PREPARING ROW
|
STA
|
96.850
|
$2,671.580
|
$7,000.000
|
$8,776.460
|
$17,450.000
|
$7,500.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
10,878.000
|
$5.890
|
$2.160
|
$8.000
|
$3.400
|
$1.920
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
1,765.000
|
$14.340
|
$1.920
|
$10.000
|
$2.000
|
$1.920
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
5,946.000
|
$7.130
|
$1.250
|
$8.000
|
$0.800
|
$1.250
|
|
|
REMOVING CONC (HEADWALL)
|
CY
|
80.000
|
$252.500
|
$80.940
|
$150.000
|
$31.500
|
$100.000
|
|
|
REMOVE STAB BASE & ASPH PAV (13"-18")
|
SY
|
37,619.000
|
$4.880
|
$2.250
|
$6.500
|
$2.300
|
$2.560
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
81,466.000
|
$8.140
|
$7.000
|
$6.640
|
$8.750
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
55,460.000
|
$8.720
|
$14.000
|
$2.830
|
$7.200
|
$2.500
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
11,033.000
|
$33.650
|
$40.000
|
$39.890
|
$46.000
|
$35.000
|
|
|
EMB(FNL)(DC)(TYE)(CSBE)(RWALL FND IMPR
|
CY
|
2,327.000
|
$45.000
|
$40.000
|
$50.000
|
$51.000
|
$40.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
28,729.000
|
$1.290
|
$0.610
|
$0.610
|
$0.680
|
$0.700
|
|
|
BLOCK SODDING
|
SY
|
55,761.000
|
$2.820
|
$2.480
|
$2.480
|
$2.500
|
$3.250
|
|
|
STRAW OR HAY MULCH
|
SY
|
57,457.000
|
$0.240
|
$0.210
|
$0.210
|
$0.220
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
26,748.000
|
$0.140
|
$0.070
|
$0.070
|
$0.080
|
$0.130
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
SY
|
28,729.000
|
$0.150
|
$0.130
|
$0.130
|
$0.140
|
$0.140
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
28,729.000
|
$0.130
|
$0.070
|
$0.070
|
$0.080
|
$0.130
|
|
|
FERTILIZER
|
AC
|
23.460
|
$637.810
|
$698.580
|
$698.580
|
$700.000
|
$700.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,815.200
|
$9.670
|
$20.560
|
$20.560
|
$10.000
|
$25.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
51,100.000
|
$2.070
|
$2.850
|
$3.780
|
$3.850
|
$3.500
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
690.000
|
$159.000
|
$152.000
|
$152.000
|
$132.000
|
$165.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
51,100.000
|
$8.000
|
$13.000
|
$13.530
|
$10.800
|
$15.000
|
|
|
CEM TRT(PLNT MX) (CLN)(TYA)(GR1-2)(12")
|
SY
|
6,741.000
|
$15.000
|
$25.000
|
$24.170
|
$29.500
|
$35.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
2,810.000
|
$55.530
|
$105.260
|
$78.000
|
$84.000
|
$80.000
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG70-22
|
TON
|
1,276.000
|
$102.790
|
$131.210
|
$88.000
|
$93.000
|
$90.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
995.000
|
$3.000
|
$1.070
|
$2.550
|
$5.000
|
$8.750
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
48,167.000
|
$39.980
|
$67.000
|
$61.630
|
$73.000
|
$65.000
|
|
|
STRUCT EXCAV
|
CY
|
8,583.000
|
$13.030
|
$7.550
|
$15.000
|
$2.500
|
$7.250
|
|
|
CEM STABIL BKFL
|
CY
|
4,352.000
|
$77.190
|
$35.000
|
$45.000
|
$46.000
|
$40.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
514.000
|
$43.560
|
$35.000
|
$37.380
|
$46.000
|
$40.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
315.000
|
$160.000
|
$125.000
|
$150.000
|
$175.000
|
$125.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
5,599.000
|
$2.620
|
$1.000
|
$1.280
|
$6.300
|
$0.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
16,159.000
|
$16.420
|
$1.000
|
$4.000
|
$5.000
|
$0.500
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,156.000
|
$162.070
|
$130.000
|
$134.180
|
$172.000
|
$185.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
4,252.000
|
$226.890
|
$175.000
|
$189.400
|
$185.000
|
$275.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
818.000
|
$330.610
|
$265.000
|
$302.310
|
$300.000
|
$300.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
35.000
|
$61.000
|
$50.000
|
$30.170
|
$81.000
|
$80.000
|
|
|
CL B CONC (MISC)
|
CY
|
91.500
|
$400.000
|
$350.000
|
$214.800
