FISHER FM 57 (0317-01-037)

Items: 163

County: FISHER
Length: N/A
Highway: FM 57
District: ABILENE
Control Number: 0317-01-037
DBE Goal: N/A
Project: STP 2019(985)
Guaranty: N/A
Time: 673 WORKING DAYS
Engineer's Estimate: $15,042,020.84
Date: 06/04/2019 (7 years ago)
Contract Number: N/A
Type: WIDEN NON-FREEWAY & REPLACE BRIDGE AND APROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$15,042,020.84
$18,577,370.54
Over/Under Est: 23.5% $3,535,349.70
$20,916,774.47
Over/Under Est: 39.06% $5,874,753.63
Amt Left: 12.59% $2,339,403.93
Over/Under Est: 41.05% $6,174,808.47
Amt Left: 14.21% $2,639,458.77
Delta: -1.43% -$300,054.84

Bid Items & Bid Tabulations

163 Total 0 of 163
FISHER  |  FM 57  |  ABILENE  |  0317-01-037  |  06/04/2019  |  $15,042,020.84  |  STP 2019(985)  |  WIDEN NON-FREEWAY & REPLACE BRIDGE A...  |  673 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNF CONSTRUCTION, INC.
A. L. HELMCAMP, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 703.000 $200.000 $300.000 $1,300.000 $630.860
REMOVING CONC (PAV)
SY 200.000 $44.000 $42.000 $19.000 $57.260
REMOVING CONC (RIPRAP)
SY 2,793.300 $22.000 $24.000 $18.000 $27.270
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 43,915.000 $6.000 $4.500 $6.000 $5.610
EXCAVATION (ROADWAY)
CY 53,803.000 $9.000 $9.500 $21.000 $16.420
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 40,658.000 $12.000 $10.000 $21.000 $13.990
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 507,104.000 $0.130 $0.100 $0.110 $0.110
DRILL SEEDING (TEMP) (WARM)
SY 250,472.000 $0.120 $0.100 $0.110 $0.100
DRILL SEEDING (TEMP) (COOL)
SY 256,632.000 $0.120 $0.100 $0.110 $0.100
VEGETATIVE WATERING
MG 4,268.000 $30.000 $37.000 $30.000 $40.830
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 86,818.000 $12.000 $9.000 $12.000 $14.680
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
SY 14,697.000 $25.000 $17.000 $22.000 $25.940
PRIME COAT (MC-30)
GAL 23,394.000 $4.500 $4.800 $7.000 $5.750
ASPH (MULTI OPTION)
GAL 129,777.000 $3.750 $3.500 $4.000 $4.560
AGGR(TY-PB GR-3 SAC-B)
CY 2,575.000 $80.000 $120.000 $152.000 $196.070
SUPERPAVE MIXTURES SP-B PG64-22
TON 3,919.000 $90.000 $121.000 $121.000 $129.680
SUPERPAVE MIXTURES SP-D SAC-B PG70-28
TON 20,087.000 $110.000 $126.000 $121.000 $119.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 500.000 $75.000 $175.000 $88.000 $151.100
PLANE ASPH CONC PAV(0" TO 2")
SY 24,486.000 $3.000 $4.400 $3.500 $4.540
CEM STABIL BKFL
CY 473.000 $250.000 $190.000 $160.000 $142.870
CUT & RESTORE ASPH PAVING
SY 43.000 $85.000 $184.000 $83.000 $249.330
TEMPORARY SPL SHORING
SF 10,043.000 $15.000 $27.000 $45.000 $60.370
DRILL SHAFT (18 IN)
LF 128.000 $68.000 $89.000 $175.000 $168.830
DRILL SHAFT (24 IN)
LF 526.000 $125.000 $150.000 $227.000 $216.660
DRILL SHAFT (36 IN)
LF 610.000 $250.000 $300.000 $260.000 $249.930
DRILL SHAFT (42 IN)
LF 894.000 $300.000 $400.000 $398.000 $287.450
CL C CONC (ABUT)(HPC)
CY 139.200 $1,400.000 $2,200.000 $1,560.000 $2,095.370
CL C CONC (ABUT)(HPC)(EXTEND)
CY 11.800 $1,400.000 $4,050.000 $4,650.000 $3,284.860
CL C CONC (BENT)(HPC)
CY 36.000 $1,400.000 $2,350.000 $1,675.000 $2,818.730
CL C CONC (CAP)(HPC)
CY 31.500 $1,350.000 $1,850.000 $1,300.000 $3,166.510
CL C CONC (CAP)(HPC)(EXTEND)
CY 8.000 $2,576.000 $4,850.000 $11,000.000 $4,690.010
CL C CONC (COLUMN)(HPC)
CY 55.200 $1,400.000 $2,050.000 $1,950.000 $2,708.440
CL C CONC (COLLAR)
EA 2.000 $915.000 $800.000 $2,200.000 $3,577.820
REINF CONC SLAB (HPC)
SF 13,434.000 $25.000 $34.000 $30.000 $29.210
APPROACH SLAB (HPC)
CY 186.000 $550.000 $900.000 $625.000 $1,187.200
CONCRETE PAN GIRDER (EXTEND)(HPC)
