900.000
|
$4,000.000
|
$7,800.000
|
$3,000.000
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
4.000
|
$1,399.000
|
$1,700.000
|
$1,230.000
|
$5,425.000
|
$3,650.000
|
$2,600.000
|
$1,200.000
|
$1,600.000
|
$900.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
5.000
|
$500.000
|
$2,300.000
|
$450.000
|
$800.000
|
$550.000
|
$1,100.000
|
$1,000.000
|
$1,900.000
|
$700.000
|
|
|
ADJUSTING MANHOLES(CAP)
|
EA
|
1.000
|
$1,162.000
|
$450.000
|
$450.000
|
$3,660.000
|
$650.000
|
$1,100.000
|
$1,000.000
|
$2,425.000
|
$725.000
|
|
|
REMOV STR (INLET)
|
EA
|
4.000
|
$800.000
|
$460.000
|
$650.000
|
$825.000
|
$750.000
|
$650.000
|
$500.000
|
$930.000
|
$275.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,146.000
|
$65.000
|
$11.000
|
$25.000
|
$18.250
|
$10.000
|
$12.000
|
$20.000
|
$55.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$251,301.000
|
$230,000.000
|
$130,000.000
|
$47,400.000
|
$240,000.000
|
$270,000.000
|
$275,000.000
|
$290,000.000
|
$285,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$4,600.000
|
$10,000.000
|
$7,000.000
|
$3,650.000
|
$3,500.000
|
$2,500.000
|
$9,570.000
|
$32,250.000
|
$6,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
480.000
|
$28.900
|
$25.000
|
$40.000
|
$40.000
|
$20.000
|
$28.500
|
$30.000
|
$35.000
|
$32.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
480.000
|
$9.400
|
$3.500
|
$6.000
|
$20.000
|
$10.000
|
$14.500
|
$5.000
|
$10.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
580.000
|
$2.500
|
$2.500
|
$3.000
|
$3.000
|
$5.000
|
$1.990
|
$3.000
|
$3.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
580.000
|
$0.850
|
$0.500
|
$1.000
|
$1.850
|
$1.000
|
$1.250
|
$1.000
|
$1.500
|
$1.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
900.000
|
$8.150
|
$4.000
|
$3.000
|
$4.000
|
$8.000
|
$2.790
|
$6.000
|
$7.000
|
$6.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
900.000
|
$1.150
|
$0.700
|
$1.000
|
$1.450
|
$1.000
|
$1.000
|
$1.000
|
$2.000
|
$1.250
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
840.000
|
$21.000
|
$17.000
|
$13.000
|
$33.400
|
$50.000
|
$17.000
|
$15.000
|
$15.000
|
$21.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
520.000
|
$6.750
|
$16.000
|
$13.000
|
$31.050
|
$50.000
|
$17.000
|
$15.000
|
$12.000
|
$19.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$6.800
|
$19.000
|
$13.000
|
$30.350
|
$50.000
|
$17.000
|
$15.000
|
$12.000
|
$17.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,650.000
|
$6.000
|
$7.000
|
$12.000
|
$23.800
|
$15.000
|
$10.000
|
$5.000
|
$1.000
|
$13.500
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
800.000
|
$3.650
|
$7.500
|
$13.000
|
$24.000
|
$15.000
|
$10.000
|
$5.000
|
$1.000
|
$11.500
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$5.500
|
$7.500
|
$19.000
|
$75.000
|
$25.000
|
$10.000
|
$5.000
|
$1.000
|
$11.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
840.000
|
$4.750
|
$17.000
|
$12.000
|
$35.500
|
$25.000
|
$13.000
|
$15.000
|
$8.000
|
$21.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
520.000
|
$6.200
|
$16.000
|
$13.000
|
$34.750
|
$20.000
|
$13.000
|
$10.000
|
$8.000
|
$19.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$6.950
|
$16.000
|
$19.000
|
$32.500
|
$20.000
|
$13.000
|
$10.000
|
$8.000
|
$17.000
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
88.000
|
$55.000
|
$45.000
|
$50.000
|
$94.950
|
$65.000
|
$130.000
|
$50.000
|
$100.000
|
$90.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
1,145.000
|
$15.000
|
$5.000
|
$10.000
|
$3.500
|
$7.000
|
$23.000
|
$7.000
|
$10.000
|
$13.500
|
|
|