|
$445.000
|
$550.000
|
|
|
CL C CONC (ABUT)
|
CY
|
113.600
|
$1,036.290
|
$800.000
|
$710.000
|
$670.000
|
$925.000
|
|
|
CL C CONC (CAP)
|
CY
|
1,990.700
|
$768.270
|
$850.000
|
$1,120.000
|
$610.000
|
$850.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
1,705.900
|
$745.270
|
$950.000
|
$855.000
|
$900.000
|
$850.000
|
|
|
CL C CONC (FOOTING)(MASS)
|
CY
|
853.100
|
$413.040
|
$600.000
|
$450.000
|
$640.000
|
$850.000
|
|
|
REINF CONC SLAB
|
SF
|
165,095.000
|
$16.010
|
$12.000
|
$14.000
|
$14.600
|
$13.500
|
|
|
RETAINING WALL (MSE)(HORIZONTAL SCHEME)
|
SF
|
56,215.000
|
$33.000
|
$20.000
|
$45.000
|
$42.000
|
$50.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
9,266.380
|
$136.230
|
$120.000
|
$109.700
|
$120.000
|
$115.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
11,189.310
|
$135.430
|
$120.000
|
$116.890
|
$127.000
|
$120.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
116.200
|
$377.170
|
$375.000
|
$440.000
|
$480.000
|
$475.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
261.000
|
$500.000
|
$350.000
|
$410.000
|
$387.000
|
$475.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
675.000
|
$334.420
|
$350.000
|
$400.000
|
$382.000
|
$475.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
99.000
|
$136.330
|
$110.000
|
$130.790
|
$158.000
|
$175.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
8.000
|
$133.200
|
$350.000
|
$129.230
|
$151.000
|
$175.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
246.000
|
$439.670
|
$400.000
|
$550.000
|
$248.000
|
$375.000
|
|
|
RAIL (TY SSTR)
|
LF
|
3,860.000
|
$42.780
|
$35.000
|
$40.000
|
$46.000
|
$50.000
|
|
|
RAIL (TY PR1)
|
LF
|
45.100
|
$81.590
|
$150.000
|
$128.000
|
$118.000
|
$100.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
4,660.700
|
$32.450
|
$35.000
|
$45.000
|
$39.000
|
$55.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
741.000
|
$97.130
|
$60.000
|
$76.110
|
$79.000
|
$110.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
|
LF
|
103.000
|
$100.750
|
$60.000
|
$82.130
|
$79.000
|
$110.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
202.000
|
$91.370
|
$60.000
|
$87.170
|
$100.000
|
$110.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
35.000
|
$66.030
|
$80.000
|
$48.310
|
$74.000
|
$125.000
|
|
|
CMP (GAL STL 60 IN)
|
LF
|
88.000
|
$130.000
|
$120.000
|
$115.380
|
$114.000
|
$250.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
341.000
|
$360.850
|
$300.000
|
$176.790
|
$212.000
|
$230.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
378.000
|
$338.310
|
$350.000
|
$185.410
|
$218.000
|
$270.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
277.000
|
$364.570
|
$325.000
|
$207.400
|
$246.000
|
$290.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,332.000
|
$70.650
|
$55.000
|
$48.150
|
$48.000
|
$65.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
363.000
|
$87.480
|
$75.000
|
$60.150
|
$70.000
|
$90.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,437.000
|
$115.160
|
$90.000
|
$66.770
|
$80.000
|
$105.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
365.000
|
$146.690
|
$100.000
|
$73.430
|
$87.000
|
$120.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
520.000
|
$184.860
|
$130.000
|
$94.950
|
$96.000
|
$130.000
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
419.000
|
$214.430
|
$170.000
|
$117.130
|
$128.000
|
$175.000
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
140.000
|
$237.810
|
$190.000
|
$131.960
|
$158.000
|
$195.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
4.000
|
$5,166.670
|
$3,800.000
|
$3,795.140
|
$4,200.000
|
$5,000.000
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
2.000
|
$6,093.750
|
$5,308.270
|
$5,037.260
|
$5,000.000
|
$5,500.000
|
|
|
INLET (COMPL)(PSL)(RH)(6FTX6FT)
|
EA
|
1.000
|
$6,700.000
|
$6,177.370
|
$5,112.250
|
$8,800.000
|
$10,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX5FT)
