FISHER CR (0908-23-053)

Items: 33

County: FISHER
Length: N/A
Highway: CR
District: ABILENE
Control Number: 0908-23-053
DBE Goal: N/A
Project: BR 2023(945)
Guaranty: N/A
Time: 96 WORKING DAYS
Engineer's Estimate: $714,307.55
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
STEWART CHAPMAN
MAXIE ALLEN
JOSE CABRERA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$714,307.55
$917,198.00
Over/Under Est: 28.4% $202,890.45
Over/Under Est: 30.88% $220,606.45
Amt Left: 1.93% $17,716.00
$1,121,698.00
Over/Under Est: 57.03% $407,390.45
Amt Left: 22.3% $204,500.00
Delta: -19.98% -$186,784.00
Subcontractor Percentage Amount
HARDY HOLE DRILLING 4.97% $45,584.74
BARRICADES UNLIMITED 0.90% $8,254.78
Total: 5.87% $53,839.52

Bid Items & Bid Tabulations

33 Total 0 of 33
FISHER  |  CR  |  ABILENE  |  0908-23-053  |  06/27/2023  |  $714,307.55  |  BR 2023(945)  |  BRIDGE REPL  |  96 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DELGADO'S CONTRACTORS, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
EARTH BUILDERS, L.P.
PREPARING ROW
AC 1.000 $15,000.000 $2,500.000 $40,000.000 $65,000.000
EXCAVATION (ROADWAY)
CY 1,178.000 $25.000 $40.000 $40.000 $35.000
EXCAVATION (CHANNEL)
CY 490.000 $25.000 $80.000 $40.000 $35.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 1,325.000 $25.000 $85.000 $40.000 $35.000
BLADING
HR 8.000 $200.000 $250.000 $20.000 $125.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 335.000 $1.350 $2.000 $10.000 $10.000
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 861.000 $40.000 $65.000 $50.000 $45.000
CEM STABIL BKFL
CY 46.000 $350.000 $300.000 $350.000 $450.000
DRILL SHAFT (30 IN)
LF 102.000 $300.000 $650.000 $490.000 $650.000
CL C CONC (ABUT)
CY 31.000 $1,400.000 $1,300.000 $2,500.000 $2,500.000
CL C CONC (RAIL FOUNDATION)
CY 20.000 $650.000 $1,000.000 $1,200.000 $1,500.000
REINF CONC SLAB (BOX BEAM)
SF 1,820.000 $30.000 $34.000 $50.000 $45.000
PRESTR CONC BOX BEAM (4B20)
LF 280.000 $325.000 $400.000 $425.000 $650.000
PRESTR CONC BOX BEAM (5B20)
LF 140.000 $325.000 $400.000 $425.000 $650.000
RIPRAP (CONC)(5 IN)
CY 61.000 $600.000 $700.000 $800.000 $750.000
ELASTOMERIC BEARING (LAMINATED)
EA 18.000 $1,500.000 $300.000 $800.000 $250.000
RAIL (TY SSTR)
LF 140.000 $200.000 $150.000 $180.000 $250.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 52.000 $250.000 $300.000 $250.000 $300.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $50,000.000 $40,000.000 $40,000.000 $75,000.000
MOBILIZATION
LS 1.000 $61,682.300 $75,000.000 $85,000.000 $110,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $5,000.000 $3,000.000 $3,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 680.000 $4.500 $8.000 $1.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 680.000 $1.000 $2.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 209.000 $10.000 $10.000 $10.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 209.000 $2.000 $2.000 $1.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $30.000 $50.000 $55.000 $60.000
MTL BEAM GD FEN TRANS (TL2)
EA 3.000 $1,500.000 $2,000.000 $2,000.000 $3,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $4,000.000 $5,000.000 $4,500.000
WIRE FENCE (TY C)
LF 436.000 $30.000 $25.000 $20.000 $25.000
WIRE FENCE (WATER GAP)
LF 80.000 $100.000 $150.000 $80.000 $80.000
REMOVE SM RD SN SUP&AM
EA 2.000 $120.000 $300.000 $50.000 $250.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $25.000 $60.000 $50.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $45.000 $60.000 $50.000 $75.000
Totals: $714,307.550 $917,198.000 $934,914.000 $1,121,698.000