PREPARING ROW
|
STA
|
390.390
|
$600.000
|
$492.000
|
$492.000
|
$492.000
|
$270.000
|
$1,250.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
75.000
|
$25.000
|
$10.000
|
$12.000
|
$12.000
|
$40.000
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
154.000
|
$20.000
|
$25.000
|
$12.000
|
$12.000
|
$60.000
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
390.260
|
$200.000
|
$160.000
|
$121.000
|
$258.080
|
$300.000
|
$250.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
288.000
|
$25.000
|
$30.000
|
$15.000
|
$13.200
|
$55.000
|
$30.000
|
|
|
BACKFILL (TY A)
|
STA
|
390.260
|
$200.000
|
$250.000
|
$549.000
|
$527.400
|
$188.000
|
$250.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
390.260
|
$250.000
|
$130.000
|
$125.000
|
$228.610
|
$160.000
|
$250.000
|
|
|
BULLDOZER WORK
|
HR
|
53.000
|
$80.000
|
$50.000
|
$50.000
|
$125.940
|
$155.000
|
$150.000
|
|
|
SPEC EXCAV WORK (BACKHOE)
|
HR
|
53.000
|
$50.000
|
$50.000
|
$50.000
|
$111.740
|
$165.000
|
$150.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
124,762.000
|
$0.110
|
$0.040
|
$0.040
|
$0.020
|
$0.080
|
$0.500
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
124,762.000
|
$0.120
|
$0.040
|
$0.040
|
$0.040
|
$0.080
|
$0.500
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
249,523.000
|
$0.250
|
$0.190
|
$0.180
|
$0.187
|
$0.230
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
1,495.000
|
$12.000
|
$10.000
|
$0.010
|
$5.610
|
$30.000
|
$50.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
750.000
|
$3.000
|
$1.500
|
$1.400
|
$1.500
|
$1.500
|
$6.500
|
|
|
PROOF ROLLING
|
HR
|
10.000
|
$100.000
|
$50.000
|
$50.000
|
$111.740
|
$100.000
|
$150.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (8")
|
SY
|
104,919.000
|
$11.000
|
$11.000
|
$15.220
|
$12.000
|
$14.000
|
$11.000
|
|
|
REWRKING BS MATL (TY C)(10")(ORD COMP)
|
SY
|
80,757.000
|
$2.000
|
$1.800
|
$2.700
|
$2.090
|
$2.000
|
$3.000
|
|
|
CEMENT
|
TON
|
956.000
|
$135.000
|
$127.000
|
$128.000
|
$131.000
|
$160.000
|
$171.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
104,919.000
|
$2.750
|
$1.920
|
$2.420
|
$1.730
|
$2.150
|
$4.250
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
88,664.000
|
$4.130
|
$3.060
|
$2.560
|
$3.220
|
$3.000
|
$5.000
|
|
|
ASPH (RC-250)
|
GAL
|
29,378.000
|
$4.500
|
$4.000
|
$3.930
|
$4.240
|
$4.000
|
$5.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
750.000
|
$105.000
|
$95.000
|
$84.000
|
$105.820
|
$110.000
|
$200.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
935.000
|
$110.000
|
$92.000
|
$139.000
|
$156.220
|
$140.000
|
$200.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
999.000
|
$90.000
|
$167.000
|
$97.000
|
$118.770
|
$130.000
|
$200.000
|
|
|
D-GR HMA(SQ) TY-C SAC-B PG64-22
|
TON
|
937.000
|
$129.000
|
$136.500
|
$98.780
|
$136.500
|
$135.000
|
$95.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,696.000
|
$30.000
|
$35.000
|
$52.120
|
$55.000
|
$38.000
|
$45.000
|
|
|
CL C CONC (WINGWALLS)
|
CY
|
17.000
|
$1,150.000
|
$1,000.000
|
$800.000
|
$800.000
|
$960.000
|
$1,500.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
11.000
|
$1,500.000
|
$800.000
|
$450.000
|
$450.000
|
$875.000
|
$1,500.000
|
|
|
CL C CONC (CURB)
|
CY
|
6.000
|
$1,100.000
|
$1,800.000
|
$800.000
|
$800.000
|
$382.000
|
$1,500.000
|
|
|
RIPRAP (CONC)(CL C)
|
CY
|
43.000
|
$500.000
|
$500.000
|
$400.000
|
$400.000
|
$450.000
|
$650.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
87.000
|
$180.000
|
$180.000
|
$140.000
|
$136.850
|
$158.000
|
$185.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
105.000
|
$160.000
|
$180.000
|
$147.000
|
$136.850
|
$170.000
|
$185.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
147.000
|
$470.000
|
$350.000
|
$400.000
|
$400.000
|
$372.000
|
$550.000
|
|
|
CONC BOX CULV (9 FT X 5 FT)
|
LF
|
8.000
|
$1,400.000
|
$700.000
|
$650.000
|
$650.000
|
$1,950.000
|
$1,500.000
|
|
|
CONC BOX CULV (10 FT X 9 FT)
|
LF
|
60.000
|
$1,400.000
|
$750.000
|
$1,050.000
|
$1,050.000
|
$1,500.000
|
$1,500.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
352.000
|
$38.000
|
$26.000
|
$25.000
|
$25.000
|
$46.000
|
$65.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
600.000
|
$47.000
|
$32.000
|
$38.000
|
$38.000
|
$55.000
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
234.000
|
$62.000
|
$42.000
|
$50.000
|
$50.000
|
$70.000
|