CY 147.600 $900.000 $3,050.000 $2,500.000 $2,179.540
PRESTR CONC GIRDER (TX28)
LF 741.000 $145.000 $250.000 $251.000 $223.310
PRESTR CONC GIRDER (TX62)
LF 1,109.280 $150.000 $252.000 $251.000 $298.580
SILICONE RESIN PAINT FINISH
SF 4,270.000 $12.500 $34.000 $10.250 $6.070
RIPRAP (CONC)(5 IN)
CY 144.000 $500.000 $600.000 $610.000 $674.290
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 405.000 $460.000 $600.000 $600.000 $644.740
RIPRAP (STONE PROTECTION)(24 IN)
CY 254.000 $140.000 $181.000 $135.000 $359.110
RIPRAP (MOW STRIP)(5 IN)
CY 741.000 $550.000 $590.000 $690.000 $629.900
RAIL (TY T223)(HPC)
LF 1,162.000 $100.000 $175.000 $146.000 $128.740
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 191.000 $84.000 $158.000 $112.000 $187.310
ARMOR JOINT (SEALED)
LF 16.000 $100.000 $370.000 $225.000 $309.630
CMP (GAL STL 18 IN)
LF 943.000 $65.000 $61.000 $61.000 $61.020
CMP (GAL STL 24 IN)
LF 325.000 $70.000 $65.000 $72.000 $84.810
CMP (GAL STL 30 IN)
LF 223.000 $100.000 $89.000 $90.000 $99.410
CMP (GAL STL 36 IN)
LF 384.000 $115.000 $90.000 $100.000 $107.060
CMP AR (GAL STL DES 4)
LF 30.000 $110.000 $212.000 $100.000 $139.120
CMP AR (GAL STL DES 5)
LF 53.000 $150.000 $253.000 $135.000 $167.510
CONC BOX CULV (5 FT X 2 FT)
LF 100.000 $280.000 $700.000 $700.000 $363.350
CONC BOX CULV (6 FT X 6 FT)
LF 28.000 $450.000 $1,600.000 $1,100.000 $950.920
CONC BOX CULV (7 FT X 3 FT)
LF 8.000 $500.000 $2,200.000 $950.000 $1,327.120
CONC BOX CULV (7 FT X 4 FT)
LF 153.000 $600.000 $900.000 $1,000.000 $673.050
CONC BOX CULV (10 FT X 10 FT)
LF 16.000 $1,800.000 $3,200.000 $1,800.000 $2,464.990
CONC BOX CULV (18 FT X 4 FT)
LF 15.000 $2,000.000 $4,500.000 $4,700.000 $3,700.870
CONC BOX CULV (18 FT X 5 FT)
LF 15.000 $2,200.000 $4,700.000 $5,000.000 $3,733.010
CONC BOX CULV (18 FT X 7 FT)
LF 11.000 $2,400.000 $5,100.000 $5,300.000 $5,175.100
CONC BOX CULV (18 FT X 8 FT)
LF 17.000 $2,600.000 $5,300.000 $6,000.000 $4,025.360
RC PIPE (CL III)(24 IN)
LF 133.000 $80.000 $207.000 $180.000 $104.230
RC PIPE (CL III)(30 IN)
LF 59.000 $110.000 $213.000 $245.000 $120.730
HEADWALL (CH - PW - 0) (DIA= 18 IN)
EA 2.000 $3,700.000 $5,900.000 $6,100.000 $8,130.810
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 3.000 $4,500.000 $7,500.000 $6,400.000 $7,780.170
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 2.000 $6,000.000 $13,500.000 $12,000.000 $9,577.070
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 8.000 $7,500.000 $14,000.000 $14,000.000 $11,494.660
HEADWALL (CH - PW - A - 0) (DES= 4)
EA 2.000 $5,000.000 $9,000.000 $8,000.000 $10,766.990
HEADWALL (CH - PW - A - S) (DES= 5)
EA 2.000 $7,000.000 $15,500.000 $15,000.000 $10,983.110
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $35,000.000 $54,500.000 $72,000.000 $38,387.840
WINGWALL (PW - 1) (HW=11 FT)
EA 3.000 $40,000.000 $69,000.000 $105,000.000 $76,815.670
WINGWALL (PW - 1) (HW=12 FT)
EA 2.000 $45,000.000 $92,000.000 $115,000.000 $82,942.310
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $10,000.000 $13,000.000 $17,000.000 $23,972.190
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $12,000.000 $17,000.000 $19,000.000 $24,135.310
WINGWALL (PW - 1) (HW=6 FT)
EA 4.000 $14,000.000 $13,000.000 $28,000.000 $26,363.200
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $18,000.000 $43,000.000 $50,000.000 $35,317.640
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $7,500.000 $11,300.000 $9,000.000 $12,411.330
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 34.000 $950.000 $1,660.000 $1,300.000 $1,240.610
SET (TY II) (24 IN) (CMP) (6: 1) (C)