CONC CURB (DOWEL)
|
LF
|
611.000
|
$6.000
|
$10.000
|
$25.000
|
$16.400
|
$6.000
|
$28.000
|
$12.000
|
$10.000
|
$12.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
396.000
|
$60.000
|
$55.000
|
$135.000
|
$134.500
|
$65.000
|
$235.000
|
$80.000
|
$180.800
|
$135.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
206.000
|
$43.000
|
$45.000
|
$60.000
|
$110.000
|
$75.000
|
$80.000
|
$60.000
|
$85.000
|
$66.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
$1,500.000
|
$1,300.000
|
$4,000.000
|
$2,920.000
|
$1,850.000
|
$5,700.000
|
$2,000.000
|
$4,000.000
|
$4,200.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
3.000
|
$850.000
|
$1,100.000
|
$2,200.000
|
$2,920.000
|
$1,750.000
|
$4,500.000
|
$1,500.000
|
$3,400.000
|
$3,600.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
10.000
|
$1,270.000
|
$1,100.000
|
$2,000.000
|
$2,920.000
|
$1,650.000
|
$3,500.000
|
$1,200.000
|
$3,200.000
|
$3,100.000
|
|
|
CONC SIDEWALKS (8")
|
SY
|
172.000
|
$120.000
|
$64.000
|
$85.000
|
$270.000
|
$85.000
|
$104.000
|
$80.000
|
$85.000
|
$88.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
100.000
|
$24.000
|
$28.000
|
$27.000
|
$37.250
|
$29.000
|
$39.000
|
$27.000
|
$39.000
|
$49.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,100.000
|
$1,585.000
|
$1,500.000
|
$2,080.000
|
$2,750.000
|
$1,925.000
|
$1,500.000
|
$1,925.000
|
$2,400.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
280.000
|
$2.750
|
$2.200
|
$2.000
|
$2.900
|
$5.000
|
$2.000
|
$2.000
|
$5.000
|
$4.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,878.000
|
$2,800.000
|
$2,694.000
|
$3,740.000
|
$3,500.000
|
$2,845.000
|
$2,700.000
|
$2,845.000
|
$3,500.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
190.000
|
$10.000
|
$20.500
|
$18.500
|
$25.000
|
$20.000
|
$18.450
|
$12.000
|
$17.000
|
$6.500
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
60.000
|
$18.000
|
$31.000
|
$28.000
|
$40.000
|
$35.000
|
$28.000
|
$13.000
|
$17.000
|
$20.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
65.000
|
$12.000
|
$37.800
|
$34.000
|
$50.000
|
$40.000
|
$34.000
|
$13.000
|
$20.000
|
$8.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
120.000
|
$20.000
|
$19.600
|
$18.000
|
$25.000
|
$25.000
|
$17.650
|
$15.000
|
$25.000
|
$22.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
465.000
|
$1.500
|
$1.900
|
$2.000
|
$2.500
|
$2.000
|
$1.700
|
$1.100
|
$1.800
|
$2.000
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
25.000
|
$1.750
|
$2.300
|
$2.000
|
$3.000
|
$5.000
|
$2.100
|
$1.600
|
$4.000
|
$2.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
45.000
|
$1.850
|
$2.500
|
$2.000
|
$3.250
|
$5.000
|
$2.250
|
$2.000
|
$4.000
|
$2.500
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
350.000
|
$1.900
|
$2.700
|
$2.500
|
$3.500
|
$5.000
|
$2.450
|
$2.500
|
$2.000
|
$2.650
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
6.000
|
$1,500.000
|
$1,030.000
|
$926.000
|
$1,350.000
|
$1,100.000
|
$926.000
|
$700.000
|
$1,500.000
|
$1,600.000
|
|
|
REMOVE GROUND BOX
|
EA
|
5.000
|
$304.000
|
$675.000
|
$607.000
|
$885.000
|
$750.000
|
$607.000
|
$200.000
|
$350.000
|
$225.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$4,408.000
|
$6,100.000
|
$5,490.000
|
$8,020.000
|
$6,500.000
|
$5,490.000
|
$4,000.000
|
$6,000.000
|
$3,600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$462.000
|
$800.000
|
$867.000
|
$1,050.000
|
$550.000
|
$1,100.000
|
$900.000
|
$1,100.000
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$480.000
|
$600.000
|
$652.000
|
$785.000
|
$350.000
|
$500.000
|
$650.000
|
