Show Job Controls
Bid Cobra

FALLS FM 46 (0049-13-010)

Items: 75

County: FALLS
Length: 0.0000 MILES
Highway: FM 46
District: WACO
Control Number: 0049-13-010
DBE Goal: 0.0%
Project: C 49-13-10
Guaranty: $98,000.00
Time: 150 WORKING DAYS
Engineer's Estimate: $4,914,108.92
Date: 02/07/2025 (1 year ago)
Contract Number: 2253214
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00183926
Project Description: REHAB AND WIDEN
Mail/Deliver Bids To: N/A
JOSH VOILES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$4,914,108.92
$3,949,757.01
Over/Under Est: -19.62% -$964,351.91
Over/Under Est: -16.21% -$796,600.40
Amt Left: 4.25% $167,751.51
Over/Under Est: -15.63% -$768,106.72
Amt Left: 4.97% $196,245.19
Delta: -0.69% -$28,493.68
$4,206,741.89
Over/Under Est: -14.39% -$707,367.03
Amt Left: 6.51% $256,984.88
Delta: -1.47% -$60,739.69
$4,621,812.59
Over/Under Est: -5.95% -$292,296.33
Amt Left: 17.02% $672,055.58
Delta: -9.87% -$415,070.70
$6,026,363.62
Over/Under Est: 22.63% $1,112,254.70
Amt Left: 52.58% $2,076,606.61
Delta: -30.39% -$1,404,551.03
Subcontractor Percentage Amount
CEN TEX HYDROSEED, INC. 2.62% $103,152.10
FORTSON CONTRACTING, INC. 1.92% $75,592.38
D. I. J. CONSTRUCTION, INC. 1.69% $66,537.04
4E TREE WORX LLC 1.16% $45,670.39
MARCOMS CONSTRUCTION LLC 0.68% $26,772.30
ROADWAY TRAFFIC CONTROL LLC 0.56% $22,047.78
WEST TEXAS RUMBLE STRIP LLC 0.19% $7,480.50
WEST TEXAS ROCK RESOURCES, LLC 0.00% $0.00
Total: 8.82% $347,252.49