$95.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
56.000
|
$80.000
|
$82.000
|
$75.000
|
$75.000
|
$100.000
|
$105.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
60.000
|
$110.000
|
$105.000
|
$105.000
|
$105.000
|
$130.000
|
$130.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
12.000
|
$125.000
|
$100.000
|
$115.000
|
$115.000
|
$145.000
|
$225.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
10.000
|
$155.000
|
$186.000
|
$135.000
|
$135.000
|
$170.000
|
$250.000
|
|
|
HEADWALL (CH - FW - 45) (DIA= 42 IN)
|
EA
|
1.000
|
$8,000.000
|
$9,000.000
|
$5,000.000
|
$5,000.000
|
$14,300.000
|
$12,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$5,000.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
$7,000.000
|
$6,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
3.000
|
$6,000.000
|
$3,500.000
|
$3,500.000
|
$3,500.000
|
$8,800.000
|
$10,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
3.000
|
$7,000.000
|
$4,000.000
|
$4,500.000
|
$4,500.000
|
$14,500.000
|
$8,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
2.000
|
$8,000.000
|
$6,500.000
|
$6,000.000
|
$6,000.000
|
$18,000.000
|
$10,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$9,000.000
|
$7,000.000
|
$6,800.000
|
$6,800.000
|
$21,000.000
|
$11,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
2.000
|
$8,500.000
|
$7,500.000
|
$6,500.000
|
$6,500.000
|
$18,000.000
|
$10,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$9,500.000
|
$7,500.000
|
$7,500.000
|
$7,500.000
|
$22,000.000
|
$13,500.000
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
4.000
|
$32,000.000
|
$23,600.000
|
$35,000.000
|
$35,000.000
|
$39,500.000
|
$35,000.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
2.000
|
$10,000.000
|
$8,000.000
|
$15,000.000
|
$15,000.000
|
$14,800.000
|
$30,000.000
|
|
|
HEADWALL (CH-PW-S)(DIA=42 IN)(MOD)
|
EA
|
1.000
|
$9,900.000
|
$10,000.000
|
$6,500.000
|
$6,500.000
|
$14,000.000
|
$30,000.000
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
95.000
|
$525.000
|
$450.000
|
$410.000
|
$410.000
|
$520.000
|
$1,250.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
123.000
|
$580.000
|
$525.000
|
$550.000
|
$550.000
|
$620.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
10.000
|
$630.000
|
$550.000
|
$525.000
|
$525.000
|
$793.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$900.000
|
$675.000
|
$625.000
|
$625.000
|
$850.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$1,000.000
|
$1,075.000
|
$850.000
|
$850.000
|
$1,100.000
|
$2,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
5.000
|
$1,500.000
|
$800.000
|
$950.000
|
$950.000
|
$1,170.000
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$2,000.000
|
$1,800.000
|
$1,800.000
|
$1,870.000
|
$2,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$2,225.000
|
$1,500.000
|
$1,800.000
|
$1,800.000
|
$1,970.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$4,600.000
|
$3,375.000
|
$4,000.000
|
$4,000.000
|
$3,780.000
|
$3,000.000
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$5,000.000
|
$3,000.000
|
$3,800.000
|
$3,800.000
|
$3,200.000
|
$6,000.000
|
|
|
REMOV & RE - LAY PIPE (24 IN)
|
LF
|
44.000
|
$30.000
|
$25.000
|
$25.000
|
$25.000
|
$70.000
|
$30.000
|
|
|
REMOV & RE - LAY PIPE (30 IN)
|
LF
|
18.000
|
$35.000
|
$40.000
|
$35.000
|
$35.000
|
$76.000
|
$30.000
|
|
|
REMOV & RE - LAY PIPE (36 IN)
|
LF
|
28.000
|
$50.000
|
$50.000
|
$38.000
|
$38.000
|
$91.000
|
$30.000
|
|
|
REMOV & RE - LAY PIPE (42 IN)
|
LF
|
16.000
|
$70.000
|
$100.000
|
$45.000
|
$45.000
|
$102.000
|
$50.000
|
|
|
REMOV & RE - LAY PIPE (48 IN)
|
LF
|
16.000
|
$75.000
|
$100.000
|
$55.000
|
$55.000
|
$156.000
|
$50.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
25.000
|
$1,000.000
|
$600.000
|
$800.000
|
$500.000
|
$1,150.000
|
$500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$1,200.000
|
$500.000
|
$800.000
|
$800.000
|
$2,150.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
224.000
|
$25.000
|
$50.000
|
$10.000
|
$10.000
|
$38.000
|
$30.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
47.000
|
$250.000
|
$200.000
|
$200.000
|
$200.000
|
$764.000
|
$3,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$338,000.000
|
$400,000.000
|
$240,500.000
|
$520,995.000
|
$600,000.000
|
$700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$5,000.000
|
$1,500.000
|
$2,717.000
|
$2,921.000
|
$7,000.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