$500.000
|
$520.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
4.000
|
$26.250
|
$20.000
|
$22.000
|
$26.300
|
$650.000
|
$30.000
|
$25.000
|
$30.000
|
$37.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
2.000
|
$86.000
|
$53.000
|
$58.000
|
$70.150
|
$550.000
|
$50.000
|
$60.000
|
$50.000
|
$62.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
6.000
|
$24.000
|
$34.000
|
$37.000
|
$43.800
|
$750.000
|
$38.000
|
$40.000
|
$38.000
|
$47.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
3,007.000
|
$0.170
|
$0.300
|
$0.350
|
$1.250
|
$1.000
|
$0.850
|
$0.850
|
$0.850
|
$1.050
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
1,862.000
|
$0.170
|
$0.300
|
$0.350
|
$1.250
|
$1.000
|
$0.850
|
$0.850
|
$0.850
|
$1.050
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,476.000
|
$0.900
|
$1.400
|
$1.150
|
$0.500
|
$0.500
|
$0.380
|
$0.380
|
$0.380
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
12.000
|
$5.950
|
$16.700
|
$13.400
|
$10.250
|
$8.000
|
$7.000
|
$7.000
|
$7.000
|
$8.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(DOT)
|
LF
|
20.000
|
$0.520
|
$2.200
|
$2.250
|
$11.700
|
$10.000
|
$8.000
|
$8.000
|
$8.000
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
6,034.000
|
$0.900
|
$1.400
|
$1.150
|
$0.650
|
$0.650
|
$0.450
|
$0.450
|
$0.450
|
$0.600
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$400.000
|
$560.000
|
$474.000
|
$305.000
|
$300.000
|
$210.000
|
$210.000
|
$210.000
|
$261.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$400.000
|
$580.000
|
$513.000
|
$585.000
|
$500.000
|
$400.000
|
$400.000
|
$400.000
|
$500.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$400.000
|
$445.000
|
$368.000
|
$400.000
|
$300.000
|
$275.000
|
$275.000
|
$275.000
|
$350.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
45.000
|
$3.600
|
$5.000
|
$5.600
|
$14.500
|
$15.000
|
$10.000
|
$10.000
|
$10.000
|
$12.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
156.000
|
$3.700
|
$5.000
|
$5.600
|
$10.250
|
$10.000
|
$7.000
|
$7.000
|
$7.000
|
$9.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
5,384.000
|
$0.450
|
$1.100
|
$0.800
|
$0.500
|
$0.500
|
$0.350
|
$0.350
|
$0.350
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
3,174.000
|
$0.250
|
$1.100
|
$0.840
|
$0.750
|
$1.000
|
$0.500
|
$0.500
|
$0.500
|
$0.650
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
80.000
|
$0.350
|
$2.200
|
$1.150
|
$1.100
|
$1.250
|
$0.750
|
$0.750
|
$0.750
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
449.000
|
$1.000
|
$2.200
|
$1.150
|
$1.450
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$1.250
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
57.000
|
$2.000
|
$3.300
|
$3.350
|
$4.500
|
$4.000
|
$3.000
|
$3.000
|
$3.000
|
$3.750
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
6.000
|
$50.000
|
$220.000
|
$89.250
|
$51.000
|
$50.000
|
$35.000
|
$35.000
|
$35.000
|
$45.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$50.000
|
$105.000
|
$89.250
|
$58.450
|
$50.000
|
$40.000
|
$40.000
|
$40.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
13,011.000
|
$0.120
|
$0.040
|
$0.030
|
$0.100
|
$0.100
|
$0.050
|
$0.050
|
$0.050
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
10,838.000
|
$0.050
|
$0.040
|
$0.030
|
$0.150
|
$0.100
|
$0.080
|
$0.080
|
$0.080
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
280.000
|
$0.200
|
$0.100
|
$0.120
|
$0.150
|
$0.250
|
$0.100
|
$0.100
|
$0.100
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
554.000
|
$0.500
|
$0.600
|
$0.560
|
$0.200
|
$0.200
|
$0.120
|
$0.120
|
$0.120
