FAYETTE IH0010 (6394-51-001)

Items: 61

County: FAYETTE
Length: N/A
Highway: IH0010
District: YOAKUM
Control Number: 6394-51-001
DBE Goal: N/A
Project: RMC - 639451001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,234,640.00
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GF UPGRADE/CONCRETE REPAIRS
Mail/Deliver Bids To: N/A
MARK NETARDUS
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$1,234,640.00
$959,885.15
Over/Under Est: -22.25% -$274,754.85
$1,230,510.00
Over/Under Est: -0.33% -$4,130.00
Amt Left: 28.19% $270,624.85
$1,756,905.00
Over/Under Est: 42.3% $522,265.00
Amt Left: 83.03% $797,019.85
Delta: -42.78% -$526,395.00

Bid Items & Bid Tabulations

61 Total 0 of 61
FAYETTE  |  IH0010  |  YOAKUM  |  6394-51-001  |  02/04/2022  |  $1,234,640.00  |  RMC - 639451001  |  METAL BEAM GF UPGRADE/CONC REPAIRS  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JCW CONSTRUCTION, LLC
RHINO EQUITY, LLC
ISI CONTRACTING, INC.
REMOVING CONC (RIPRAP)
SY 100.000 $25.000 $1.000 $100.000 $25.000
REMOVING CONC (CURB)
LF 50.000 $10.000 $1.000 $100.000 $30.000
REMOVE CONC (WINGWALL)
CY 20.000 $200.000 $500.000 $500.000 $260.000
REMOVING CONC (MISC)
SY 200.000 $35.000 $100.000 $100.000 $27.000
REMOVE CONC (RAIL)
LF 200.000 $30.000 $200.000 $38.000 $41.000
CL B CONC (MISC)
CY 50.000 $400.000 $100.000 $750.000 $1,000.000
CL C CONC (MISC)
CY 100.000 $600.000 $1,500.000 $750.000 $1,000.000
MOBILIZATION (CALLOUT)
EA 24.000 $500.000 $1.000 $100.000 $3,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,500.000 $20.000 $0.100 $55.000 $31.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $1,600.000 $1.000 $1,500.000 $1,800.000
MTL BEAM GD FEN TRANS (T101)
EA 5.000 $600.000 $1,250.000 $800.000 $1,701.000
MTL BEAM GD FEN TRANS (T6)
EA 5.000 $300.000 $1,250.000 $800.000 $518.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 5.000 $700.000 $500.000 $1,200.000 $1,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,200.000 $1,350.000 $1,500.000 $1,500.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 5.000 $750.000 $1,000.000 $500.000 $1,300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 50.000 $3,000.000 $1.000 $3,000.000 $4,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 100.000 $10.000 $25.000 $25.000 $17.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 100.000 $12.000 $25.000 $25.000 $28.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,500.000 $20.000 $40.000 $43.000 $35.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $22.000 $100.000 $100.000 $31.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 40.000 $23.000 $100.000 $75.000 $48.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 350.000 $21.000 $40.000 $15.000 $75.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 1,000.000 $51.000 $52.000 $60.000 $45.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 150.000 $43.000 $50.000 $40.000 $70.000
REALIGN POSTS
EA 300.000 $10.000 $1.000 $5.000 $7.000
REMOVE & REPLACE BLOCKOUT
EA 600.000 $33.000 $0.010 $100.000 $19.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,200.000 $30.000 $0.010 $35.000 $34.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 200.000 $60.000 $50.000 $50.000 $80.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 100.000 $3,300.000 $3,150.000 $3,000.000 $3,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 25.000 $950.000 $1.000 $600.000 $1,307.000
REM & RESET SGT IMPACT HEAD
EA 20.000 $160.000 $300.000 $100.000 $137.000
REPLACE SGT CABLE ASSEMBLY
EA 25.000 $81.000 $1.000 $75.000 $139.000
REPLACE SGT CABLE ANCHOR
EA 20.000 $81.000 $1.000 $75.000 $104.000
REPLACE SGT STRUT
EA 25.000 $78.000 $1.000 $75.000 $88.000
REPLACE SGT OBJECT MARKER
EA 50.000 $26.000 $100.000 $20.000 $26.000
REPLACE POSTS (TL-3)
EA 500.000 $130.000 $0.010 $50.000 $195.000
REPLACE POSTS (TL-4)
EA 200.000 $145.000 $0.010 $50.000 $290.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 5.000 $180.000 $0.010 $50.000 $350.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $160.000 $0.010 $1.000 $590.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $100.000 $0.010 $1.000 $196.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $100.000 $0.010 $1.000 $275.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 5.000 $1,200.000 $0.010 $1.000 $1,336.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $1,200.000 $0.010 $1.000 $1,322.000
REPLACE CABLE (TL-3)
LF 500.000 $3.000 $0.010 $1.000 $7.000
REPLACE CABLE (TL-4)
LF 500.000 $3.000 $0.010 $1.000 $7.000
CHECK / RE-TENSION CABLE
EA 25.000 $315.000 $0.010 $1.000 $334.000
REPLACE POST HARDWARE (TL-4)
EA 500.000 $18.000 $0.010 $0.250 $41.000
REPLACE POST HARDWARE (TL-3)
EA 500.000 $20.000 $0.010 $0.250 $41.000
REPLACE CCT POST (5 FT 3 IN)
EA 5.000 $200.000 $0.010 $1.000 $246.000
REPLACE CCT POST (5 FT 11 IN)
EA 5.000 $200.000 $0.010 $1.000 $313.000
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 50.000 $300.000 $0.010 $50.000 $1,200.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 50.000 $50.000 $100.000 $25.000 $4.000
REP METAL POST W/ BASE PLATE(T101 RAIL)
EA 10.000 $215.000 $500.000 $150.000 $478.000
REPAIR (TY T101RC)
LF 300.000 $40.000 $35.000 $25.000 $27.000
REPAIR (TY T1 - 101R)
LF 300.000 $25.000 $40.000 $20.000 $29.000
REP METAL PST W/ BASE PLATE (TY T101RC)
EA 50.000 $150.000 $50.000 $200.000 $287.000
REP METAL PST W/ BASE PLATE(TY T1-101R)
EA 50.000 $150.000 $50.000 $200.000 $287.000
CONCRETE RAIL REPAIR (MISC)
LF 200.000 $400.000 $500.000 $25.000 $90.000
CONCRETE POST REPAIR
EA 10.000 $440.000 $1,100.000 $150.000 $550.000
TMA (STATIONARY)
DAY 200.000 $165.000 $1.000 $1.000 $600.000
1 LANE CLOSURE-4 LANE ROAD
EA 6.000 $1,000.000 $5,000.000 $1,000.000 $4,000.000
Totals: $1,234,640.000 $959,885.150 $1,230,510.000 $1,756,905.000