EA 6.000 $1,600.000 $1,850.000 $1,500.000 $1,586.410
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 10.000 $1,500.000 $1,850.000 $1,500.000 $1,586.410
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,200.000 $1,500.000 $1,200.000 $1,167.460
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,580.000 $1,600.000 $1,200.000 $1,280.510
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $1,600.000 $1,800.000 $1,500.000 $1,579.760
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 8.000 $2,500.000 $2,500.000 $3,400.000 $2,956.310
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 2.000 $3,600.000 $2,400.000 $3,100.000 $3,671.850
SET (TY II) (36 IN) (CMP) (6: 1) (P)
EA 12.000 $3,700.000 $3,300.000 $4,500.000 $5,168.800
CLEAN EXIST CULVERTS
EA 22.000 $1,500.000 $3,700.000 $1,700.000 $1,414.340
REMOV STR (SET)
EA 8.000 $420.000 $610.000 $1,200.000 $483.720
REMOV STR (WINGWALL)
EA 62.000 $1,500.000 $820.000 $1,200.000 $2,592.570
REMOV STR (HEADWALL)
EA 31.000 $550.000 $230.000 $1,200.000 $3,097.780
REMOV STR (PIPE)
LF 157.000 $18.000 $40.000 $20.000 $27.040
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $80,000.000 $300,000.000 $100,000.000 $141,177.400
MOBILIZATION
LS 1.000 $1,400,000.000 $1,846,000.000 $2,000,000.000 $3,069,450.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 29.000 $7,000.000 $5,000.000 $16,000.000 $5,485.290
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 960.000 $25.000 $37.000 $33.000 $33.580
ROCK FILTER DAMS (REMOVE)
LF 960.000 $10.000 $14.000 $10.000 $11.580
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 888.000 $15.000 $37.000 $15.000 $22.620
CONSTRUCTION EXITS (REMOVE)
SY 888.000 $8.000 $10.000 $5.000 $34.370
TEMP SEDMT CONT FENCE (INSTALL)
LF 31,932.000 $3.500 $2.310 $2.800 $2.610
TEMP SEDMT CONT FENCE (REMOVE)
LF 31,932.000 $1.500 $0.500 $0.800 $0.590
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 4,336.000 $5.000 $4.500 $4.500 $5.470
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,336.000 $1.150 $0.500 $1.000 $1.360
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 38.000 $5,500.000 $6,630.000 $6,000.000 $5,907.370
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 5,910.000 $80.000 $120.000 $110.000 $109.620
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 14,550.000 $15.000 $10.000 $13.000 $6.810
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 5,910.000 $12.000 $12.000 $13.000 $13.660
DRIVEWAYS (SURF TREAT)
SY 3,120.000 $30.000 $57.000 $27.000 $40.210
DRIVEWAYS (ACP)(TYPE 1)
SY 335.000 $40.000 $91.000 $50.000 $87.310
RUMBLE STRIPS (SHOULDER)
LF 122,527.000 $0.150 $0.110 $0.180 $0.230
RUMBLE STRIPS (CENTERLINE)
LF 61,360.000 $0.150 $0.110 $0.200 $0.210
MTL W-BEAM GD FEN (TIM POST)
LF 5,862.500 $24.000 $23.000 $24.000 $24.440
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,000.000 $1,525.000 $1,700.000 $1,661.530
SHORT RADIUS
LF 26.000 $35.000 $31.000 $34.000 $54.290
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 15.000 $830.000 $1,200.000 $1,300.000 $1,274.220
REMOVE METAL BEAM GUARD FENCE
LF 5,366.000 $3.500 $2.100 $2.300 $2.460
REMOVE TERMINAL ANCHOR SECTION
EA 36.000 $250.000 $205.000 $230.000 $250.750
GUARDRAIL END TREATMENT (INSTALL)
EA 45.000 $2,800.000 $2,550.000 $2,800.000 $2,765.370
CRASH CUSH ATTEN (INSTL)
EA 8.000 $9,500.000 $10,000.000 $13,000.000 $2,107.300
CRASH CUSH ATTEN (MOVE & RESET)
EA 40.000 $3,000.000 $500.000 $1,000.000 $1,389.180
CRASH CUSH ATTEN (STKPL)
EA 8.000 $2,500.000 $400.000 $1,100.000 $254.590
WIRE FENCE (TY A)
LF 720.000 $25.000 $26.000 $8.000 $18.040
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 4.000 $225.000 $250.000 $250.000 $261.340