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
60.000
|
$1.000
|
$0.600
|
$0.560
|
$0.750
|
$0.750
|
$0.500
|
$0.500
|
$0.500
|
$0.750
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
5.000
|
$17.800
|
$22.000
|
$22.500
|
$7.300
|
$6.000
|
$5.000
|
$5.000
|
$5.000
|
$6.500
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$11.500
|
$22.000
|
$22.500
|
$14.600
|
$11.000
|
$10.000
|
$10.000
|
$10.000
|
$12.500
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
8.000
|
$16.500
|
$22.000
|
$22.500
|
$14.600
|
$11.000
|
$10.000
|
$10.000
|
$10.000
|
$12.500
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
1.000
|
$31,845.000
|
$31,000.000
|
$27,496.000
|
$40,100.000
|
$35,000.000
|
$27,469.000
|
$33,000.000
|
$32,500.000
|
$40,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$4,016.000
|
$3,500.000
|
$3,035.000
|
$4,435.000
|
$4,200.000
|
$3,034.000
|
$4,300.000
|
$3,000.000
|
$2,200.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$41,170.000
|
$50,000.000
|
$33,291.000
|
$48,635.000
|
$41,000.000
|
$33,290.000
|
$38,000.000
|
$63,861.000
|
$70,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
10.000
|
$215.000
|
$265.000
|
$240.000
|
$350.000
|
$350.000
|
$239.200
|
$200.000
|
$260.000
|
$190.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
2.000
|
$208.000
|
$285.000
|
$256.000
|
$375.000
|
$350.000
|
$255.850
|
$200.000
|
$260.000
|
$190.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
10.000
|
$216.000
|
$270.000
|
$242.000
|
$350.000
|
$350.000
|
$241.550
|
$200.000
|
$260.000
|
$190.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
2.000
|
$214.000
|
$270.000
|
$245.000
|
$350.000
|
$350.000
|
$245.000
|
$200.000
|
$260.000
|
$190.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
10.000
|
$216.000
|
$270.000
|
$694.000
|
$350.000
|
$250.000
|
$240.000
|
$200.000
|
$260.000
|
$190.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
2.000
|
$208.000
|
$270.000
|
$54.000
|
$350.000
|
$350.000
|
$245.000
|
$200.000
|
$260.000
|
$190.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
6.000
|
$500.000
|
$770.000
|
$85.000
|
$1,015.000
|
$750.000
|
$694.000
|
$500.000
|
$725.000
|
$850.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
8.000
|
$93.000
|
$60.000
|
$54.000
|
$75.000
|
$65.000
|
$53.550
|
$120.000
|
$120.000
|
$66.000
|
|
|
BACK PLATE (12")(5 SEC)
|
EA
|
2.000
|
$111.000
|
$95.000
|
$85.000
|
$125.000
|
$100.000
|
$84.500
|
$140.000
|
$190.000
|
$90.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
600.000
|
$1.500
|
$1.500
|
$1.500
|
$2.050
|
$2.000
|
$1.400
|
$1.100
|
$1.800
|
$2.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
600.000
|
$2.000
|
$2.000
|
$2.000
|
$2.750
|
$2.000
|
$1.900
|
$1.500
|
$2.300
|
$2.250
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
965.000
|
$2.000
|
$3.000
|
$2.800
|
$3.950
|
$3.000
|
$2.700
|
$2.000
|
$3.000
|
$2.900
|
|
|
INS TRF SIG PL AM (S)1 ARM(24')
|
EA
|
1.000
|
$4,986.000
|
$7,200.000
|
$6,430.000
|
$9,400.000
|
$7,500.000
|
$6,430.000
|
$7,500.000
|
$8,900.000
|
$8,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(24')LUM
|
EA
|
1.000
|
$5,954.000
|
$9,200.000
|
$8,276.000
|
$12,100.000
|
$9,500.000
|
$8,275.250
|
$9,000.000
|
$11,800.000
|
$10,300.000
|
|
|
INS TRF SIG PL AM (S)1 ARM(28')
|
EA
|
1.000
|
$5,371.000
|
$7,400.000
|
$6,668.000
|
$9,750.000
|
$7,500.000
|
$6,667.900
|
$8,000.000
|
$9,500.000
|
$8,400.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
1.000
|
$7,565.000
|
$10,250.000
|
$9,212.000
|
$13,500.000
|
$11,000.000
|
$9,211.800
|
$10,000.000
|
$12,500.000
|