|
EA
|
1.000
|
$5,504.290
|
$6,505.690
|
$7,414.750
|
$9,100.000
|
$10,000.000
|
|
|
INLET (COMPL)(PSL)(RC)(8FTX8FT)
|
EA
|
3.000
|
$11,031.580
|
$12,487.550
|
$9,375.250
|
$13,000.000
|
$15,000.000
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
17.000
|
$4,178.290
|
$6,340.270
|
$5,354.910
|
$5,700.000
|
$6,500.000
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
14.000
|
$2,692.000
|
$4,924.000
|
$4,450.730
|
$4,300.000
|
$3,850.000
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
1.000
|
$4,500.000
|
$4,517.480
|
$4,154.390
|
$4,700.000
|
$4,000.000
|
|
|
INLET (COMPL)(TY AZR)
|
EA
|
1.000
|
$6,569.830
|
$5,208.860
|
$5,098.140
|
$4,600.000
|
$5,000.000
|
|
|
INLET (COMPL)(TY AZR2G)
|
EA
|
12.000
|
$6,128.000
|
$6,469.830
|
$6,172.810
|
$6,400.000
|
$7,500.000
|
|
|
INLET (COMPL)(TY C)
|
EA
|
5.000
|
$3,765.840
|
$3,791.100
|
$4,056.640
|
$3,600.000
|
$4,000.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
1.000
|
$20,000.000
|
$10,610.060
|
$10,320.790
|
$15,000.000
|
$14,500.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$6,569.830
|
$19,438.200
|
$21,292.380
|
$31,500.000
|
$17,500.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$25,891.280
|
$13,941.150
|
$15,855.130
|
$24,100.000
|
$15,500.000
|
|
|
WINGWALL (SW - 0) (HW=7 FT)
|
EA
|
1.000
|
$8,490.000
|
$14,425.530
|
$9,836.260
|
$15,000.000
|
$14,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,079.400
|
$1,862.860
|
$1,220.610
|
$1,400.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$1,413.690
|
$1,864.190
|
$1,220.610
|
$1,200.000
|
$1,400.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$2,515.330
|
$2,682.980
|
$1,510.460
|
$1,360.000
|
$1,600.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (P)
|
EA
|
10.000
|
$2,526.400
|
$4,878.190
|
$2,498.440
|
$3,800.000
|
$3,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
11.000
|
$330.000
|
$907.270
|
$631.790
|
$680.000
|
$1,000.000
|
|
|
REMOV STR (SET)
|
EA
|
3.000
|
$684.000
|
$907.200
|
$467.410
|
$400.000
|
$800.000
|
|
|
REMOV STR (PIPE)
|
LF
|
469.000
|
$34.000
|
$18.560
|
$15.760
|
$13.000
|
$35.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,194,463.800
|
$2,375,000.000
|
$2,120,265.160
|
$1,700,000.000
|
$2,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$8,657.880
|
$7,000.000
|
$5,339.720
|
$10,750.000
|
$6,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
270.000
|
$27.320
|
$27.480
|
$27.480
|
$35.000
|
$35.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
40.000
|
$25.670
|
$32.700
|
$32.700
|
$41.000
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
310.000
|
$7.920
|
$9.830
|
$9.830
|
$12.500
|
$5.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
300.000
|
$25.750
|
$84.560
|
$84.560
|
$106.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
300.000
|
$7.900
|
$20.380
|
$20.380
|
$26.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,560.000
|
$2.350
|
$4.690
|
$4.690
|
$5.900
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,560.000
|
$0.630
|
$1.200
|
$1.200
|
$1.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
760.000
|
$6.180
|
$4.540
|
$4.540
|
$5.700
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
760.000
|
$1.350
|
$1.200
|
$1.200
|
$1.500
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
8,750.000
|
$48.680
|
$65.000
|
$54.500
|
$65.000
|
$60.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
815.000
|
$7.000
|
$8.000
|
$15.000
|
$9.500
|
$12.500
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$8.000
|
$8.000
|
$25.000
|
$8.500
|
$12.500
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
815.000
|
$3.500
|
$6.000
|
$6.450
|
$5.600
|
$10.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$5.920
|
$6.000
|
$33.460
|
$7.500
|
$10.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
815.000
|
$7.000
|
$8.000
|
$10.000
|
$8.700
|
$7.500
