Show Job Controls
Bid Cobra

ERATH US0377 (6485-49-001)

Items: 30

County: ERATH
Length: 0.0100 MILES
Highway: US0377
District: FORT WORTH
Control Number: 6485-49-001
DBE Goal: N/A
Project: RMC - A00215974
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $1,141,647.90
Date: 08/08/2025 (10 months ago) Changed
Contract Number: 8254208
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00215974
Project Description: FY26 METAL BEAM GUARD FENCE AND CABLE FENCE REPAIR IN HOOD, ERATH, AND SOMERVELL COUNTIES.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SARAH HORNER
TEMI ABAYOMI
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,141,647.90
$524,135.00
Over/Under Est: -54.09% -$617,512.90
$938,685.00
Over/Under Est: -17.78% -$202,962.90
Amt Left: 79.09% $414,550.00
Over/Under Est: 3.97% $45,302.10
Amt Left: 126.46% $662,815.00
Delta: -26.45% -$248,265.00

Bid Items & Bid Tabulations

30 Total 0 of 30
ERATH  |  US0377  |  FORT WORTH  |  6485-49-001  |  08/08/2025  |  $1,141,647.90  |  RMC - A00215974  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
T&L CLEANING SERVICES LLC
RHINO EQUITY, LLC
ABOVE ALL CONTRACTING LLC
MOBILIZATION (CALLOUT)
EA 50.000 $1,880.980 $1.000 $1.000 $1.000
MOBILIZATION (EMERGENCY)
EA 5.000 $1,763.100 $1.000 $1.000 $1,000.000
TMA (STATIONARY)
DAY 150.000 $122.720 $1.000 $2,200.000 $500.000
MTL W-BEAM GD FEN (TIM POST)
LF 7,500.000 $32.060 $26.000 $16.000 $45.000
MTL W-BEAM GD FEN (STEEL POST)
LF 500.000 $35.190 $28.000 $22.000 $60.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $2,576.540 $2,000.000 $1,800.000 $1,700.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 5.000 $800.000 $1,000.000 $1.000 $750.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 10.000 $2,500.000 $500.000 $1,000.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 7,500.000 $5.820 $0.010 $1.000 $1.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 5,000.000 $27.000 $40.000 $12.000 $30.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 1,000.000 $23.000 $20.000 $15.000 $30.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 10.000 $55.000 $200.000 $300.000 $500.000
REPLACE TIMBER POST W/O CONC FND
EA 200.000 $10.000 $1.000 $30.000 $100.000
REPLACE STEEL POST W/O CONC FND
EA 100.000 $60.000 $1.000 $60.000 $100.000
REALIGN POSTS
EA 75.000 $25.000 $1.000 $25.000 $50.000
REPLACE BLOCKOUT
EA 100.000 $20.000 $1.000 $25.000 $100.000
REPAIR STEEL POST WITH BASE PLATE
EA 25.000 $100.000 $200.000 $100.000 $300.000
RESET SGT IMPACT HEAD
EA 15.000 $100.000 $1.000 $100.000 $200.000
REPLACE SGT CABLE ANCHOR
EA 15.000 $120.000 $1.000 $100.000 $120.000
REPLACE SGT CABLE ASSEMBLY
EA 15.000 $110.000 $1.000 $150.000 $120.000
REPLACE SGT STRUT
EA 15.000 $120.000 $1.000 $100.000 $120.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $1,500.000 $2,000.000 $1,000.000 $2,500.000
REALIGN EXISTING RAIL
LF 300.000 $35.000 $1.000 $10.000 $10.000
REPLACE CRT POST (WOOD)
EA 500.000 $3.000 $20.000 $1.000 $75.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 1,000.000 $175.000 $1.000 $130.000 $180.000
REPLACE POSTS (TL-4)(TRINITY)
EA 1,000.000 $175.000 $1.000 $180.000 $180.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $60.000 $300.000 $100.000 $300.000
REPLACE CABLE (TL-4)
LF 2,000.000 $6.000 $0.010 $1.000 $5.000
CHECK / RE-TENSION CABLE (TL-4)
EA 20.000 $900.000 $1,000.000 $500.000 $300.000
REPLACE POST HARDWARE (TL-4)
EA 2,000.000 $38.320 $1.000 $1.000 $1.000
Totals: $1,141,647.900 $524,135.000 $938,685.000 $1,186,950.000