Bid Cobra

FAYETTE FM 154 (0334-08-037)

Items: 48

County: FAYETTE
Length: N/A
Highway: FM 154
District: YOAKUM
Control Number: 0334-08-037
DBE Goal: N/A
Project: BR 2023(900)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $2,167,130.80
Date: 06/02/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
COVEY MORROW
CHASE HERMES
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$2,167,130.80
1
$1,628,762.24
Over/Under Est: -24.84% -$538,368.56
Over/Under Est: -15.17% -$328,750.15
Amt Left: 12.87% $209,618.41
Over/Under Est: -6% -$130,026.17
Amt Left: 25.07% $408,342.39
Delta: -10.81% -$198,723.98
Over/Under Est: -3.55% -$76,874.90
Amt Left: 28.33% $461,493.66
Delta: -2.61% -$53,151.27
$2,205,808.00
Over/Under Est: 1.78% $38,677.20
Amt Left: 35.43% $577,045.76
Delta: -5.53% -$115,552.10
Over/Under Est: 5.91% $128,013.75
Amt Left: 40.91% $666,382.31
Delta: -4.05% -$89,336.55
Over/Under Est: 10.5% $227,484.20
Amt Left: 47.02% $765,852.76
Delta: -4.33% -$99,470.45
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 18.47% $253,476.46
JH CONTRACT FIELD SERVICES, LLC 3.19% $43,778.55
DUSTROL, INC. 1.64% $22,506.84
DIIBS SPECIALISTS, LLC 1.15% $15,782.24
A K FUQUAY CONSTRUCTION 0.50% $6,861.84
SUPERIOR TRAFFIC CONTROL, LLC 0.44% $6,038.42
HOUSTON SAWING & DRILLING 0.38% $5,215.00
Total: 25.77% $353,659.35

