Show Job Controls
Bid Cobra

ERATH US0377 (6383-78-001)

Items: 14

County: ERATH
Length: N/A
Highway: US0377
District: FORT WORTH
Control Number: 6383-78-001
DBE Goal: N/A
Project: RMC - 638378001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $205,087.55
Date: 02/17/2022 (4 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$205,087.55
$163,788.00
Over/Under Est: -20.14% -$41,299.55
Over/Under Est: 1.38% $2,824.45
Amt Left: 26.94% $44,124.00
$248,690.00
Over/Under Est: 21.26% $43,602.45
Amt Left: 51.84% $84,902.00
Delta: -19.61% -$40,778.00
Over/Under Est: 42.13% $86,412.45
Amt Left: 77.97% $127,712.00
Delta: -17.21% -$42,810.00

Bid Items & Bid Tabulations

14 Total 0 of 14
ERATH  |  US0377  |  FORT WORTH  |  6383-78-001  |  02/17/2022  |  $205,087.55  |  RMC - 638378001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SHORT-LINE CORPORATION
ABOVE ALL CONSTRUCTION
VANN/ELLI, INC.
SYNERGY SIGNS & SERVICES LLC
MOBILIZATION (CALLOUT)
EA 12.000 $711.770 $1.000 $1.000 $500.000 $5,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $23.510 $125.000 $50.000 $31.000 $26.000
REMOVE METAL BEAM GUARD FENCE
LF 250.000 $3.210 $1.000 $1.000 $3.000 $10.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 500.000 $15.170 $1.000 $25.000 $25.000 $16.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 150.000 $56.980 $1.000 $30.000 $65.000 $40.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 10.000 $52.780 $1.000 $100.000 $75.000 $150.000
REALIGN POSTS
EA 100.000 $24.790 $1.000 $10.000 $20.000 $30.000
REMOVE & REPLACE BLOCKOUT
EA 150.000 $48.950 $1.000 $10.000 $20.000 $24.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 50.000 $32.760 $1.000 $50.000 $33.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 5.000 $70.800 $1.000 $500.000 $80.000 $50.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 50.000 $3,057.660 $3,000.000 $3,500.000 $4,000.000 $3,800.000
REPLACE SGT OBJECT MARKER
EA 1.000 $24.010 $1.000 $100.000 $40.000 $50.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $250.000 $1.000 $200.000 $375.000 $500.000
TMA (STATIONARY)
DAY 50.000 $190.250 $1.000 $1.000 $100.000 $150.000
Totals: $205,087.550 $163,788.000 $207,912.000 $248,690.000 $291,500.000