Show Job Controls
Bid Cobra

FALLS COUNTY ROAD 162 (0909-38-095)

Items: 48

County: FALLS
Length: 0.2130 MILES
Highway: COUNTY ROAD 162
District: WACO
Control Number: 0909-38-095
DBE Goal: 5.0%
Project: BR 2023(430)
Guaranty: $59,000.00
Time: 225 WORKING DAYS
Engineer's Estimate: $2,828,068.75
Date: 05/02/2025 (1 year ago)
Contract Number: 5253218
Type: BRIDGE REPLACEMENT
Project ID: A00180846
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JOSH VOILES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$2,828,068.75
$2,238,703.19
Over/Under Est: -20.84% -$589,365.56
Over/Under Est: -14.2% -$401,675.85
Amt Left: 8.38% $187,689.71
$2,474,837.30
Over/Under Est: -12.49% -$353,231.45
Amt Left: 10.55% $236,134.11
Delta: -2.00% -$48,444.40
Over/Under Est: -8.94% -$252,730.25
Amt Left: 15.04% $336,635.31
Delta: -4.06% -$100,501.20
$2,759,995.00
Over/Under Est: -2.41% -$68,073.75
Amt Left: 23.29% $521,291.81
Delta: -7.17% -$184,656.50
Over/Under Est: -0.44% -$12,448.75
Amt Left: 25.77% $576,916.81
Delta: -2.02% -$55,625.00
Over/Under Est: -0.32% -$8,939.45
Amt Left: 25.93% $580,426.11
Delta: -0.12% -$3,509.30
Over/Under Est: 9.43% $266,788.25
Amt Left: 38.24% $856,153.81
Delta: -9.78% -$275,727.70
Subcontractor Percentage Amount
CEN TEX HYDROSEED, INC. 2.35% $54,242.66
FORTSON CONTRACTING, INC. 1.53% $35,315.43
HERMANOS STEEL, LLC 0.47% $10,848.53
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.47% $10,848.53
HOUSTON SAWING & DRILLING 0.20% $4,616.40
Total: 5.02% $115,871.55