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$8.000
|
$8.000
|
$25.000
|
$9.600
|
$7.500
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
42.000
|
$50.000
|
$64.380
|
$70.240
|
$110.000
|
$50.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
4,117.000
|
$8.500
|
$5.000
|
$9.250
|
$2.600
|
$5.000
|
|
|
CONC CURB (MOUNTABLE)
|
LF
|
100.000
|
$6.640
|
$5.000
|
$9.000
|
$5.300
|
$45.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
839.000
|
$75.360
|
$60.000
|
$75.000
|
$68.000
|
$85.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
703.000
|
$34.650
|
$68.050
|
$47.720
|
$35.500
|
$50.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,893.000
|
$18.530
|
$19.500
|
$14.500
|
$22.500
|
$22.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$859.610
|
$530.000
|
$450.000
|
$1,150.000
|
$1,125.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$1,588.800
|
$1,380.000
|
$1,225.000
|
$1,670.000
|
$1,662.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
304.000
|
$2.340
|
$1.500
|
$1.750
|
$5.100
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
$2,194.490
|
$2,170.000
|
$1,775.000
|
$2,260.000
|
$2,254.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$11,963.290
|
$19,800.000
|
$19,200.000
|
$22,000.000
|
$10,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(W)(TL3)
|
EA
|
1.000
|
$28,000.000
|
$31,700.000
|
$31,000.000
|
$34,000.000
|
$25,000.000
|
|
|
IN RD IL AM (U/P) (TY 1) (150W) S
|
EA
|
8.000
|
$1,346.950
|
$1,085.000
|
$1,085.000
|
$970.000
|
$940.170
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
8.000
|
$1,327.090
|
$1,000.000
|
$1,000.000
|
$945.000
|
$940.170
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
80.000
|
$7.990
|
$16.500
|
$16.500
|
$9.800
|
$9.740
|
|
|
CONDT (PVC) (SCH 40) (2") (CONC ENCSE)
|
LF
|
485.000
|
$10.060
|
$17.500
|
$17.500
|
$12.200
|
$12.160
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
120.000
|
$8.250
|
$18.500
|
$18.500
|
$12.600
|
$12.550
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
30.000
|
$6.240
|
$20.000
|
$20.000
|
$10.000
|
$9.810
|
|
|
CONDT (RM) (1 1/4")
|
LF
|
639.000
|
$14.850
|
$20.000
|
$20.000
|
$13.100
|
$13.010
|
|
|
CONDT (RM) (2")
|
LF
|
430.000
|
$29.390
|
$25.000
|
$25.000
|
$16.300
|
$16.210
|
|
|
CONDT (RM) (3")
|
LF
|
210.000
|
$42.760
|
$30.000
|
$30.000
|
$22.400
|
$22.260
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
767.000
|
$0.980
|
$1.300
|
$1.300
|
$1.650
|
$1.630
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,534.000
|
$1.050
|
$1.350
|
$1.350
|
$1.800
|
$1.760
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,114.000
|
$1.330
|
$1.400
|
$1.400
|
$1.800
|
$1.780
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
190.000
|
$1.670
|
$1.750
|
$1.750
|
$2.050
|
$2.030
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
355.000
|
$2.270
|
$1.850
|
$1.850
|
$2.050
|
$2.030
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
480.000
|
$2.080
|
$1.900
|
$1.900
|
$2.310
|
$2.300
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$890.640
|
$650.000
|
$650.000
|
$1,470.000
|
$1,449.890
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$876.080
|
$700.000
|
$700.000
|
$1,500.000
|
$1,486.190
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)TP(O)
|
EA
|
1.000
|
$4,300.000
|
$3,895.000
|
$3,895.000
|
$3,500.000
|
$3,432.220
|
|
|
ELC SRV TY D 120/240 070(NS)SS(N)SP(O)
|
EA
|
1.000
|
$4,500.000
|
$3,895.000
|
$3,895.000
|
$4,000.000
|
$3,876.900
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
181.750
|
$19.500
|
$23.550
|
$21.200
|
$31.000
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
28.000
|
$474.310
|
$525.000
|
$61.000
|
$450.000
|
$445.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
18.000
|
$517.600
|
$685.000
|
$86.000
|
$625.000
|
$620.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$670.150
|
$715.000
|
$155.000
|
$540.000
|