Bid Items & Bid Tabulations

75 Total 0 of 75
FALLS  |  FM 46  |  WACO  |  0049-13-010  |  02/07/2025  |  $4,914,108.92  |  C 49-13-10  |  REHAB EXIST ROADWAY  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
CDM HOLDINGS
A. L. HELMCAMP, INC.
LAKEY, INC.
PREPARING ROW
STA 149.200 $1,000.000 $750.000 $535.000 $650.000 $500.000 $750.000 $1,300.000
REMOV CONC (RIPRAP)
SY 52.000 $60.000 $35.000 $50.000 $30.000 $21.000 $83.000 $26.379
RMV (6"-10") TRT/UNTRT BASE & ASPH PAV
SY 1,795.000 $20.000 $12.000 $25.000 $4.000 $12.500 $20.000 $18.000
EXCAV (ROADWAY)
CY 1,862.000 $20.000 $15.000 $27.000 $15.000 $22.000 $8.000 $16.000
EMBANK (FNL)(DC)(TY B)
CY 7,913.000 $25.000 $25.000 $32.000 $25.000 $35.000 $30.000 $65.000
SPEC EXCAV WORK (BACKHOE)
HR 4.000 $200.000 $200.000 $176.000 $300.000 $160.000 $116.000 $125.000
FURN & PLACE TOPSOIL (4")
SY 79,279.000 $2.000 $0.600 $0.460 $0.500 $1.000 $0.700 $3.200
DRILL SEED (PERM_RURAL_CLAY)
SY 79,279.000 $0.330 $0.250 $0.180 $0.180 $0.260 $0.180 $0.400
DRILL SEED (TEMP_WARM_COOL)
SY 79,279.000 $0.330 $0.250 $0.160 $0.160 $0.230 $0.160 $0.275
VEGETATIVE WATERING
TGL 1,290.000 $34.000 $5.000 $37.000 $1.000 $25.000 $5.000 $34.500
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 9,116.000 $72.500 $60.000 $58.500 $63.000 $52.000 $70.000 $45.000
FL BS (RDWY DEL)(TY D GR 3)(FINAL POS)
CY 5,998.000 $75.000 $50.000 $37.000 $44.000 $50.000 $52.000 $133.000
REWORK BS MTL (TY C)(8")(ORD COMP)
SY 56,366.000 $2.200 $1.500 $0.900 $2.500 $2.000 $1.000 $8.000
CEMENT
TON 537.000 $250.000 $250.000 $230.000 $240.000 $237.000 $250.000 $236.250
CEMENT TRT (EXIST MATL)(6")
SY 56,366.000 $2.000 $3.000 $2.750 $2.500 $2.750 $5.000 $4.221
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 65,646.000 $5.200 $3.000 $3.600 $2.000 $3.500 $4.750 $12.600
FOG SEAL (CSS-1H)
GAL 5,475.000 $4.500 $5.000 $4.550 $3.700 $3.000 $4.750 $2.587
ASPH (CRS-2)
GAL 33,923.000 $3.750 $3.000 $3.300 $3.000 $3.700 $4.250 $4.284
AGGR (TY-D OR L, GR-4)
CY 417.000 $280.000 $125.000 $180.000 $185.000 $200.000 $275.000 $133.000
SP MIXES SP-C SAC-B PG70-22
TON 5,834.000 $120.000 $100.000 $143.000 $125.000 $145.000 $110.000 $134.500
TACK COAT
GAL 5,311.000 $2.000 $3.000 $2.900 $2.500 $3.000 $3.500 $4.480
CUT & RESTORE ASPH PAVING
SY 48.000 $275.000 $200.000 $250.000 $150.000 $140.000 $50.000 $157.950
CEM STABIL BKFL
CY 54.000 $300.000 $200.000 $200.000 $283.000 $275.000 $273.000 $225.000
TRENCH EXCAVATION PROTECTION
LF 118.000 $50.000 $10.000 $8.000 $8.700 $90.000 $8.500 $10.000
CL C CONC (MISC)
CY 3.290 $2,500.000 $7,000.000 $2,500.000 $6,500.000 $4,000.000 $6,350.000 $1,507.500
RIPRAP (MOW STRIP)(4 IN)
CY 122.200 $650.000 $750.000 $675.000 $640.000 $600.000 $623.000 $700.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 108.830 $245.000 $200.000 $300.000 $235.000 $222.000 $233.000 $185.000
MISC NON-BRIDGE (NBIS)
LB 96.000 $30.000 $25.000 $7.000 $10.000 $150.000 $8.000 $90.000
RC PIPE (CL III)(18 IN)
LF 804.000 $90.000 $90.000 $65.000 $101.000 $70.000 $98.000 $90.000
RC PIPE (CL III)(24 IN)
LF 152.000 $120.000 $125.000 $150.000 $150.000 $95.000 $145.000 $114.570
RC PIPE (CL III)(36 IN)
LF 64.000 $220.000 $175.000 $300.000 $217.000 $172.000 $210.000 $185.557
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 8.000 $1,700.000 $1,250.000 $1,000.000 $1,423.000 $859.000 $1,375.000 $1,620.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 46.000 $1,700.000 $1,250.000 $1,000.000 $1,482.000 $872.000 $1,430.000 $1,569.577
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,800.000 $1,400.000 $2,000.000 $1,458.000 $1,340.000 $1,410.000 $1,597.500
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $2,000.000 $1,600.000 $2,500.000 $1,707.000 $1,440.000 $1,650.000 $1,924.065
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $4,000.000 $6,000.000 $4,500.000 $5,865.000 $4,809.000 $5,665.000 $6,910.470
CLEAN EXIST CULVERTS
EA 4.000 $2,500.000 $2,500.000 $2,500.000 $2,338.000 $2,500.000 $2,260.000 $4,750.000
REMOV STR (SET)
EA 12.000 $700.000 $500.000 $750.000 $638.000 $650.000 $620.000 $704.250
REMOV STR (PIPE)
