FAYETTE IH0010 (6353-58-001)

Items: 52

County: FAYETTE
Length: N/A
Highway: IH0010
District: YOAKUM
Control Number: 6353-58-001
DBE Goal: N/A
Project: RMC - 635358001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $2,586,600.00
Date: 02/07/2020 (6 years ago)
Contract Number: N/A
Type: METAL BEAM GUARDFENCE REPAIR (ON CALL)
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,586,600.00
$1,973,450.00
Over/Under Est: -23.7% -$613,150.00
Over/Under Est: -15.76% -$407,660.00
Amt Left: 10.41% $205,490.00
$2,290,190.00
Over/Under Est: -11.46% -$296,410.00
Amt Left: 16.05% $316,740.00
Delta: -5.11% -$111,250.00

Bid Items & Bid Tabulations

52 Total 0 of 52
FAYETTE  |  IH0010  |  YOAKUM  |  6353-58-001  |  02/07/2020  |  $2,586,600.00  |  RMC - 635358001  |  METAL BEAM GUARDFENCE REPAIR (ON CAL...  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELITE CASTLE RESOURCES LLC
T&L CLEANING SERVICES LLC
SHORT-LINE CORPORATION
MOBILIZATION (CALLOUT)
EA 24.000 $1,500.000 $100.000 $300.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $15.000 $25.000 $24.000 $5.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 30.000 $750.000 $100.000 $1,500.000 $100.000
MTL BEAM GD FEN TRANS (T101)
EA 5.000 $500.000 $800.000 $1,000.000 $1,000.000
MTL BEAM GD FEN TRANS (T6)
EA 5.000 $500.000 $500.000 $1,000.000 $100.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 5.000 $850.000 $800.000 $1,000.000 $500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,200.000 $1,500.000 $1,200.000 $1,500.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 5.000 $300.000 $500.000 $100.000 $100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,000.000 $3,000.000 $3,300.000 $500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 100.000 $25.000 $25.000 $60.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 100.000 $30.000 $25.000 $60.000 $100.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 10,000.000 $25.000 $25.000 $24.000 $35.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $50.000 $50.000 $30.000 $100.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 40.000 $50.000 $75.000 $30.000 $100.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 750.000 $25.000 $15.000 $30.000 $25.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 1,500.000 $40.000 $60.000 $30.000 $100.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 150.000 $50.000 $60.000 $50.000 $100.000
REALIGN POSTS
EA 300.000 $20.000 $5.000 $10.000 $100.000
REMOVE & REPLACE BLOCKOUT
EA 600.000 $10.000 $125.000 $10.000 $200.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,200.000 $25.000 $25.000 $30.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 200.000 $50.000 $50.000 $60.000 $50.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 100.000 $2,100.000 $3,000.000 $3,300.000 $2,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $900.000 $600.000 $700.000 $500.000
REM & RESET SGT IMPACT HEAD
EA 40.000 $100.000 $100.000 $50.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 50.000 $20.000 $50.000 $1.000 $20.000
REPLACE SGT CABLE ANCHOR
EA 40.000 $20.000 $50.000 $1.000 $20.000
REPLACE SGT STRUT
EA 50.000 $28.000 $1.000 $1.000 $10.000
REPLACE SGT OBJECT MARKER
EA 100.000 $20.000 $1.000 $30.000 $10.000
REPLACE POSTS (TL-3)
EA 7,500.000 $135.000 $90.000 $120.000 $100.000
REPLACE POSTS (TL-4)
EA 600.000 $140.000 $85.000 $140.000 $25.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $100.000 $150.000 $100.000 $150.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $100.000 $150.000 $100.000 $5.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 10.000 $100.000 $25.000 $50.000 $5.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $100.000 $25.000 $50.000 $5.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 30.000 $500.000 $500.000 $1,000.000 $2,500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 30.000 $500.000 $100.000 $1,500.000 $100.000
REPLACE CABLE (TL-3)
LF 1,000.000 $5.000 $1.000 $0.500 $0.500
REPLACE CABLE (TL-4)
LF 1,000.000 $5.000 $1.000 $0.500 $0.500
CHECK / RE-TENSION CABLE
EA 72.000 $200.000 $50.000 $200.000 $1.000
REPLACE POST HARDWARE (TL-4)
EA 1,800.000 $25.000 $0.250 $15.000 $0.010
REPLACE POST HARDWARE (TL-3)
EA 20,000.000 $25.000 $0.250 $3.000 $0.010
REPLACE CCT POST (5 FT 3 IN)
EA 10.000 $200.000 $80.000 $100.000 $300.000
REPLACE CCT POST (5 FT 11 IN)
EA 10.000 $200.000 $80.000 $100.000 $300.000
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 200.000 $300.000 $480.000 $400.000 $1,000.000
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
LF 100.000 $75.000 $25.000 $100.000 $50.000
REP METAL POST W/ BASE PLATE(T101 RAIL)
EA 10.000 $100.000 $150.000 $100.000 $10.000
REPAIR (TY T101RC)
LF 100.000 $20.000 $25.000 $30.000 $1.000
REPAIR (TY T1 - 101R)
LF 100.000 $20.000 $20.000 $30.000 $1.000
REP METAL PST W/ BASE PLATE (TY T101RC)
EA 20.000 $150.000 $180.000 $100.000 $150.000
REP METAL PST W/ BASE PLATE(TY T1-101R)
EA 10.000 $150.000 $180.000 $100.000 $150.000
TMA (STATIONARY)
DAY 200.000 $150.000 $1,000.000 $200.000 $750.000
1 LANE CLOSURE-4 LANE ROAD
EA 12.000 $1,500.000 $1,800.000 $1,000.000 $1,500.000
Totals: $2,586,600.000 $1,973,450.000 $2,178,940.000 $2,290,190.000