Bid Items & Bid Tabulations

48 Total 0 of 48
FAYETTE  |  FM 154  |  YOAKUM  |  0334-08-037  |  06/02/2023  |  $2,167,130.80  |  BR 2023(900)  |  BRIDGE REPL  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
TREVWAY, INC.
JOHN REED AND COMPANY, LLC
ACME BRIDGE COMPANY, INC.
E-Z BEL CONSTRUCTION, LLC
CONSTAR CONSTRUCTION
TEXAS MATERIALS GROUP, INC.
CROSS PLUS CONSTRUCTION, LLC
PREPARING ROW
STA 10.000 $5,000.000 $5,500.000 $15,000.000 $5,377.870 $2,130.000 $5,000.000 $18,000.000 $3,300.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 2,277.000 $20.000 $21.520 $20.000 $6.530 $6.000 $20.000 $11.000 $17.000
EXCAVATION (ROADWAY)
CY 813.000 $35.000 $15.000 $20.000 $30.320 $19.000 $25.000 $50.000 $44.000
EXCAVATION (CHANNEL)
CY 411.000 $35.000 $7.000 $20.000 $28.300 $19.000 $26.000 $50.000 $55.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 361.000 $35.000 $9.000 $25.000 $26.420 $17.000 $30.000 $50.000 $55.000
BLADING
HR 10.000 $150.000 $100.000 $40.000 $147.920 $80.000 $130.000 $100.000 $110.000
FURNISHING AND PLACING TOPSOIL (4")
SY 203.000 $3.000 $10.000 $4.000 $13.680 $10.000 $16.000 $5.000 $11.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 4,347.000 $1.000 $1.500 $0.750 $2.010 $0.600 $1.000 $0.750 $6.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 1,088.000 $1.000 $0.500 $0.650 $2.010 $1.000 $1.000 $0.650 $6.000
CELL FBR MLCH SEED(TEMP)(COOL)
SY 1,088.000 $1.000 $0.500 $0.650 $2.010 $1.000 $1.000 $0.650 $6.000
VEGETATIVE WATERING
MG 36.600 $75.000 $10.000 $20.000 $82.060 $150.000 $140.000 $40.000 $110.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 174.000 $3.000 $3.000 $1.750 $4.020 $3.000 $2.000 $1.750 $11.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 116.000 $3.000 $3.000 $1.750 $6.710 $3.000 $2.000 $1.750 $17.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 333.000 $3.000 $3.000 $2.500 $4.020 $3.000 $3.000 $2.500 $17.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 29.000 $295.000 $175.000 $300.000 $431.540 $328.000 $400.000 $380.000 $440.000
LIME TRT (EXST MATL)(8")
SY 1,182.000 $12.000 $13.000 $3.000 $10.330 $7.000 $20.000 $17.000 $17.000
CEM STABIL BKFL
CY 42.000 $200.000 $150.000 $100.000 $244.700 $350.000 $130.000 $300.000 $275.000
DRILL SHAFT (24 IN)
LF 296.000 $275.000 $262.000 $300.000 $233.980 $315.000 $350.000 $500.000 $248.000
CL C CONC (ABUT)
CY 24.400 $1,600.000 $1,136.000 $1,800.000 $1,387.570 $1,350.000 $1,150.000 $2,100.000 $1,980.000
CL C CONC (CAP)
CY 11.300 $1,750.000 $1,397.000 $1,800.000 $1,695.830 $1,800.000 $1,500.000 $2,900.000 $4,400.000
CL C CONC (COLUMN)
CY 3.800 $1,750.000 $2,200.000 $1,800.000 $2,839.920 $5,000.000 $950.000 $3,900.000 $2,750.000
REINF CONC SLAB
SF 3,071.000 $28.000 $55.000 $20.000 $23.930 $36.000 $28.000 $31.000 $28.000
PRESTR CONC SLAB BEAM (4SB15)
LF 534.000 $265.000 $223.000 $240.000 $265.830 $305.000 $280.000 $240.000 $220.000
PRESTR CONC SLAB BEAM (5SB15)
LF 178.000 $280.000 $221.000 $240.000 $270.000 $298.000 $280.000 $240.000 $220.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 996.000 $200.000 $35.000 $120.000 $163.460 $170.000 $220.000 $200.000 $248.000
RAIL (TY T223)
LF 204.000 $200.000 $150.000 $120.000 $139.750 $280.000 $160.000 $190.000 $275.000
ARMOR JOINT (SEALED)
LF 67.000 $180.000 $90.000 $80.000 $180.580 $150.000 $90.000 $125.000 $165.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $40,000.000 $100,000.000 $120,000.000 $37,140.530 $50,000.000 $37,000.000 $100,000.000 $44,000.000
MOBILIZATION
LS 1.000 $129,262.800 $160,000.000 $130,000.000 $102,260.810 $125,000.000 $130,000.000 $180,000.000 $165,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $3,800.000 $1,100.000 $2,000.000 $4,321.100 $5,000.000 $1,400.000 $10,000.000 $5,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 50.000 $50.000 $15.000 $40.000 $67.070 $43.000 $50.000 $38.000 $110.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $15.000 $10.000 $15.000 $13.410 $20.000 $20.000 $15.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,123.000 $4.000 $3.000 $4.000 $4.020 $3.950 $6.000 $4.800 $17.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,123.000 $1.000 $1.000 $1.000 $0.670 $0.950 $2.000 $1.500 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 550.000 $25.000 $24.190 $24.000 $30.510 $25.000 $30.000 $24.000 $44.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,300.000 $2,598.350 $1,900.000 $2,900.510 $2,000.000 $3,600.000 $2,300.000 $4,235.000
REMOVE METAL BEAM GUARD FENCE
LF 557.000 $4.000 $5.000 $4.000 $5.370 $2.500 $3.000 $3.000 $6.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,300.000 $3,000.000 $3,400.000 $4,504.780 $2,950.000 $4,400.000 $3,100.000 $4,235.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $200.000 $400.000 $536.600 $250.000 $460.000 $200.000 $275.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 12.000 $50.000 $33.000 $66.000 $88.470 $66.000 $150.000 $65.000 $55.000
REFL PAV MRKR TY II-A-A
EA 12.000 $6.000 $31.580 $20.000 $13.420 $10.000 $150.000 $10.000 $28.000
NO. OF WORKING DAYS
$/D 4,808.000 $155.000 $60.000 $96.000 $150.000 $150.000 $145.000 $100.000 $145.000
D-GR HMA TY-B PG64-22
TON 1,479.000 $150.000 $161.680 $124.000 $134.150 $121.000 $170.000 $150.000 $165.000
D-GR HMA TY-D SAC-B PG70-22
TON 351.000 $170.000 $194.000 $160.000 $167.690 $158.000 $200.000 $165.000 $165.000
TACK COAT
GAL 673.000 $5.000 $5.000 $4.000 $5.370 $3.500 $5.000 $6.000 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,200.000 $3,500.000 $12,000.000 $15,456.130 $13,000.000 $11,000.000 $15,000.000 $22,000.000
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL
LF 1,746.000 $1.000 $8.840 $2.000 $10.060 $5.000 $13.000 $3.000 $11.000
HPPM-RIB W/RET REQ TYI(Y)6"(BRK)100MIL
LF 219.000 $1.000 $16.420 $2.000 $10.060 $8.000 $13.000 $3.000 $11.000
Totals: $2,167,130.800 $1,628,762.240 $1,838,380.650 $2,037,104.659 $2,090,255.900 $2,205,808.000 $2,295,144.550 $2,394,615.000