$536.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
7.000
|
$825.080
|
$1,155.000
|
$115.000
|
$1,100.000
|
$1,028.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
8.000
|
$985.240
|
$1,200.000
|
$159.000
|
$1,050.000
|
$1,016.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$915.530
|
$1,525.000
|
$265.000
|
$1,950.000
|
$1,900.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$1,560.000
|
$1,440.000
|
$150.000
|
$1,550.000
|
$2,862.300
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,087.300
|
$5.500
|
$3.600
|
$4.580
|
$3.300
|
$3.250
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
29.000
|
$18.140
|
$17.000
|
$1.800
|
$18.500
|
$18.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 2(WC)GND
|
EA
|
27.000
|
$43.000
|
$46.000
|
$18.000
|
$43.000
|
$42.000
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
5.000
|
$185.810
|
$215.000
|
$105.000
|
$255.000
|
$250.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
27.000
|
$3.480
|
$10.000
|
$4.000
|
$4.400
|
$3.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
88.000
|
$2.960
|
$1.000
|
$2.000
|
$1.630
|
$1.300
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
21,931.000
|
$0.620
|
$0.650
|
$0.650
|
$0.700
|
$0.560
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
173.000
|
$7.240
|
$6.000
|
$6.000
|
$8.400
|
$6.700
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
10.000
|
$136.800
|
$95.000
|
$95.000
|
$125.000
|
$100.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
9.000
|
$171.320
|
$115.000
|
$115.000
|
$150.000
|
$120.000
|
|
|
WK ZN PAV MRK REMOV (W)18"(YLD TRI)
|
EA
|
7.000
|
$21.220
|
$35.000
|
$35.000
|
$175.000
|
$140.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
23,653.000
|
$0.620
|
$0.650
|
$0.650
|
$0.700
|
$0.560
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
410.000
|
$0.830
|
$1.100
|
$1.100
|
$1.750
|
$1.700
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
240.000
|
$2.570
|
$2.250
|
$2.250
|
$2.650
|
$2.600
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
184.000
|
$5.410
|
$4.500
|
$4.500
|
$5.350
|
$5.300
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
1.000
|
$425.000
|
$400.000
|
$400.000
|
$295.000
|
$290.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
750.000
|
$1.310
|
$1.100
|
$1.100
|
$2.300
|
$2.200
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
500.000
|
$2.800
|
$2.250
|
$2.250
|
$2.700
|
$2.600
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
1.000
|
$226.740
|
$250.000
|
$250.000
|
$375.000
|
$370.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
4,350.000
|
$0.110
|
$0.200
|
$0.200
|
$0.090
|
$0.080
|
|
|
PAVEMENT SEALER 8"
|
LF
|
910.000
|
$0.280
|
$0.400
|
$0.400
|
$0.150
|
$0.140
|
|
|
PAVEMENT SEALER 12"
|
LF
|
740.000
|
$0.790
|
$0.900
|
$0.900
|
$0.380
|
$0.370
|
|
|
PAVEMENT SEALER 24"
|
LF
|
135.000
|
$1.830
|
$1.800
|
$1.800
|
$0.600
|
$0.590
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
1.000
|
$97.600
|
$25.000
|
$25.000
|
$80.000
|
$79.000
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
1.000
|
$164.030
|
$35.000
|
$35.000
|
$122.000
|
$120.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(060MIL)
|
LF
|
800.000
|
$0.440
|
$0.600
|
$0.600
|
$1.000
|
$0.970
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,190.000
|
$0.390
|
$0.600
|
$0.600
|
$1.150
|
$1.100
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
420.000
|
$0.440
|
$0.550
|
$0.550
|
$1.150
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
2,080.000
|
$0.400
|
$0.550
|
$0.550
|
$1.150
|
$1.100
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
22.000
|
$200.140
|
$210.000
|
$210.000
|
$255.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
1.000
|
$346.440
|
$360.000
|
$360.000
|
$385.000
|
$380.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
23.000
|
$262.540
|
$225.000
|
$225.000
|
$325.000
|
$320.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
