PREPARING ROW
|
STA
|
475.620
|
$2,000.000
|
$474.000
|
$374.000
|
$900.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
14.000
|
$15.000
|
$18.000
|
$18.000
|
$75.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
66.000
|
$16.000
|
$18.000
|
$18.000
|
$40.000
|
|
|
REMOVE CONC (MISC)
|
EA
|
2.000
|
$550.000
|
$2,700.000
|
$1,000.000
|
$1,000.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
50.000
|
$30.000
|
$25.000
|
$70.080
|
$75.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
475.620
|
$190.000
|
$155.000
|
$171.340
|
$265.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
253.000
|
$20.000
|
$25.000
|
$13.850
|
$50.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
30.000
|
$20.000
|
$25.000
|
$116.800
|
$100.000
|
|
|
BACKFILL (TY A)
|
STA
|
237.810
|
$180.000
|
$425.000
|
$171.340
|
$325.000
|
|
|
BACKFILL (TY B)
|
STA
|
237.810
|
$120.000
|
$135.000
|
$450.000
|
$200.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
475.620
|
$200.000
|
$175.000
|
$171.340
|
$220.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
105,696.000
|
$0.120
|
$0.050
|
$0.070
|
$0.150
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
105,696.000
|
$0.120
|
$0.050
|
$0.070
|
$0.150
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
211,391.000
|
$0.220
|
$0.220
|
$0.240
|
$0.270
|
|
|
VEGETATIVE WATERING
|
MG
|
1,268.000
|
$20.000
|
$0.010
|
$8.100
|
$10.000
|
|
|
PROOF ROLLING
|
HR
|
26.000
|
$100.000
|
$50.000
|
$115.870
|
$100.000
|
|
|
FL BS (CMP IN PL)(TY D GR 4)(8")
|
SY
|
126,832.000
|
$18.000
|
$20.080
|
$18.310
|
$13.250
|
|
|
REWORK BS MATL (TY C)(7")(ORD COMP)
|
SY
|
116,262.000
|
$1.750
|
$2.630
|
$2.020
|
$2.250
|
|
|
CEMENT
|
TON
|
770.900
|
$195.000
|
$230.000
|
$226.000
|
$275.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
126,832.000
|
$1.800
|
$3.140
|
$1.850
|
$2.750
|
|
|
ASPH (RC-250)
|
GAL
|
35,513.000
|
$4.500
|
$6.000
|
$5.710
|
$7.250
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
104,003.000
|
$4.750
|
$5.060
|
$5.120
|
$6.000
|
|
|
AGGR (TY-B GR-5)
|
CY
|
906.000
|
$130.000
|
$100.120
|
$145.460
|
$150.000
|
|
|
AGGR (TY-B GR-3)
|
CY
|
1,208.000
|
$140.000
|
$100.120
|
$144.790
|
$150.000
|
|
|
AGGR (TY-PB GR-4)
|
CY
|
1,057.000
|
$160.000
|
$151.250
|
$194.200
|
$175.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
44.000
|
$125.000
|
$125.000
|
$125.000
|
$75.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
300.000
|
$250.000
|
$250.000
|
$250.000
|
$250.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
164.000
|
$15.000
|
$18.000
|
$18.000
|
$15.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
758.000
|
$35.000
|
$80.000
|
$10.000
|
$35.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
3.000
|
$650.000
|
$600.000
|
$600.000
|
$1,500.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
17.000
|
$250.000
|
$150.000
|
$150.000
|
$500.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.000
|
$475.000
|
$600.000
|
$600.000
|
$1,500.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
124.000
|
$175.000
|
$179.000
|
$234.180
|
$150.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
118.000
|
$170.000
|
$169.000
|
$234.180
|
$160.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
72.000
|
$160.000
|
$189.000
|
$234.180
|
$180.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
193.000
|
$600.000
|
$600.000
|
$600.000
|
$700.050
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
4.000
|
$50.000
|
$45.000
|
$45.000
|
$500.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
78.000
|
$70.000
|
$60.000
|
$60.000
|
$75.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
278.000
|
$80.000
|
$85.000
|
$85.000
|
$100.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
138.000
|
$100.000
|
$110.000
|
$110.000
|
$150.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
34.000
|
$130.000
|
$150.000
|
$150.000
|
$250.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
7.000
|
$3,750.000
|
$6,000.000
|
$6,000.000
|
$11,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 30 IN)
|
EA
|
1.000
|
$4,800.000
|
$7,000.000
|
$7,000.000
|
$12,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$6,500.000
|
$14,000.000
|
$14,000.000
|
$16,000.000
|
|
|
SET (TY II) (12 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$425.000
|
$600.000
|
$600.000
|
$750.000
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$450.000
|
$600.000
|
$600.000
|
$750.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
10.000
|
$600.000
|
$800.000
|
$800.000
|
$1,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$850.000
|
$625.000
|
$625.000
|
$750.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$825.000
|
$800.000
|
$800.000
|
$1,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$675.000
|
$1,000.000
|
$1,000.000
|
$1,100.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,300.000
|
$1,200.000
|
$1,200.000
|
$1,275.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,200.000
|
$1,400.000
|
$1,400.000
|
$1,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,100.000
|
$1,600.000
|
$1,600.000