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $550.000 $510.000 $560.000 $563.840
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 134.000 $480.000 $460.000 $500.000 $508.420
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 25.000 $630.000 $510.000 $560.000 $563.840
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $680.000 $560.000 $610.000 $618.840
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 23.000 $1,000.000 $610.000 $670.000 $673.840
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 3.000 $700.000 $660.000 $720.000 $728.840
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $850.000 $720.000 $780.000 $783.840
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $2,500.000 $2,600.000 $2,800.000 $618.840
REMOVE SM RD SN SUP&AM
EA 184.000 $75.000 $66.000 $72.000 $86.540
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 22.000 $23.460 $11.000 $12.000 $29.870
INSTL OM ASSM (OM-2Y)(WC)GND
EA 62.000 $75.000 $66.000 $72.000 $84.890
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 92.000 $30.000 $11.000 $12.000 $24.540
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 14,620.000 $0.250 $0.200 $0.200 $0.740
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 110.000 $8.000 $2.600 $2.750 $4.010
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 11,520.000 $0.300 $0.200 $0.200 $0.220
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 1,248.000 $2.000 $3.600 $3.850 $3.960
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 8,800.000 $0.600 $1.100 $1.100 $1.120
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 216.000 $11.000 $10.100 $11.000 $11.640
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 34,560.000 $0.650 $1.100 $1.100 $1.120
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 63.000 $1.000 $2.400 $0.500 $2.450
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,277.000 $0.750 $1.900 $0.500 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 831.000 $0.650 $0.900 $0.950 $1.090
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 520.000 $8.500 $7.200 $8.000 $7.970
PAVEMENT SEALER 4"
LF 2,144.000 $0.480 $0.350 $0.330 $0.390
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 142,997.000 $0.250 $0.450 $0.460 $0.480
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 10,810.000 $0.250 $0.450 $0.460 $0.470
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 83,334.000 $0.250 $0.450 $0.460 $0.470
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $250.000 $510.000 $550.000 $584.590
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $250.000 $720.000 $770.000 $804.590
REFL PAV MRKR TY I-C
EA 43.000 $3.300 $4.100 $5.000 $7.620
REFL PAV MRKR TY II-A-A
EA 1,641.000 $2.650 $4.100 $4.500 $4.480
ELIM EXT PAV MRK & MRKS (4")
LF 40,478.000 $0.750 $1.100 $1.100 $1.100
ELIM EXT PAV MRK & MRKS (24")
LF 308.000 $5.000 $9.100 $6.600 $7.050
PAV SURF PREP FOR MRK (4")
LF 2,144.000 $0.150 $0.310 $0.280 $0.340
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 10.000 $5,500.000 $12,000.000 $13,000.000 $7,551.250
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 6.000 $3,000.000 $510.000 $600.000 $1,233.060
FULL - WIDTH MOWING
AC 106.000 $116.000 $250.000 $85.000 $130.840
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $15,000.000 $20,100.000 $20,000.000 $10,018.740
TMA (STATIONARY)
DAY 207.000 $250.000 $175.000 $250.000 $321.380
TMA (MOBILE OPERATION)
DAY 87.000 $250.000 $77.000 $650.000 $719.580
TEMP SPEED MONITOR SYS
EA 4.000 $8,000.000 $17,000.000 $20,000.000 $15,917.170
Totals: $15,042,020.840 $18,577,370.540 $20,916,774.470 $21,216,829.342