Show Job Controls
Bid Cobra

ERATH US0377 (6434-04-001)

Items: 33

County: ERATH
Length: N/A
Highway: US0377
District: FORT WORTH
Control Number: 6434-04-001
DBE Goal: N/A
Project: RMC - 643404001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $774,138.84
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SARAH HORNER
FORREST MOSS
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$774,138.84
$498,349.00
Over/Under Est: -35.63% -$275,789.84
Over/Under Est: -25.04% -$193,870.84
Amt Left: 16.44% $81,919.00
Over/Under Est: -1.26% -$9,775.84
Amt Left: 53.38% $266,014.00
Delta: -31.73% -$184,095.00
$1,511,100.00
Over/Under Est: 95.2% $736,961.16
Amt Left: 203.22% $1,012,751.00
Delta: -97.69% -$746,737.00

Bid Items & Bid Tabulations

33 Total 0 of 33
ERATH  |  US0377  |  FORT WORTH  |  6434-04-001  |  08/03/2023  |  $774,138.84  |  RMC - 643404001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SHORT-LINE CORPORATION
T&L CLEANING SERVICES LLC
ROSS SA ENTERPRISE LLC
VANN/ELLI, INC.
MOBILIZATION (CALLOUT)
EA 30.000 $1,135.860 $1.000 $1.000 $1.000 $2,000.000
MOBILIZATION (EMERGENCY)
EA 8.000 $1,947.560 $1.000 $1.000 $1.000 $4,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 5,000.000 $25.800 $1.000 $30.000 $27.000 $28.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,255.890 $3,000.000 $1,500.000 $1,500.000 $2,200.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 200.000 $12.340 $5.000 $1.000 $10.000 $35.000
SHORT RADIUS
LF 50.000 $43.210 $50.000 $20.000 $50.000 $525.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 4.000 $400.000 $1,000.000 $1.000 $500.000 $1,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 15.000 $1,096.920 $2,000.000 $1,200.000 $950.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $1.230 $100.000 $0.010 $5.000 $5.000
REALIGN EXISTING RAIL
LF 100.000 $5.190 $10.000 $1.000 $10.000 $8.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 200.000 $32.610 $1.000 $1.000 $40.000 $75.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 200.000 $66.930 $1.000 $1.000 $40.000 $80.000
REALIGN POSTS
EA 40.000 $12.170 $1.000 $1.000 $50.000 $25.000
REMOVE & REPLACE BLOCKOUT
EA 50.000 $23.200 $1.000 $1.000 $20.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 200.000 $29.000 $1.000 $1.000 $40.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 96.000 $246.210 $1.000 $1.000 $100.000 $100.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $159.450 $1.000 $1.000 $50.000 $500.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 60.000 $3,818.570 $5,000.000 $3,300.000 $3,500.000 $4,400.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $979.100 $1,000.000 $1,000.000 $1,000.000 $1,200.000
REM & RESET SGT IMPACT HEAD
EA 10.000 $120.950 $100.000 $1.000 $350.000 $200.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $33.470 $100.000 $1.000 $50.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $36.940 $100.000 $1.000 $65.000 $90.000
REPLACE SGT STRUT
EA 10.000 $29.920 $100.000 $1.000 $75.000 $85.000
REPLACE SGT OBJECT MARKER
EA 5.000 $25.640 $100.000 $1.000 $100.000 $30.000
REPAIR STEEL POST WITH BASE PLATE
EA 20.000 $241.220 $300.000 $1.000 $180.000 $500.000
REPLACE POSTS (TL-4)
EA 2,000.000 $103.490 $1.000 $75.000 $50.000 $340.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $468.120 $100.000 $1.000 $135.000 $500.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 50.000 $114.170 $100.000 $1.000 $1.000 $75.000
REPLACE CABLE (TL-4)
LF 2,000.000 $2.620 $1.000 $1.000 $1.000 $7.000
CHECK / RE-TENSION CABLE
EA 10.000 $197.220 $1,500.000 $1.000 $1,000.000 $500.000
REPLACE POST HARDWARE (TL-4)
EA 2,000.000 $16.950 $0.010 $1.000 $25.000 $65.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 20.000 $101.900 $200.000 $150.000 $50.000 $300.000
TMA (STATIONARY)
DAY 25.000 $122.770 $1,000.000 $1,200.000 $6,400.000 $300.000
Totals: $774,138.840 $498,349.000 $580,268.000 $764,363.000 $1,511,100.000