Show Job Controls
Bid Cobra

FAYETTE FM 957 (1440-01-020)

Items: 54

County: FAYETTE
Length: N/A
Highway: FM 957
District: YOAKUM
Control Number: 1440-01-020
DBE Goal: N/A
Project: BR 1902(289)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $2,333,125.30
Date: 08/07/2019 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,333,125.30
$2,138,475.90
Over/Under Est: -8.34% -$194,649.40
Over/Under Est: -5.59% -$130,449.47
Amt Left: 3% $64,199.93
Over/Under Est: 16.55% $386,044.30
Amt Left: 27.15% $580,693.70
Delta: -23.45% -$516,493.77

Bid Items & Bid Tabulations

54 Total 0 of 54
FAYETTE  |  FM 957  |  YOAKUM  |  1440-01-020  |  08/07/2019  |  $2,333,125.30  |  BR 1902(289)  |  BRIDGE REPL  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
SB CONTRACTORS LLC
ANGEL BROTHERS HOLDINGS CORP.
FUQUA CONSTRUCTION CO., INC.
PREPARING ROW
STA 11.000 $1,000.000 $3,500.000 $12,000.000 $4,504.446
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 14.000 $300.000 $2,800.000 $2,000.000 $1,774.518
PREPARING ROW(TREE)(24" TO 36" DIA.)
EA 2.000 $1,500.000 $4,000.000 $3,000.000 $2,250.000
EXCAVATION (ROADWAY)
CY 1,646.000 $10.000 $12.000 $14.000 $11.856
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 3,531.000 $10.000 $18.000 $25.000 $22.667
BLADING
HR 20.000 $100.000 $55.000 $110.000 $245.748
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 9,088.000 $2.000 $0.500 $0.280 $0.750
BROADCAST SEED (TEMP) (WARM)
SY 2,272.000 $2.000 $0.800 $0.420 $0.750
BROADCAST SEED (TEMP) (COOL)
SY 2,272.000 $2.000 $0.800 $0.420 $0.750
VEGETATIVE WATERING
MG 142.000 $90.000 $45.000 $20.000 $18.833
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
CY 1,065.000 $75.000 $78.000 $70.000 $93.946
CEMENT
TON 41.000 $160.000 $140.000 $158.000 $223.957
CEMENT TREAT(EXIST MATL)(8")
SY 4,104.000 $3.000 $6.000 $2.000 $4.500
ASPH (RC-250)
GAL 713.000 $4.500 $7.000 $8.000 $6.060
AGGR(TY-E GR-5 SAC-B)
CY 26.000 $125.000 $310.000 $338.000 $195.000
AGGR(TY-PE GR-3 SAC-B)
CY 42.000 $100.000 $310.000 $300.000 $234.000
AGGR(TY-PE GR-4 SAC-B)
CY 28.000 $100.000 $330.000 $365.000 $234.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 2,638.000 $3.500 $7.000 $5.000 $5.064
CEM STABIL BKFL
CY 72.200 $150.000 $155.000 $220.000 $256.281
PRESTR CONC PIL (24 IN SQ)
LF 1,308.000 $150.000 $168.000 $130.000 $150.110
CL C CONC (ABUT)
CY 44.800 $1,200.000 $850.000 $1,200.000 $1,321.118
CL C CONC (BENT)
CY 36.400 $1,200.000 $1,000.000 $985.000 $1,800.000
REINF CONC SLAB
SF 7,140.000 $25.000 $16.000 $31.000 $25.167
PRESTR CONC GIRDER (TX28)
LF 1,042.100 $170.000 $150.000 $150.000 $210.863
RIPRAP (STONE PROTECTION)(18 IN)
CY 422.000 $170.000 $145.000 $200.000 $180.198
RAIL (TY T552)
LF 460.000 $120.000 $130.000 $105.000 $104.939
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 75.620 $90.000 $85.000 $100.000 $133.907
CMP AR (GAL STL DES 3)
LF 126.000 $70.000 $65.000 $80.000 $99.491
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 6.000 $1,300.000 $1,500.000 $1,700.000 $2,116.392
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $75,000.000 $24,000.000 $24,000.000 $183,800.663
MOBILIZATION
LS 1.000 $125,000.000 $135,000.000 $150,000.000 $323,700.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $3,000.000 $3,000.000 $1,300.000 $11,030.185
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 159.000 $30.000 $55.000 $40.330 $52.500
ROCK FILTER DAMS (REMOVE)
LF 159.000 $10.000 $35.000 $10.220 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,520.000 $4.000 $6.000 $2.780 $5.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,520.000 $1.000 $2.000 $0.560 $1.500
DRIVEWAYS (SURF TREAT)
SY 323.000 $25.000 $32.000 $70.000 $24.227
MTL W-BEAM GD FEN (TIM POST)
LF 225.000 $25.000 $20.000 $21.700 $34.341
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,900.000 $1,700.000 $2,217.760 $3,080.571
REMOVE METAL BEAM GUARD FENCE
LF 490.000 $2.500 $3.000 $2.970 $3.859
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,800.000 $2,700.000 $2,988.860 $4,249.404
WIRE FENCE (TY A)
LF 1,257.000 $10.000 $12.000 $10.960 $28.512
GATE (TY 1)
EA 1.000 $1,200.000 $3,000.000 $204.440 $2,235.577
GATE (TY 3)
EA 1.000 $1,200.000 $3,000.000 $871.100 $2,119.680
WIRE FENCE (WATER GAP)
LF 200.000 $35.000 $45.000 $54.440 $48.419
REMOVE SM RD SN SUP&AM
EA 1.000 $100.000 $75.000 $80.000 $116.511
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $25.000 $15.000 $16.670 $37.191
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $10.000 $10.000 $11.110 $45.534
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 9.000 $25.000 $25.000 $27.780 $41.434
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,330.000 $1.000 $0.800 $0.870 $0.433
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 2,330.000 $1.000 $0.800 $0.870 $0.431
REFL PAV MRKR TY II-A-A
EA 30.000 $10.000 $12.000 $13.330 $4.428
NO. OF WORKING DAYS
$/D 7,000.000 $140.000 $110.000 $95.000 $105.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $12,000.000 $11,000.000 $13,993.547
Totals: $2,333,125.300 $2,138,475.900 $2,202,675.830 $2,719,169.729