FAYETTE IH 10 (0535-06-046)

Items: 47

County: FAYETTE
Length: N/A
Highway: IH 10
District: YOAKUM
Control Number: 0535-06-046
DBE Goal: N/A
Project: BR 2022(011)
Guaranty: N/A
Time: 158 WORKING DAYS
Engineer's Estimate: $1,391,919.64
Date: 09/01/2021 (4 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$1,391,919.64
$1,588,806.60
Over/Under Est: 14.14% $196,886.96
Over/Under Est: 37.74% $525,346.46
Amt Left: 20.67% $328,459.50
$2,220,586.50
Over/Under Est: 59.53% $828,666.86
Amt Left: 39.76% $631,779.90
Delta: -15.82% -$303,320.40
Over/Under Est: 145.64% $2,027,134.36
Amt Left: 115.2% $1,830,247.40
Delta: -53.97% -$1,198,467.50
Subcontractor Percentage Amount
CK NEWBERRY, LLC 17.59% $279,471.08
TEXAS MATERIALS GROUP, INC. 11.22% $178,264.10
DIIBS SPECIALISTS, LLC 4.29% $68,159.80
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 3.00% $47,664.20
HIGHWAY 1 LLC 2.89% $45,916.51
STRAIGHT LINE SAWING & SEALING, INC. 2.73% $43,374.42
SOUTH TEXAS TRAFFIC ALLIANCE INC. 2.12% $33,682.70
A BROTHERS MILLING, LLC 0.78% $12,392.69
FLASHER EQUIPMENT COMPANY 0.44% $6,990.75
PINNACLE GRINDING AND GROOVING LLC 0.36% $5,719.70
KAY SAVAGE TRUCKING, INC. 0.04% $635.52
Total: 45.46% $722,271.47

Bid Items & Bid Tabulations

47 Total 0 of 47
FAYETTE  |  IH 10  |  YOAKUM  |  0535-06-046  |  09/01/2021  |  $1,391,919.64  |  BR 2022(011)  |  BRIDGE MAINT  |  158 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
SCR CIVIL CONSTRUCTION, LLC
FNH CONSTRUCTION, LLC
SOUTHERN ROAD & BRIDGE, LLC
AGGR(TY-PB GR-4 SAC-B)
CY 104.000 $85.000 $150.000 $180.000 $350.000 $120.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 4,595.000 $3.500 $4.000 $9.000 $6.000 $6.000
D-GR HMA(SQ) TY-D SAC-B PG76-22
TON 1,486.000 $110.000 $120.000 $134.000 $140.000 $200.000
PLANE ASPH CONC PAV(0" TO 2")
SY 13,515.000 $1.550 $1.500 $5.300 $10.000 $3.000
FLOWABLE BACKFILL
CY 18.000 $255.000 $400.000 $1,600.000 $350.000 $7,500.000
CL C CONC (PILE ENCASEMENT)
CY 86.000 $1,500.000 $1,500.000 $1,970.000 $2,000.000 $7,500.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 40.000 $200.000 $275.000 $350.000 $500.000 $500.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 45.000 $175.000 $125.000 $308.000 $500.000 $330.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 30.000 $250.000 $285.000 $285.000 $185.000 $80.000
RIPRAP (MOW STRIP)(4 IN)
CY 94.000 $400.000 $475.000 $553.000 $550.000 $300.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 1,012.000 $22.000 $16.000 $40.000 $50.000 $50.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 168.000 $25.000 $32.000 $60.000 $100.000 $50.000
CLEAN & PAINT EXIST PILING (SYSTEM I-A)
LS 4.000 $49,200.000 $11,928.000 $13,900.000 $20,000.000 $168,500.000
RETROFIT RAIL (TY SSTR)
LF 1,704.000 $140.000 $105.000 $292.000 $110.000 $150.000
MOBILIZATION
LS 1.000 $120,000.000 $157,000.000 $134,000.000 $200,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $3,500.000 $11,500.000 $7,250.000 $8,500.000 $15,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 400.000 $3.000 $2.500 $4.500 $4.000 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 400.000 $1.000 $0.500 $2.250 $2.000 $1.000
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 4,320.000 $40.000 $76.700 $26.000 $85.000 $75.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 4,200.000 $5.000 $6.500 $13.000 $20.000 $12.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 4,320.000 $8.000 $8.000 $18.000 $20.000 $4.000
RUMBLE STRIPS (SHOULDER)
LF 15,204.000 $0.200 $0.200 $0.800 $0.500 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,150.000 $21.000 $23.500 $24.600 $25.000 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,700.000 $1,950.000 $2,560.000 $1,850.000 $2,500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,162.500 $2.250 $2.000 $2.500 $3.000 $1.200
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,600.000 $2,700.000 $3,565.000 $2,850.000 $4,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,200.000 $1,500.000 $1,010.000 $5,000.000 $850.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $750.000 $750.000 $400.000 $2,500.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $1,000.000 $7,800.000 $9,175.000 $12,500.000 $12,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 18.000 $30.000 $18.000 $25.000 $100.000 $24.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 18.000 $30.000 $18.000 $25.000 $100.000 $24.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 24.000 $30.000 $22.000 $25.000 $100.000 $28.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 24.000 $30.000 $22.000 $25.000 $100.000 $28.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 2,787.000 $3.500 $4.000 $3.650 $5.000 $6.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 11,149.000 $0.400 $0.750 $0.650 $1.000 $2.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 11,149.000 $0.400 $0.750 $0.650 $1.000 $2.000
REFL PAV MRKR TY II-C-R
EA 95.000 $3.100 $4.250 $5.600 $5.000 $7.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,787.000 $0.310 $0.400 $1.150 $1.000 $1.000
TREE AND BRUSH REMOVAL
AC 2.000 $4,000.000 $10,000.000 $12,600.000 $5,000.000 $25,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $10,000.000 $10,000.000 $12,500.000 $25,000.000
HPPM W/RET REQ TY I(W)4"(SLD)(100MIL)
LF 4,322.000 $0.400 $0.750 $0.550 $1.000 $1.000
HPPM W/RET REQ TY I(W)6"(BRK)(100MIL)
LF 1,901.000 $0.500 $0.750 $0.550 $6.000 $1.000
HPPM W/RET REQ TY I(W)6"(SLD)(100MIL)
LF 7,602.000 $0.500 $0.750 $0.550 $6.000 $1.000
HPPM W/RET REQ TY I(Y)6"(SLD)(100MIL)
LF 7,602.000 $0.500 $0.750 $0.550 $6.000 $1.000
TMA (STATIONARY)
DAY 20.000 $200.000 $250.000 $370.000 $350.000 $75.000
TMA (MOBILE OPERATION)
DAY 15.000 $200.000 $150.000 $970.000 $850.000 $135.000
REML & DISPL DRIFTWOOD & DEBRIS
LS 2.000 $1,000.000 $20,000.000 $6,000.000 $20,000.000 $25,000.000
Totals: $1,391,919.645 $1,588,806.600 $1,917,266.100 $2,220,586.500 $3,419,054.000