$11,500.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
6.000
|
$1,800.000
|
$1,900.000
|
$1,684.000
|
$2,460.000
|
$1,850.000
|
$1,683.900
|
$1,800.000
|
$3,000.000
|
$2,700.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
6.000
|
$575.000
|
$1,020.000
|
$920.000
|
$1,245.000
|
$1,100.000
|
$920.000
|
$600.000
|
$700.000
|
$1,400.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$3,200.000
|
$2,070.000
|
$1,858.000
|
$2,715.000
|
$2,000.000
|
$1,858.000
|
$3,200.000
|
$3,800.000
|
$3,200.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$1,906.000
|
$910.000
|
$1,649.000
|
$2,190.000
|
$1,500.000
|
$7,500.000
|
$500.000
|
$4,000.000
|
$2,200.000
|
|
|
LITTER REMOVAL
|
CYC
|
3.000
|
$1,111.000
|
$310.000
|
$707.000
|
$1,460.000
|
$2,500.000
|
$1,500.000
|
$500.000
|
$2,700.000
|
$2,200.000
|
|
|
TRENCH DRAIN
|
LF
|
130.000
|
$200.000
|
$320.000
|
$300.000
|
$365.250
|
$85.000
|
$800.000
|
$650.000
|
$650.000
|
$625.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
14.000
|
$49.000
|
$250.000
|
$278.000
|
$290.000
|
$110.000
|
$50.000
|
$100.000
|
$175.000
|
$78.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
3,337.000
|
$0.700
|
$0.650
|
$0.840
|
$1.400
|
$1.000
|
$0.950
|
$0.950
|
$0.950
|
$1.250
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
600.000
|
$0.700
|
$0.650
|
$0.840
|
$1.450
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$1.250
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
111.000
|
$1.000
|
$2.200
|
$2.250
|
$2.200
|
$2.500
|
$1.500
|
$1.500
|
$1.500
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
280.000
|
$1.800
|
$1.100
|
$2.250
|
$1.750
|
$2.000
|
$1.200
|
$1.200
|
$1.200
|
$1.600
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
279.000
|
$2.600
|
$6.700
|
$6.700
|
$5.100
|
$4.000
|
$3.500
|
$3.500
|
$3.500
|
$4.500
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
48.000
|
$5.000
|
$13.300
|
$16.750
|
$11.700
|
$10.000
|
$8.000
|
$8.000
|
$8.000
|
$10.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
6,190.000
|
$0.700
|
$0.700
|
$0.840
|
$1.450
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$1.250
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
275.000
|
$2.000
|
$6.700
|
$8.900
|
$7.300
|
$6.000
|
$5.000
|
$5.000
|
$5.000
|
$6.300
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
600.000
|
$0.750
|
$0.700
|
$0.840
|
$1.450
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$1.250
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$6,589.000
|
$7,400.000
|
$6,664.000
|
$9,735.000
|
$7,500.000
|
$6,664.000
|
$9,500.000
|
$7,600.000
|
$7,100.000
|
|
|
GPS COMMUNICATIONS UNIT
|
EA
|
1.000
|
$812.000
|
$1,500.000
|
$1,317.000
|
$1,925.000
|
$1,500.000
|
$1,317.000
|
$800.000
|
$1,000.000
|
$1,200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
2.000
|
$284.000
|
$1,100.000
|
$1,069.000
|
$5,113.000
|
$650.000
|
$400.000
|
$250.000
|
$750.000
|
$575.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
16.000
|
$15.000
|
$200.000
|
$67.750
|
$146.100
|
$250.000
|
$100.000
|
$75.000
|
$125.000
|
$52.000
|
|
|
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
|
EA
|
4.000
|
$1,453.000
|
$280.000
|
$253.000
|
$370.000
|
$500.000
|
$252.900
|
$500.000
|
$950.000
|
$1,100.000
|
|
|
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
|
EA
|
2.000
|
$1,500.000
|
$280.000
|
$253.000
|
$370.000
|
$500.000
|
$252.900
|
$500.000
|
$1,000.000
|
$1,150.000
|
|
Totals: |
$2,421,869.900
|
$2,399,431.610
|
$2,626,498.350
|
$2,629,878.800
|
$2,693,209.300
|
$2,762,331.460
|
$2,853,926.050
|
$3,052,078.890
|
$3,214,738.700
|