LF 786.000 $44.000 $15.000 $30.000 $13.000 $30.000 $13.000 $20.000
MOBILIZATION
LS 1.000 $350,000.000 $390,000.000 $320,000.000 $395,000.000 $300,000.000 $350,000.000 $113,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $7,500.000 $5,000.000 $2,440.000 $14,000.000 $8,000.000 $17,000.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $10,250.000 $3,000.000 $15,000.000 $6,500.000 $10,000.000 $9,150.000
TMA (STATIONARY)
DAY 196.000 $300.000 $225.000 $10.000 $100.000 $100.000 $250.000 $205.000
TMA (MOBILE OPERATION)
HR 100.000 $65.000 $60.000 $40.000 $25.000 $55.000 $50.000 $61.250
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 600.000 $52.000 $35.000 $36.000 $47.000 $46.000 $38.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 600.000 $15.000 $10.000 $10.000 $12.000 $10.500 $10.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,026.000 $5.300 $3.500 $4.000 $4.000 $6.150 $3.150 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,026.000 $1.300 $1.000 $0.350 $1.050 $1.100 $1.050 $1.250
DRIVEWAYS (ACP) (TY 1)
SY 1,795.000 $70.000 $50.000 $108.000 $63.000 $40.000 $90.000 $49.500
TURNOUTS (ACP)
SY 164.000 $100.000 $50.000 $26.000 $75.000 $55.000 $95.000 $90.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 29,545.000 $0.500 $0.250 $0.360 $0.300 $0.190 $0.300 $0.250
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 14,630.000 $0.400 $0.500 $0.420 $0.300 $0.390 $0.300 $0.345
MTL W-BEAM GD FEN (STEEL POST)
LF 1,325.000 $35.000 $35.000 $30.000 $32.000 $30.000 $32.000 $31.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,300.000 $3,000.000 $2,877.500 $3,100.000 $2,960.000 $3,025.000 $2,877.500
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 3.000 $390.000 $200.000 $190.000 $206.000 $230.000 $200.000 $306.180
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 1.000 $420.000 $250.000 $215.000 $233.000 $271.000 $225.000 $340.200
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $1,100.000 $800.000 $775.000 $842.000 $940.000 $815.000 $765.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $1,500.000 $1,000.000 $990.000 $1,076.000 $1,092.000 $1,040.000 $652.500
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 35.000 $700.000 $500.000 $495.000 $538.000 $490.000 $520.000 $512.290
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 2.000 $750.000 $600.000 $550.000 $598.000 $663.000 $575.000 $587.500
REMOVE SM RD SN SUP&AM
EA 28.000 $150.000 $100.000 $100.000 $105.000 $125.000 $105.000 $115.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 9.000 $350.000 $500.000 $550.000 $250.000 $250.000 $315.000 $600.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2(BI)
EA 24.000 $50.000 $50.000 $45.000 $49.000 $46.000 $48.000 $125.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 8.000 $25.000 $50.000 $90.000 $54.000 $51.000 $55.000 $2.500
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 30,815.000 $0.500 $0.420 $0.340 $0.460 $0.320 $0.440 $0.435
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 2,560.000 $0.500 $0.420 $0.340 $0.460 $0.320 $0.440 $0.330
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 15,813.000 $0.500 $0.420 $0.340 $0.460 $0.320 $0.440 $0.410
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,559.000 $2.500 $1.500 $1.010 $1.500 $1.000 $1.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 88.000 $12.000 $25.000 $16.000 $27.000 $13.500 $27.000 $8.590
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 30,815.000 $0.820 $0.800 $0.770 $0.820 $0.820 $0.790 $0.900
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 2,560.000 $0.820 $0.800 $0.770 $0.820 $0.820 $0.790 $0.860
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 15,813.000 $0.860 $0.800 $0.770 $0.820 $0.820 $0.790 $0.900
PRFB RUMBLE STRIP (BLK)(4')(TRANSVERSE)
LF 80.000 $20.000 $25.000 $25.000 $27.000 $19.500 $26.000 $17.000
PREFAB PM TY C (W)(WORD)
EA 2.000 $350.000 $575.000 $1,060.000 $600.000 $350.000 $295.000 $300.000
REFL PAV MRKR TY II-A-A
EA 603.000 $9.000 $7.000 $5.200 $6.750 $5.250 $7.000 $5.500
Totals: $4,914,108.920 $3,949,757.010 $4,117,508.520 $4,146,002.200 $4,206,741.890 $4,621,812.590 $6,026,363.596