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$1,500.000
|
$2,000.000
|
$2,000.000
|
$2,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,700.000
|
$2,600.000
|
$2,600.000
|
$2,400.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
9.000
|
$2,300.000
|
$3,500.000
|
$3,500.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,400.000
|
$4,500.000
|
$4,500.000
|
$3,000.000
|
|
|
REMOV & RE - LAY PIPE (24 IN)
|
LF
|
20.000
|
$42.000
|
$35.000
|
$35.000
|
$250.000
|
|
|
REMOV & RE - LAY PIPE (36 IN)
|
LF
|
6.000
|
$50.000
|
$55.000
|
$55.000
|
$500.000
|
|
|
REMOV & RE - LAY PIPE (48 IN)
|
LF
|
8.000
|
$60.000
|
$75.000
|
$75.000
|
$2,000.000
|
|
|
REMOV STR (SET)
|
EA
|
25.000
|
$400.000
|
$125.000
|
$125.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
EA
|
10.000
|
$400.000
|
$250.000
|
$250.000
|
$200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$707,143.990
|
$158,100.000
|
$675,000.000
|
$750,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
23.000
|
$5,500.000
|
$3,245.000
|
$6,350.000
|
$2,750.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,800.000
|
$38.000
|
$38.000
|
$35.500
|
$38.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,800.000
|
$7.500
|
$9.000
|
$7.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,010.000
|
$4.000
|
$3.000
|
$2.970
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,010.000
|
$1.000
|
$0.250
|
$0.750
|
$1.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
66.000
|
$85.000
|
$107.000
|
$100.000
|
$250.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,623.000
|
$43.000
|
$42.500
|
$58.220
|
$75.000
|
|
|
TURNOUTS (ACP)
|
SY
|
2,427.000
|
$70.000
|
$90.000
|
$113.500
|
$85.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
708.000
|
$28.000
|
$33.000
|
$23.720
|
$25.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,500.000
|
$30.000
|
$26.000
|
$26.000
|
$37.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$2,250.000
|
$2,350.000
|
$2,350.000
|
$2,800.000
|
|
|
SHORT RADIUS
|
LF
|
125.000
|
$60.000
|
$38.000
|
$38.000
|
$75.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$1,200.000
|
$1,085.000
|
$1,085.000
|
$1,600.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
150.000
|
$85.000
|
$82.000
|
$82.000
|
$115.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
3.000
|
$900.000
|
$875.000
|
$875.000
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,700.000
|
$2.800
|
$1.000
|
$1.000
|
$5.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
8.000
|
$210.000
|
$185.000
|
$185.000
|
$225.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
17.000
|
$3,200.000
|
$2,950.000
|
$2,950.000
|
$3,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$250.000
|
$200.000
|
$200.000
|
$300.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
60.000
|
$256.000
|
$216.000
|
$264.000
|
$675.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
4.000
|
$295.000
|
$239.000
|
$299.000
|
$700.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
2.000
|
$450.000
|
$650.000
|
$469.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
108.000
|
$630.000
|
$810.000
|
$634.000
|
$825.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
9.000
|
$900.000
|
$1,012.000
|
$847.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$925.000
|
$1,301.000
|
$898.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$900.000
|
$1,727.000
|
$969.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$850.000
|
$1,846.000
|
$1,123.000
|
$1,200.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
83.000
|
$600.000
|
$550.000
|
$544.000
|
$300.000
|
|
|
RELOCATE SM RD SN SUP&AM(HIST MRKR)
|
EA
|
1.000
|
$600.000
|
$1,000.000
|
$1,000.000
|
$2,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
114.000
|
$82.000
|
$75.000
|
$84.000
|
$250.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
156.000
|
$30.000
|
$22.000
|
$22.000
|
$34.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
95,080.000
|
$0.300
|
$0.150
|
$0.150
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
7,050.000
|
$0.250
|
$0.250
|
$0.250
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
59,339.000
|
$0.300
|
$0.150
|
$0.150
|
$0.400
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,085.000
|
$1.000
|
$2.000
|
$2.250
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
165.000
|
$6.700
|
$25.000
|
$25.000
|
$8.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
95,080.000
|
$0.580
|
$0.650
|
$0.650
|
$0.850
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
7,050.000
|
$0.600
|
$0.650
|
$0.650
|
$1.250
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
59,339.000
|
$0.580
|
$0.650
|
$0.650
|
$0.900
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
137,402.000
|
$1.500
|
$1.150
|
$1.490
|
$1.550
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$17.000
|
$12,000.000
|
$12,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
184.000
|
$190.000
|
$185.000
|
$100.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$60.000
|
$75.000
|
$100.000
|
$95.000
|
|
Totals: |
$7,781,933.920
|
$7,082,890.090
|
$7,439,804.257
|
$7,804,914.520
|