320.000
|
$25.000
|
$32.000
|
$31.800
|
$25.000
|
$35.000
|
$30.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,820.000
|
$29.000
|
$36.000
|
$35.290
|
$29.000
|
$40.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,140.000
|
$9.000
|
$9.760
|
$9.760
|
$10.000
|
$11.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,040.000
|
$3.000
|
$2.730
|
$2.730
|
$1.550
|
$3.500
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,040.000
|
$1.000
|
$1.080
|
$1.080
|
$0.420
|
$1.250
|
$2.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
139.000
|
$100.000
|
$100.000
|
$85.000
|
$80.000
|
$101.000
|
$85.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
710.000
|
$25.000
|
$19.000
|
$19.000
|
$24.560
|
$38.000
|
$42.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
4,329.000
|
$12.000
|
$15.000
|
$13.500
|
$19.480
|
$13.500
|
$15.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
96.000
|
$40.000
|
$37.350
|
$45.000
|
$39.550
|
$62.000
|
$42.000
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
683.000
|
$35.000
|
$45.350
|
$45.000
|
$47.550
|
$79.000
|
$42.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,175.000
|
$24.000
|
$17.400
|
$17.000
|
$17.000
|
$20.000
|
$35.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
100.000
|
$28.000
|
$23.500
|
$22.000
|
$22.000
|
$26.000
|
$35.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
50.000
|
$62.000
|
$76.000
|
$69.000
|
$69.000
|
$100.000
|
$35.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,200.000
|
$4.000
|
$2.000
|
$2.000
|
$2.000
|
$2.500
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
12.000
|
$220.000
|
$200.000
|
$170.000
|
$170.000
|
$250.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,300.000
|
$2,130.000
|
$2,150.000
|
$2,150.000
|
$2,500.000
|
$2,850.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$380.000
|
$275.000
|
$520.000
|
$340.000
|
$325.000
|
$650.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
40.000
|
$160.000
|
$145.000
|
$110.000
|
$120.000
|
$175.000
|
$650.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
3.000
|
$200.000
|
$155.000
|
$240.000
|
$165.000
|
$200.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
147.000
|
$450.000
|
$398.000
|
$402.000
|
$330.000
|
$425.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$575.000
|
$464.000
|
$501.000
|
$385.000
|
$500.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$825.000
|
$574.000
|
$690.000
|
$465.000
|
$600.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$750.000
|
$794.000
|
$1,150.000
|
$750.000
|
$900.000
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
2.000
|
$250.000
|
$245.000
|
$230.000
|
$175.000
|
$275.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
179.000
|
$75.000
|
$60.000
|
$73.000
|
$45.000
|
$75.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
56.000
|
$55.000
|
$50.000
|
$48.000
|
$48.000
|
$55.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
18.000
|
$55.000
|
$23.000
|
$18.000
|
$18.000
|
$27.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,260.000
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.400
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
69,764.000
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.250
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,642.000
|
$1.000
|
$1.000
|
$1.750
|
$2.290
|
$1.600
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
33.000
|
$5.000
|
$6.000
|
$5.500
|
$6.000
|
$7.000
|
$20.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
79,392.000
|
$0.250
|
$0.330
|
$0.380
|
$0.330
|
$0.400
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,260.000
|
$0.250
|
$0.350
|
$0.460
|
$0.350
|
$0.450
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
69,764.000
|
$0.250
|
$0.330
|
$0.430
|
$0.330
|
$0.400
|
$0.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,079.000
|
$2.500
|
$3.000
|
$3.450
|
$3.000
|
$3.750
|
$15.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
110,297.000
|
$1.550
|
$1.700
|
$1.610
|
$2.540
|
$2.250
|
$2.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$500.000
|
$150.000
|
$150.000
|
$150.000
|
$145.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
50.000
|
$50.000
|
$100.000
|
$95.000
|
$100.000
|
$85.000
|
$50.000
|
|
Totals: |
$5,340,551.230
|
$4,843,711.660
|
$5,328,270.150
|
$5,496,246.194
|
$6,115,534.440
|
$7,711,459.750
|