PREPARING ROW
|
STA
|
227.610
|
$1,000.000
|
$1,072.000
|
$1,150.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
118.000
|
$22.750
|
$15.000
|
$15.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
130.000
|
$20.000
|
$25.000
|
$100.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
227.610
|
$200.000
|
$200.000
|
$400.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
164.000
|
$20.000
|
$66.000
|
$100.000
|
|
|
BACKFILL (TY B)
|
STA
|
227.610
|
$200.000
|
$250.000
|
$400.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
227.610
|
$225.000
|
$300.000
|
$400.000
|
|
|
BULLDOZER WORK
|
HR
|
20.000
|
$150.000
|
$247.000
|
$150.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
20.000
|
$150.000
|
$247.000
|
$750.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
59,965.000
|
$0.120
|
$0.100
|
$0.200
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
59,965.000
|
$0.120
|
$0.100
|
$0.200
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
119,931.000
|
$0.500
|
$0.300
|
$0.450
|
|
|
VEGETATIVE WATERING
|
MG
|
720.000
|
$20.000
|
$60.000
|
$25.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
1,000.000
|
$1.000
|
$2.000
|
$5.000
|
|
|
PROOF ROLLING
|
HR
|
30.000
|
$100.000
|
$75.000
|
$105.000
|
|
|
FL BS(CMP IN PLC)(TY D GR 4)(9")
|
SY
|
70,811.000
|
$20.000
|
$25.570
|
$28.500
|
|
|
REWRKING BS MATL (TY C)(10")(ORD COMP)
|
SY
|
55,638.000
|
$2.500
|
$3.690
|
$3.250
|
|
|
CEMENT
|
TON
|
430.000
|
$225.000
|
$300.000
|
$300.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
70,811.000
|
$1.750
|
$3.950
|
$3.750
|
|
|
ASPH (RC-250)
|
GAL
|
19,828.000
|
$4.200
|
$7.000
|
$6.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
506.000
|
$130.000
|
$116.250
|
$125.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
590.000
|
$175.000
|
$187.500
|
$180.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
59,482.000
|
$3.850
|
$6.500
|
$6.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
674.000
|
$125.000
|
$125.000
|
$125.000
|
|
|
CUT & RESTORING PAV
|
SY
|
826.000
|
$100.000
|
$75.000
|
$100.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
60.000
|
$150.000
|
$75.000
|
$100.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
384.000
|
$175.000
|
$275.000
|
$275.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
605.000
|
$5.000
|
$15.000
|
$15.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
6,068.000
|
$25.000
|
$65.000
|
$45.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.000
|
$500.000
|
$575.000
|
$575.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
100.000
|
$300.000
|
$265.000
|
$400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
48.000
|
$400.000
|
$575.000
|
$575.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
50.000
|
$300.000
|
$700.000
|
$700.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
736.000
|
$50.000
|
$55.000
|
$55.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
118.000
|
$75.000
|
$85.000
|
$85.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
407.000
|
$115.000
|
$140.000
|
$140.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
184.000
|
$175.000
|
$175.000
|
$175.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
90.000
|
$215.000
|
$250.000
|
$250.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$4,000.000
|
$6,500.000
|
$6,500.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$6,000.000
|
$9,000.000
|
$9,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
4.000
|
$7,000.000
|
$8,500.000
|
$8,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
3.000
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
6.000
|
$10,500.000
|
$14,000.000
|
$14,000.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$12,500.000
|
$15,000.000
|
$15,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
78.000
|
$900.000
|
$750.000
|
$750.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$1,500.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$1,600.000
|
$1,600.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$1,800.000
|
$2,200.000
|
$2,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$2,500.000
|
$2,800.000
|
$2,800.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,800.000
|
$4,500.000
|
$4,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$3,500.000
|
$7,500.000
|
$7,500.000
|
|
|
SET (REMOV & REINSTALL)
|
EA
|
2.000
|
$1,200.000
|
$500.000
|
$500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$2,000.000
|
$1,000.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,163.000
|
$30.000
|
$10.000
|
$10.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$348,770.060
|
$256,500.000
|
$625,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$5,500.000
|
$6,619.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
885.000
|
$35.000
|
$40.000
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
885.000
|
$5.000
|
$9.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,050.000
|
$2.250
|
$3.500
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,050.000
|
$0.800
|
$0.100
|
$2.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
118.000
|
$75.000
|
$120.000
|
$100.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
681.000
|
$24.000
|
$68.500
|
$75.000
|
|
|
TURNOUTS (ACP)
|
SY
|
754.000
|
$57.000
|
$108.000
|
$105.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
1,837.000
|
$21.000
|
$25.000
|
$31.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
450.000
|
$26.000
|
$26.750
|
$27.500
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
50.000
|
$30.000
|
$36.500
|
$60.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
200.000
|
$2.500
|
$2.000
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$200.000
|
$200.000
|
$400.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,600.000
|
$2,800.000
|
$3,200.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
23.000
|
$190.000
|
$250.000
|
$185.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
3.000
|
$225.000
|
$275.000
|
$225.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
38.000
|
$430.000
|
$700.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$560.000
|
$780.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
1.000
|
$900.000
|
$970.000
|
$1,250.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$600.000
|
$1,222.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$1,738.000
|
$950.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
44.000
|
$80.000
|
$55.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
40.000
|
$55.000
|
$45.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$28.000
|
$25.000
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
45,000.000
|
$0.250
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
18,049.000
|
$0.250
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
18,229.000
|
$0.250
|
$0.500
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,000.000
|
$2.250
|
$2.000
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
212.000
|
$5.500
|
$7.000
|
$7.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
4.000
|
$75.000
|
$100.000
|
$100.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
45,000.000
|
$0.850
|
$1.100
|
$1.100
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
9,028.000
|
$0.850
|
$1.300
|
$1.300
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
19,325.000
|
$0.850
|
$1.100
|
$1.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
800.000
|
$3.500
|
$4.000
|
$4.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
76,502.000
|
$1.400
|
$5.000
|
$7.870
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$22,500.000
|
$18,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
300.000
|
$200.000
|
$250.000
|
$325.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
50.000
|
$100.000
|
$175.000
|
$250.000
|
|
Totals: |
$4,585,160.310
|
$6,203,272.060
|
$7,169,479.840
|