150.000
|
$3.260
|
$4.000
|
$4.000
|
$4.100
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
891.000
|
$2.920
|
$4.000
|
$4.000
|
$4.100
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
199.000
|
$3.220
|
$4.000
|
$4.000
|
$4.100
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,200.000
|
$0.360
|
$0.450
|
$0.450
|
$0.660
|
$0.650
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
100.000
|
$3.260
|
$2.000
|
$2.000
|
$2.100
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
43,010.000
|
$0.040
|
$0.010
|
$0.010
|
$0.110
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,310.000
|
$0.150
|
$0.010
|
$0.010
|
$0.140
|
$0.130
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
200.000
|
$0.550
|
$0.010
|
$0.010
|
$0.210
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,360.000
|
$1.130
|
$0.400
|
$0.260
|
$0.270
|
$0.260
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
22.000
|
$13.250
|
$5.000
|
$5.000
|
$8.000
|
$7.900
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
1.000
|
$20.220
|
$5.000
|
$5.000
|
$9.900
|
$9.800
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
23.000
|
$15.780
|
$5.000
|
$5.000
|
$8.000
|
$7.900
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
1,064.000
|
$0.600
|
$0.010
|
$0.010
|
$0.030
|
$0.020
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$25,000.000
|
$25,000.000
|
$25,000.000
|
$29,800.000
|
$29,595.940
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$240.100
|
$250.000
|
$250.000
|
$175.000
|
$173.340
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
8.000
|
$51.710
|
$115.000
|
$115.000
|
$53.000
|
$52.340
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
1,590.000
|
$1.960
|
$1.750
|
$1.750
|
$1.900
|
$1.880
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
1.000
|
$6,101.170
|
$6,725.000
|
$6,725.000
|
$6,900.000
|
$6,828.030
|
|
|
INS TRF SIG PL AM(S)2 ARM(44-36')LUM
|
EA
|
1.000
|
$10,652.560
|
$12,115.000
|
$12,115.000
|
$10,400.000
|
$10,269.270
|
|
|
STRIP MOWING
|
CYC
|
22.000
|
$1,825.960
|
$2,871.780
|
$500.000
|
$950.000
|
$1,250.000
|
|
|
LITTER REMOVAL
|
CYC
|
24.000
|
$2,341.680
|
$681.180
|
$1,477.760
|
$1,650.000
|
$1,750.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
24.000
|
$2,410.710
|
$1,362.960
|
$1,433.330
|
$1,450.000
|
$1,500.000
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
CYC
|
24.000
|
$2,145.100
|
$500.000
|
$1,528.170
|
$1,450.000
|
$1,500.000
|
|
|
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
|
LF
|
145.000
|
$200.000
|
$20.000
|
$125.000
|
$41.500
|
$130.000
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
232.000
|
$212.000
|
$500.000
|
$84.420
|
$245.000
|
$450.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
98.000
|
$80.550
|
$146.780
|
$68.640
|
$125.000
|
$100.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
15,110.000
|
$0.510
|
$0.600
|
$0.600
|
$0.470
|
$0.460
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
2,270.000
|
$0.890
|
$0.650
|
$0.650
|
$0.550
|
$0.540
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
2,210.000
|
$0.920
|
$1.400
|
$1.400
|
$1.500
|
$1.400
|
|
MULTIPOLYMER PAV MRK (W)(8")(DOT)
|
LF
|
100.000
|
$5.000
|
$1.800
|
$1.800
|
$2.700
|
$2.600
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
200.000
|
$2.390
|
$3.160
|
$3.150
|
$2.900
|
$2.800
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
165.000
|
$7.390
|
$6.300
|
$6.300
|
$5.700
|
$5.600
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
23,360.000
|
$0.540
|
$0.600
|
$0.600
|
$0.470
|
$0.460
|
|
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
|
LF
|
2,195.000
|
$4.520
|
$6.300
|
$6.300
|
$5.700
|
$5.600
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
2,270.000
|
$1.060
|
$0.850
|
$0.850
|
$0.530
|
$0.520
|
|
Totals: |
$24,301,745.443
|
$24,827,885.131
|
$25,766,227.186
|
$26,559,912.650
|
$26,988,597.395
|