Bid Items & Bid Tabulations

48 Total 0 of 48
FALLS  |  COUNTY ROAD 162  |  WACO  |  0909-38-095  |  05/02/2025  |  $2,828,068.75  |  BR 2023(430)  |  BRIDGE REPL  |  225 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
KNIFE RIVER CORPORATION - SOUTH
STX CIVIL
HODGES AND SON CONSTRUCTION COMPANY, INC.
PMCO CONSTRUCTION LLC
JAMES CONSTRUCTION GROUP, LLC
E-Z BEL CONSTRUCTION, LLC
TEXAS STEEL INDUSTRIAL PLACING, LLC
PREPARING ROW
STA 8.400 $10,590.000 $15,000.000 $7,750.000 $4,000.000 $6,000.000 $4,000.000 $33,500.000 $5,000.000 $5,000.000
RMV (0"-10") TRT/UNTRT BASE & ASPH PAV
SY 2,365.000 $12.000 $6.500 $7.540 $8.000 $8.000 $15.000 $12.710 $6.000 $10.000
EXCAV (ROADWAY)
CY 599.000 $30.000 $20.000 $30.000 $15.500 $30.000 $24.000 $45.030 $15.000 $20.000
EXCAV (CHANNEL)
CY 5,196.000 $50.000 $20.000 $20.000 $35.000 $20.000 $18.000 $17.150 $19.000 $19.000
EMBANK (FNL)(OC)(TY B)
CY 503.000 $50.000 $40.000 $25.000 $40.000 $40.000 $32.000 $64.580 $35.000 $30.000
FURN & PLACE TOPSOIL (4")
SY 5,829.000 $5.000 $1.500 $1.500 $4.000 $3.000 $3.500 $0.880 $15.000 $4.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 5,829.000 $1.000 $1.580 $1.750 $1.000 $1.500 $1.500 $1.350 $1.000 $1.000
BROADCAST SEED (TEMP_WARM_COOL)
SY 5,829.000 $0.500 $1.050 $1.100 $1.000 $1.100 $1.500 $1.100 $1.000 $1.000
VEGETATIVE WATERING
TGL 95.000 $34.000 $5.000 $20.000 $50.000 $1.000 $50.000 $42.460 $90.000 $25.000
SOIL RET BLKT(CHAN_TEMP_2 PSF)
SY 2,444.000 $4.000 $2.500 $2.650 $4.000 $2.000 $2.000 $1.750 $6.000 $5.000
FL BS (CMP IN PLC)(TY D GR 3)(FNAL POS)
CY 405.000 $90.000 $75.000 $130.000 $150.000 $120.000 $150.000 $145.930 $114.000 $140.000
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 2,917.000 $4.000 $8.000 $3.500 $5.000 $10.000 $10.000 $6.000 $8.000 $10.000
CEM STABIL BKFL
CY 320.000 $250.000 $185.000 $240.000 $190.000 $300.000 $250.000 $193.730 $94.000 $200.000
TRENCH EXCAVATION PROTECTION
LF 26.000 $15.000 $20.000 $10.000 $8.000 $5.000 $200.000 $373.620 $1.000 $100.000
DRILL SHAFT (24 IN)
LF 300.000 $225.000 $170.000 $310.000 $250.000 $160.000 $250.000 $200.640 $233.000 $325.000
CL C CONC (ABUT)
CY 17.600 $1,500.000 $3,150.000 $2,500.000 $1,500.000 $2,200.000 $1,850.000 $1,610.350 $2,750.000 $1,750.000
CL C CONC (CAP)
CY 13.200 $1,740.000 $3,300.000 $2,500.000 $2,500.000 $2,400.000 $2,500.000 $2,919.430 $3,200.000 $2,000.000
CL C CONC (COLUMN)
CY 9.300 $2,000.000 $1,120.000 $2,500.000 $2,200.000 $2,400.000 $2,600.000 $3,026.200 $2,800.000 $2,000.000
REINF CONC SLAB (SLAB BEAM)
SF 2,600.000 $29.000 $29.000 $28.000 $30.000 $26.000 $28.000 $33.500 $31.000 $30.000
PRESTR CONC SLAB BEAM (5SB12)
LF 492.370 $250.000 $240.000 $340.000 $265.000 $280.000 $255.000 $299.190 $340.000 $300.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,709.000 $230.000 $130.000 $208.000 $200.000 $160.000 $160.000 $197.350 $231.000 $225.000
RAIL (TY T223)
LF 531.000 $175.000 $175.000 $190.000 $160.000 $160.000 $190.000 $129.630 $320.000 $175.000
ARMOR JOINT (SEALED)
LF 50.000 $100.000 $175.000 $180.000 $180.000 $150.000 $150.000 $145.740 $199.000 $225.000
CONC BOX CULV (13 FT X 13 FT)
LF 130.000 $4,000.000 $2,400.000 $2,600.000 $4,200.000 $2,200.000 $5,000.000 $2,652.040 $4,800.000 $6,250.000
RC PIPE (CL III)(48 IN)
LF 26.000 $350.000 $270.000 $350.000 $400.000 $600.000 $480.000 $322.250 $622.000 $498.000
WINGWALL (PW - 1) (HW=16 FT)
EA 2.000 $135,000.000 $135,000.000 $135,000.000 $95,000.000 $270,000.000 $200,000.000 $77,645.820 $118,000.000 $150,000.000
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 2.000 $9,000.000 $9,000.000 $12,500.000 $15,000.000 $20,000.000 $14,500.000 $7,393.090 $17,000.000 $15,775.000
REMOV STR (HEADWALL)
EA 2.000 $1,400.000 $2,500.000 $2,000.000 $1,200.000 $10,000.000 $3,500.000 $1,474.140 $3,800.000 $2,500.000
REMOV STR (PIPE)
LF 37.000 $50.000 $50.000 $15.000 $15.000 $50.000 $40.000 $24.170 $45.000 $50.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $36,000.000 $15,000.000 $28,000.000 $35,000.000 $50,000.000 $18,500.000 $163,500.000 $34,000.000 $35,000.000
MOBILIZATION
LS 1.000 $260,000.000 $190,000.000 $242,000.000 $225,000.000 $225,000.000 $276,000.000 $281,399.860 $250,000.000 $310,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $5,000.000 $10,000.000 $1,500.000 $1,600.000 $2,500.000 $3,000.000 $2,992.610 $1,200.000 $4,425.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $15,000.000 $12,500.000 $8,000.000 $26,000.000 $6,000.000 $10,195.480 $10,000.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 242.000 $80.000 $42.000 $45.000 $40.000 $1.000 $42.000 $59.000 $50.000 $75.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 111.000 $80.000 $86.000 $80.000 $40.000 $1.000 $50.000 $97.000 $80.000 $125.000
ROCK FILTER DAMS (REMOVE)
LF 353.000 $19.500 $17.000 $16.000 $4.000 $1.000 $12.000 $21.400 $16.000 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,328.000 $5.500 $7.000 $12.500 $6.000 $1.000 $5.750 $6.000 $6.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,328.000 $2.000 $1.580 $1.750 $1.000 $1.000 $3.170 $2.000 $2.000 $1.000
MTL W-BEAM GD FEN (STEEL POST)
LF 306.250 $37.000 $31.500 $35.000 $35.000 $30.000 $36.500 $30.000 $34.000 $32.000
MTL BEAM GD FEN TRANS (TL2)
EA 8.000 $1,300.000 $1,050.000 $1,600.000 $1,200.000 $1,500.000 $1,565.000 $1,000.000 $1,525.000 $1,400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,440.000 $1,260.000 $1,650.000 $1,450.000 $1,500.000 $1,724.000 $1,200.000 $1,685.000 $1,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,150.000 $3,500.000 $3,000.000 $3,200.000 $3,425.000 $3,000.000 $3,100.000 $3,300.000
WIRE FENCE (TY C)
LF 806.000 $50.000 $8.000 $25.000 $30.000 $20.000 $30.000 $33.000 $35.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 20.000 $30.000 $21.000 $30.000 $35.000 $45.000 $55.000 $20.000 $25.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $30.000 $31.500 $40.000 $60.000 $45.000 $54.990 $30.000 $71.000 $50.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 2.000 $105.000 $52.500 $100.000 $95.000 $500.000 $99.750 $50.000 $58.000 $200.000
DRIFTWOOD REMOVAL
LS 1.000 $5,000.000 $5,000.000 $4,000.000 $5,000.000 $4,000.000 $11,500.000 $45,196.780 $500.000 $10,000.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 2.000 $650.000 $5,000.000 $2,500.000 $650.000 $2,000.000 $1,500.000 $2,590.720 $500.000 $1,500.000
Totals: $2,828,068.750 $2,238,703.185 $2,426,392.900 $2,474,837.300 $2,575,338.500 $2,759,994.995 $2,815,619.996 $2,819,129.300 $3,094,857.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $10,000.00