FAYETTE CR (0913-28-073)

Items: 44

County: FAYETTE
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-28-073
DBE Goal: N/A
Project: BR 2B20(275)
Guaranty: N/A
Time: 251 WORKING DAYS
Engineer's Estimate: $1,425,163.50
Date: 01/07/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$1,425,163.50
$1,498,742.87
Over/Under Est: 5.16% $73,579.37
Over/Under Est: 18.28% $260,555.10
Amt Left: 12.48% $186,975.73
Over/Under Est: 20.48% $291,826.29
Amt Left: 14.56% $218,246.92
Delta: -1.86% -$31,271.19
Subcontractor Percentage Amount
GREGORY PILE DRIVING, INC. 10.62% $159,519.30
ROADWAY SPECIALTIES, INC. 4.76% $71,498.29
D. I. J. CONSTRUCTION, INC. 4.56% $68,494.16
BATTEN DRILLING, INC. 4.04% $60,683.43
HEMPHILL WBE PILE DRIVING CO. 3.21% $48,216.29
CEN TEX HYDROSEED, INC. 1.36% $20,428.08
SOUTH TEXAS TRAFFIC ALLIANCE INC. 0.73% $10,965.07
GK CONSTRUCTION, LLC 0.62% $9,312.80
RAY'S CRANE SERVICE 0.56% $8,411.56
Total: 30.46% $457,528.98

Bid Items & Bid Tabulations

44 Total 0 of 44
FAYETTE  |  CR  |  YOAKUM  |  0913-28-073  |  01/07/2022  |  $1,425,163.50  |  BR 2B20(275)  |  BRIDGE REPL  |  251 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FUQUA CONSTRUCTION CO., INC.
HILL COUNTRY BRIDGE, INC.
ACME BRIDGE COMPANY, INC.
PREPARING ROW
STA 11.500 $3,000.000 $2,000.000 $4,800.000 $5,000.000
EXCAVATION (ROADWAY)
CY 525.000 $20.000 $15.000 $21.300 $41.800
EXCAVATION (CHANNEL)
CY 877.000 $20.000 $15.000 $16.000 $26.600
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 188.000 $25.000 $15.000 $26.650 $26.800
BLADING
HR 56.000 $150.000 $75.000 $47.950 $85.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 1,295.000 $2.000 $1.000 $2.150 $1.050
BROADCAST SEED (TEMP) (WARM)
SY 324.000 $2.000 $4.000 $8.250 $4.250
BROADCAST SEED (TEMP) (COOL)
SY 324.000 $2.000 $4.000 $8.250 $4.250
VEGETATIVE WATERING
MG 10.900 $25.000 $20.000 $300.000 $64.800
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 572.000 $100.000 $80.000 $138.500 $129.000
ASPH (RC-250)
GAL 363.000 $25.000 $6.000 $19.400 $45.000
AGGR(TY-E GR-5 SAC-B)
CY 12.000 $500.000 $100.000 $1,400.000 $1,700.000
AGGR(TY-PE GR-4 SAC-B)
CY 14.000 $500.000 $100.000 $1,215.000 $1,700.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 618.000 $20.000 $6.000 $13.800 $45.000
CEM STABIL BKFL
CY 125.000 $125.000 $142.000 $221.000 $200.000
PRESTR CONC PIL (18 IN SQ)
LF 514.000 $150.000 $158.224 $115.400 $188.000
DRILL SHAFT (24 IN)
LF 312.000 $275.000 $330.000 $180.000 $150.000
DRILL SHAFT (36 IN)
LF 174.000 $280.000 $341.000 $278.000 $246.000
CL C CONC (ABUT)
CY 79.100 $1,200.000 $1,200.000 $1,155.000 $1,180.000
CL C CONC (CAP)
CY 27.000 $1,200.000 $1,500.000 $1,510.000 $1,840.000
CL C CONC (COLUMN)
CY 8.400 $1,900.000 $1,500.000 $1,760.000 $1,530.000
REINF CONC SLAB
SF 4,420.000 $20.000 $30.000 $27.700 $25.700
REINF CONC SLAB (SLAB BEAM)
SF 2,600.000 $20.000 $30.000 $27.700 $19.400
PRESTR CONC SLAB BEAM (5SB12)
LF 492.500 $195.000 $167.000 $213.000 $247.000
PRESTR CONC SLAB BEAM (5SB15)
LF 517.420 $200.000 $167.000 $215.000 $257.000
PRESTR CONC GIRDER (TX28)
LF 257.690 $150.000 $190.000 $275.000 $302.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 442.000 $160.000 $160.000 $190.000 $225.000
RAIL (TY T223)
LF 458.000 $100.000 $120.000 $144.000 $98.100
RAIL (TY T631)
LF 170.000 $100.000 $88.000 $123.000 $92.800
ARMOR JOINT (SEALED)
LF 142.000 $80.000 $80.000 $93.000 $109.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $25,000.000 $15,000.000 $33,000.000 $20,000.000
MOBILIZATION
LS 1.000 $123,500.000 $207,972.000 $168,500.000 $171,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $4,000.000 $2,200.000 $3,000.000 $3,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,087.000 $3.000 $5.000 $3.200 $3.450
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,087.000 $1.000 $2.000 $1.600 $1.050
MTL W-BEAM GD FEN (TIM POST)
LF 175.000 $25.000 $25.000 $37.300 $40.800
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,950.000 $2,000.000 $2,855.000 $2,920.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,500.000 $1,355.000 $1,370.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,800.000 $3,000.000 $3,200.000 $3,660.000
WIRE FENCE (TY A)
LF 1,190.000 $15.000 $15.000 $13.850 $10.000
WIRE FENCE (TY C)
LF 1,358.000 $9.000 $15.000 $27.700 $15.000
WIRE FENCE (WATER GAP)
LF 48.000 $60.000 $44.000 $117.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 25.000 $25.000 $29.000 $43.000 $37.200
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 10.000 $35.000 $32.000 $32.000 $21.300
Totals: $1,425,163.500 $1,498,742.876 $1,685,718.600 $1,716,989.790